HomeMy WebLinkAboutAgenda Report - March 3, 2021 C-03AGENDA ITEM (2063
CITY OF LODI
COUNCIL COMMUNICATION
TM
AGENDA TITLE: Adopt Resolution Awarding Contract for Hutchins Street Square, Crete Hall,
Flooring Replacement, to Harold W. Thompson, Inc., of Stockton ($42,011),
Authorizing City Manager to Execute Change Orders ($5,000), Accepting Donation
from Hutchins Street Square Foundation ($26,000), and Appropriating Funds
($50,000)
MEETING DATE:
PREPARED BY:
March 3, 2021
Public Works Director
RECOMMENDED ACTION: Adopt resolution awarding contract for Hutchins Street Square, Crete
Hall, Flooring Replacement, to Harold W. Thompson, Inc., of Stockton,
in the amount of $42,011, authorizing City Manager to execute change
orders in an amount not to exceed $5,000, accepting donation from Hutchins Street Square Foundation in
the amount of $26,000, and appropriating funds in the amount of $50,000.
BACKGROUND INFORMATION: In 1998, the City completed a major remodel of the conference and
performing arts center at Hutchins Street Square. The project
remodeled a multipurpose building that includes Camp Hutchins,
administration offices, conference rooms, a kitchen, restrooms, and a multipurpose hall, now known as
Crete Hall. These building had been a part of the Lodi Union High School (LUHS) prior to the City owning
the facility.
Crete Hall, which was originally the Lodi Union High School cafeteria, is approximately 3,800 square feet
and has a combination of carpet and linoleum. With years of regular use, the flooring is in need of
replacement. Photos of the existing flooring are shown on Exhibit A.
This project will remove the carpet and install approximately 3,920 square feet of heavy commercial vinyl
planks in Crete Hall, as well as, an adjacent storage room. The flooring type was elected by the Hutchins
Street Square Foundation (HSSF) and is similar to flooring installed in the Holtz Room approximately four
years ago. This project will also remove and replace the base molding around the perimeter flooring.
Specifications for this project were approved on January 6, 2021. The City received the following two
bids for this project on January 27, 2021:
Bidder Location
Bid
Alternate
Above/(Below)
Estimate
Engineer's Estimate
$ 28,000.00
$ 5,000.00
Harold W. Thompson, Inc. Stockton
$ 35,324.00
$ 6,687.00
$ 9,011.00
Selway Construction, Inc. San Jose
$ 58,500.00
$ 3,000.00
$28,500.00
The alternate bid item includes installing an additional moisture barrier, if determined necessary upon
removal of the carpeted areas. The moisture barrier will provide additional protection and increase the
life of the flooring.
APPROVED: t
tephen abauer, City Manager
K\wP\PROJECTS\MISC\HSS Floor Replacement\Crete Hall\CAward.doc 2/17/2021
Adopt Resolution Awarding Contract for Hutchins Street Square, Crete Hall, Flooring Replacement, to Harold W. Thompson, Inc , of Stockton ($42,011), Authorizing
City Manager to Execute Change Orders ($5,000), Accepting Donation from Hutchins Street Square Foundation ($26,000), and Appropriating Funds ($50,000)
March 3, 2021
Page 2
The total project cost is expected to be approximately $50,000, including project contingencies,
engineering and inspection. The HSSF has generously committed approximately $26,000 for this
project. The donation letter is attached as Exhibit B.
Staff recommends awarding contract for Hutchins Street Square, Crete Hall, Flooring Replacement, to
Harold W. Thompson, Inc., of Stockton, in the amount of $42,011, authorizing City Manager to execute
change orders in an amount not to exceed $5,000, accepting donation from Hutchins Street Square
Foundation in the amount of $26,000, and appropriating funds in the amount of $50,000.
FISCAL IMPACT: Upgrading the flooring to a more resilient and visually pleasing material is
expected to revenue while minimizing cleaning costs.
