HomeMy WebLinkAboutAgenda Report - March 17, 2021 C-15AGENDA ITEM C-1 5 CITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: First and Second Quarters Fiscal Year 2020/21 Water, Wastewater and Electric Utility Department Financial Reports MEETING DATE: March 17, 2021 PREPARED BY: Deputy City Manager RECOMMENDED ACTION: Receive utility financial reports for the first and second quarters of Fiscal Year 2020/21. BACKGROUND INFORMATION- In accordance with the Lodi Municipal Code, quarterly financial reports are to be prepared for the Water, Wastewater, and Electric Utilities. Quarterly update presentations have been included in this report and a highlight of activities and progress is outlined below for each utility. Electric Utility Financial Highlights REVENUE is stable tracking at 61 percent of budget. ✓ Energy sales are tracking at 60 percent of budget due primarily to the August heat event, and increased energy usage due to the stay at home order(s) issued in response to the pandemic. Also, energy sales tend to track higher during the early, warmer months of the fiscal year. ✓ In addition, the utility is tracking higher than estimated interest income and payments received by others for work performed by utility personnel. EXPENSES are tracking at nearly 50 percent of budget halfway through the year. ✓ Non -power operating expenses are tracking at just over 40 percent of budget. ✓ Power supply costs are tracking at 55 percent of budget. It is anticipated that power supply costs will exceed original budget estimates and will be addressed as part of midyear budget review and adjustments. Increased energy usage, as noted above, coupled with less than ideal hydro conditions have resulted in costs tracking higher than original estimates. ✓ Capital outlay expenses are tracking at 20 percent of budget. Approximately 35 percent of the total capital budget is allocated to the utility's building renovation project for which