FUNDING AVAILABLE: HSSF Donation $26,000
Requested Appropriation:
Parks Capital (43299000.77020) $50,000
Andrew Keys
Andrew Keys
Deputy City Manager/Internal Services Director
Charles E. Swimley, Jr.
Public Works Director
Prepared by Sean Nathan, Senior Civil Engineer
CES/SN/tc
Attachments
Cc: PRCS Director
Senior Civil Engineer Nathan
K:\WP\PROJECTS\MISC\HSS Floor Replacement\Crete Hall\CAward.doc 2/17/2021
Exhibit A
ffHUTCHINS
REET SQUARE
UNDATION
HUTCHINS STREET SQUARE FOUNDATION
Josh Elson February 11, 2021
Chairman
Daphne Felde
Cathi DeGroot
Vice -Chairman
Deputy Director
Bradley Alderson
PRC Services
Secretary
230 W Elm St,
Lodi, CA 95240
Cathy Wetmore
Treasurer
Bob Colarossi
Hello Cathi,
Sam Harper
Meghan Lange
John Ledbetter
At the November 3, 2020 HSSF board meeting we agreed to donate $26,000
Josh Newfield
to the City of Lodi to be applied towards the cost of replacing the floor
covering in Crete Hall at Hutchins Street Square.
Senior Advisors
Dennis Bennett
Bruce Burlington
The Foundation will provide the funds to the City of Lodi upon Council
Julia Gillespie
approval of the project.
Jeffrey Kirst
Charlene Lange
Chuck Simpson
Sincerely,
Cathi DeGroot
City of Lodi Liaison
Daphne Felde
Vice -Chairman
Hutchins and Oak Streets ❑ P. O. Box 2278 ❑ Lodi, CA 95241-2278 ❑ 209.366-1222
FAX 209.366-1222 ❑ E-mail: hssfoundation@gmail.com
❑ www.hssfoundation.com
HUTCHINS STREET SQUARE
CRETE HALL FLOORING REPLACEMENT
125 South Hutchins Street
CITY OF LODI, CALIFORNIA
CONTRACT
THIS CONTRACT made by and between the CITY OF LODI, State of California, herein
referred to as the "City," and HAROLD W. THOMPSON, INC., a California corporation,
herein referred to as the "Contractor."
WITNESSETH;
That the parties hereto have mutually covenanted and agreed, and by these presents do
covenant and agree with each other, as follows:
The complete Contract consists of the following documents which are incorporated
herein by this reference, to -wit:
Notice Inviting Bids
Information to Bidders
Certifications and Forms
General Provisions
Federal Requirements
Special Provisions
Bid Proposal
Contract
Contract Bonds
Federal Minimum Wage Rates
Plans
Addenda
The July 1992 Edition,
Standard Specifications,
State of California,
Business and Transportation Agency,
Department of Transportation
All of the above documents, sometimes hereinafter referred to as the "Contract
Documents," are intended to cooperate so that any work called for in one and not
mentioned in the other is to be executed the same as if mentioned in all said
documents.
ARTICLE I - That for and in consideration of the payments and agreements hereinafter
mentioned, to be made and performed by the City and under the condition expressed in
the two bonds bearing even date with these presents and hereunto annexed, the
Contractor agrees with the City, at Contractor's cost and expense, to do all the work and
furnish all the materials except such as are mentioned in the specifications to be
furnished by the City, necessary to construct and complete in a good workmanlike and
substantial manner and to the satisfaction of the City the proposed improvements as
shown and described in the Contract Documents which are hereby made a part of the
Contract.
ARTICLE 11 - The City hereby promises and agrees with the Contractor to employ, and
does hereby employ, the Contractor to provide all materials and services not supplied by
the City and to do the work according to the terms and conditions for the price herein,
and hereby contracts to pay the same as set forth in Section 5.600, "Measurement,
Acceptance and Payment," of the General Provisions, in the manner and upon the
conditions above set forth; and the said parties for themselves, their heirs, executors,
administrators, successors and assigns, do hereby agree to the full performance of the
covenants herein contained.
CONTRACT 4.1 02/08/21
ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7,
Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the
general prevailing wage rate and other employer payments for health and welfare,
pension, vacation, travel time, and subsistence pay, apprenticeship or other training
programs. The responsibility for compliance with these Labor Code requirements is on
the prime contractor.
ARTICLE IV - And the Contractor agrees to receive and accept the following prices as
full compensation for furnishing all materials and for doing all the work contemplated
and embraced in this agreement; also for all loss or damage arising out of the nature of
the work aforesaid or from the action of the elements, or from any unforeseen difficulties
or obstructions which may arise or be encountered in the prosecution of the work until
its acceptance by the City, and for all risks of every description connected with the work;
also for all expenses incurred by or in consequence of the suspension or discontinuance
of work and for well and faithfully completing the work, and the whole thereof, in the
manner and according to the Plans and Contract Documents and the requirements of
the Engineer under them, to -wit:
The work consists of removing carpet (1,070 square feet), installing approximately
3,920 square feet of heavy commercial vinyl planks on the existing linoleum, replacing
the existing adjacent base molding, and other incidental and related work as described
in the specifications for the project.
For additional bid item descriptions refer to Section 6-07 "Description of Bid Items",
CONTRACT ITEMS
Description
Unit Cost
Remove Carpet and Install New
Flooring and Base Molding 1 LS $35,324.00
ADDITIVE ALTERNATE
Total
$35,324.00
Item Description Qty Unit Unit Cost Total
ALT Install Moisture Barrier in 1 LS687.00
Existing Carpetted Area $6,687.00 $6,
TOTAL $ 42,011.00
ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the
provisions of Section 3700 of the Labor Code, which requires every employer to be
insured against liability for workers' compensation or to undertake self-insurance in
accordance with the provisions of that code, and I will comply with such provisions
before commencing the performance of the work of this contract.
ARTICLE Vi - It is further expressly agreed by and between the parties hereto that,
should there be any conflict between the terms of this instrument and the Bid Proposal
of the Contractor, then this instrument shall control and nothing herein shall be
considered as an acceptance of the said terms of said proposal conflicting herewith.
CONTRACT 4.2 02/08/21
ARTICLE V11 - The City is to furnish the necessary rights-of-way and easements and to
establish lines and grades for the work as specified under the Special Provisions. All
labor or materials not mentioned specifically as being done by the City will be supplied
by the Contractor to accomplish the work as outlined in the specifications.
ARTICLE Vlli - The Contractor agrees to commence work pursuant to this contract
within 15 calendar days after the City Manager, or as agreed-upon by the City and the
Contractor in writing has executed the contract and to diligently prosecute to completion
within 14 CALENDAR DAYS. The calendar day count may pause or delay while
equipment is being ordered. Additionally, the resurfacing and striping may be delayed
should the weather necessitate.
ARTICLE IX - State of California Senate Bill 854 requires the following:
No contractor or subcontractor may be listed on a bid proposal for a public works
project unless registered with the Department of Industrial Relations pursuant to
Labor Code section 1725.5 [with limited exceptions from this requirement for bid
purposes only under Labor Code section 1771.1(a)].
No contractor or subcontractor may be awarded a contract for public work on a
public works project unless registered with the Department of Industrial Relations
pursuant to Labor Code section 1725.5.
This project is subject to compliance monitoring and enforcement by the
Department of Industrial Relations.
ARTICLE X - Counterparts and Electronic Signatures
This Agreement and other documents to be delivered pursuant to this Agreement may
be executed in one or more counterparts, each of which will be deemed to be an original
copy and all of which, when taken together, will be deemed to constitute one and the
same agreement or document, and will be effective when counterparts have been
signed by each of the parties and delivered to the other parties. Each party agrees that
the electronic signatures, whether digital or encrypted, of the parties included in this
Agreement are intended to authenticate this writing and to have the same force and
effect as manual signatures. Delivery of a copy of this Agreement or any other
document contemplated hereby, bearing an original manual or electronic signature by
facsimile transmission (including a facsimile delivered via the Internet), by electronic
mail in "portable document format" (".pdf') or similar format intended to preserve the
original graphic and pictorial appearance of a document, or through the use of electronic
signature software will have the same effect as physical delivery of the paper document
bearing an original signature.
CONTRACT 4.3 02/08121
WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME
OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE
CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET
FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR
AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE
CONTRACTOR UNDER THE CONTRACT.
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands
the year and date written below.
-CONTRACTOR:---CI-T-Y--OF L -ODI, a municipal corporation ---
By: By:
Title
By:
STEPHEN SCHWABAUER
City Manager
Date,
Attest:
JENNIFER CUSMIR
City Clerk
(CORPORATE SEAL) Approved As To Form:
JANICE D. MAGDICH jdm
City Attorney
CONTRACT 4.4 02/08/21
Capital Improvement Plan
FY 2020-2021
Project Title: Crete Hall Flooring Replacement Munis Project Code: CIP List Proj #
Section I Description Project Length Priority
Remove carpet and install approximately 3,920 square feet of vinyl planks in Crete Hall at Hutchins Street Square
IJ ustificatio nlfactor
Additional Information
Of the $50,000 budget, $26,000 will come from a donation from the Hutchins Street Square Foundation
Section II
Expenditure Prior Years FY 19120 FY 20121
Estimate Budget
Contracts $ $ 50,000
Total Capital Costs $ - $ - $ 50,000 $
Section III
Funding Source(s) Prior Years FY 19120 FY 20121
Estimate Budget
432 - Parks&Rec Capital $ $ 50,000
Total Project Financing $ $ - $ 50,000 $
Section IV
Operating Cost or Prior Years FY 19120 FY 20121
(savings) Estimate Budget
Personnel $
Other Operating Costs $
Total Operating Impact $ $ - $ $
Estimated Project Costs
FY 21122 FY 22123 FY 23124 1 FY 24125 Future Yrs Total
Funding Sources/Methods of Financing
FY 21122 FY 22123 FY 23124 FY 24125 Future Yrs
F—$ I$
$
Operating Budget Impact
FY 21122 FY 22123 FY 23124 FY 24125 Future Yrs
Total
Total
50,000
50,000
50,000
50,000
AGENDA ITEM 12 1W 3
CITY OF LODI
q COUNCIL COMMUNICATION
TM
AGENDA TITLE: Adopt Resolution Awarding Contract for Hutchins Street Square, Crete Hall,
Flooring Replacement, to Harold W. Thompson, Inc., of Stockton ($42,011),
Authorizing City Manager to Execute Change Orders ($5,000), Accepting Donation
from Hutchins Street Square Foundation (;' ,000), and Appropriating Funds
($50,000)
MEETING DATE:
PREPARED BY:
March 3, 2021
Public Works Director
RECOMMENDED ACTION: Adopt resolution awarding contract for Hutchins Street Square, Crete
Hall, Flooring Replacement, to Harold W. Thompson, Inc., of Stockton,
in the amount of $42,011, authorizing City Manager to execute change
orders in an amount not to exceed $5,000, accepting donation from Hutchins Street Square Foundation in
the amount of $2#635,000, and appropriating funds in the amount of $50,000.
BACKGROUND INFORMATION: In 1998, the City completed a major remodel of the conference and
performing arts center at Hutchins Street Square. The project
remodeled a multipurpose building that includes Camp Hutchins,
administration offices, conference rooms, a kitchen, restrooms, and a multipurpose hall, now known as
Crete Hall. These building had been a part of the Lodi Union High School (LUHS) prior to the City owning
the facility.
Crete Hall, which was originally the Lodi Union High School cafeteria, is approximately 3,800 square feet
and has a combination of carpet and linoleum. With years of regular use, the flooring is in need of
replacement. Photos of the existing flooring are shown on Exhibit A.
This project will remove the carpet and install approximately 3,920 square feet of heavy commercial vinyl
planks in Crete Hall, as well as, an adjacent storage room. The flooring type was elected by the Hutchins
Street Square Foundation (HSSF) and is similar to flooring installed in the Holtz Room approximately four
years ago. This project will also remove and replace the base molding around the perimeter flooring.
Specifications for this project were approved on January 6, 2021. The City received the following two
bids for this project on January 27, 2021:
Bidder Location
Bid
Alternate
Above/(Below)
Estimate
Engineer's Estimate
$ 28,000.00
$ 5,000.00
Harold W. Thompson, Inc. Stockton
$ 35,324.00
$ 6,687.00
$ 9,011.00
Selway Construction, Inc. San Jose
$ 58,500.00
$ 3,000.00
$28,500.00
The alternate bid item includes installing an additional moisture barrier, if determined necessary upon
removal of the carpeted areas. The moisture barrier will provide additional protection and increase the
life of the flooring.
APPROVED: SteveSchwabauer
Stephen Schwabauer, City Manager
KAWP\PROJECTSWIISC\HSS Floor Replacement\Crete Hall\CAward doc
3/2/2021
Adopt Resolution Awarding Contract for Hutchins Street Square, Crete Hall, Flooring Replacement, to Harold W. Thompson, Inc , of Stockton ($42,011), Authorizing
City Manager to Execute Change Orders ($5,000), Accepting Donation from Hutchins Street Square Foundation (S:' : > .:,000), and Appropriating Funds ($50,000)
March 3, 2021
Page 2
The total project cost is expected to be approximately $50,000, including project contingencies,
engineering and inspection. The HSSF has generously committed approximately $2-35,000 for this
project. The donation letter is attached as Exhibit B.
Staff recommends awarding contract for Hutchins Street Square, Crete Hall, Flooring Replacement, to
Harold W. Thompson, Inc., of Stockton, in the amount of $42,011, authorizing City Manager to execute
change orders in an amount not to exceed $5,000, accepting donation from Hutchins Street Square
Foundation in the amount of $ ' :.: ;,000, and appropriating funds in the amount of $50,000.
FISCAL IMPACT: Upgrading the flooring to a more resilient and visually pleasing material is
expected to revenue while minimizing cleaning costs.
FUNDING AVAILABLE: HSSF Donation: $2635,000
Requested Appropriation:
Parks Capital (43299000.77020): $50,000
Andrew Keys
Andrew Keys
Deputy City Manager/Internal Services Director
Prepared by Sean Nathan, Senior Civil Engineer
CES/SN/tc
Attachments
Cc: PRCS Director
Senior Civil Engineer Nathan
Signature: anj� xe,�Pj
Email: akeys@lodi.gov
Charles E. Swimiey, Jr.
Public Works Director
Signature:
Email: sschwabauer@lodi.gov
K:\WP\PROJECTS\MISC\HSS Floor Replacement\Crete Hall\CAward doc 3/2/2021
91
THUTCHINS
REET SQUARE
UN DATION
HUTCHINS STREET SQUARE FOUNDATION
Josh Elson
March 1, 2021
Chairman
Daphne Felde
Cathi DeGroot
Vice -Chairman
Deputy Director
Bradley Alderson
PRC Services
Secretary
230 W Elm St,
Dennis Bennett
Lodi, CA 95240
Cathy Wetmore
At today's meeting we voted to increase that donation to $35,000 in light of
Treasurer
the higher bids the City received.
Bob Colarossi
Hello Cathi,
Sam Harper
Meghan Lange
John Ledbetter
At the November 5, 2021 HSSF board meeting we agreed to donate $26,000
Josh Newfield
to the City of Lodi to be applied towards the cost of replacing the floor
covering in Crete Hall at Hutchins Street Square.
Senior Advisors
Dennis Bennett
Bruce Burlington
At today's meeting we voted to increase that donation to $35,000 in light of
Julia Gillespie
the higher bids the City received.
Jeffrey Kirst
Charlene Lange
Chuck Simpson
The Foundation will provide the funds to the City of Lodi upon completion of
the project.
Cathi DeGroot
City of Lodi Liaison
Sincerely,
Daphne Felde
Vice -Chairman
Hutchins and Oak Streets ❑ P. O. Box 2278 ❑ Lodi, CA 95241-2278 ❑ 209.366-1222
FAX 209.366-1222 ❑ E-mail: hssfoundation@gmail.com
❑ www.hssfoundation.com
RESOLUTION NO. 2021-46
A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE CONTRACT
FOR HUTCHINS STREET SQUARE, CRETE HALL, FLOORING
REPLACEMENT, TO HAROLD W. THOMPSON, INC., OF STOCKTON;
AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDERS;
ACCEPTING A DONATION FROM THE HUTCHINS STREET SQUARE
FOUNDATION; AND FURTHER APPROPRIATING FUNDS
WHEREAS, in answer to notice duly published in accordance with law and the order of
this City Council, sealed bids were received and publicly opened on January 27, 2021, at
11:00 a.m., for Hutchins Street Square, Crete Hall, Flooring Replacement, described in the
plans and specifications therefore approved by the City Council on January 6, 2021; and
WHEREAS, said bids have been checked and tabulated and a report thereof filed with
the City Manager as follows:
Bidder Location Bid Alternate Above/(Below)
Estimate
Harold W. Thompson, Inc. Stockton $ 35,324 $ 6,687 $ 9,011
Selway Construction, Inc. San Jose $ 58,500 $ 3,000 $28,500
WHEREAS, the alternate bid item includes installing an additional moisture barrier, if
determined necessary upon removal of the carpeted areas. The moisture barrier will provide
additional protection and increase the life of the flooring; and
WHEREAS, staff recommends awarding the contract for Hutchins Street Square, Crete
Hall, Flooring Replacement to Harold W. Thompson, Inc., of Stockton, in the amount of $42,011;
and
WHEREAS, staff also recommends that the City Council authorize the City Manager to
execute change orders in an amount not to exceed $5,000; and
WHEREAS, staff also recommends that the City Council accept a donation from Hutchins
Street Square Foundation in the amount of $35,000; and
WHEREAS, staff recommends that the City Council appropriate funds in the amount of
$50,000 from the fund balance of Parks Capital (43299000.77020) for Fiscal Year 2020.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award
the contract for Hutchins Street Square, Crete Hall, Flooring Replacement to
Harold W. Thompson, Inc., of Stockton, California, in the amount of $42,011; and
BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize the
City Manager to execute the contract and change orders in an amount not to exceed $5,000; and
BE IT FURTHER RESOLVED that the Lodi City Council does hereby accept a donation
from Hutchins Street Square Foundation in the amount of $35,000; and
BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize an
appropriation for Hutchins Street Square, Crete Hall, Flooring Replacement, in the amount of
$50,000, as set forth above; and
BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol
Manual (adopted 11/6/19, Resolution No. 2019-223), the City Attorney is hereby authorized to
make minor revisions to the above -referenced document(s) that do not alter the compensation or
term, and to make clerical corrections as necessary.
Dated: March 3, 2021
I hereby certify that Resolution No. 2021-46 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held March 3, 2021 by the following vote:
AYES: COUNCIL MEMBERS — Chandler, Hothi, Khan, Kuehne, and
Mayor Nakanishi
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN. COUNCIL MEMBERS — None
CityIF C dM�
Cler
2021-46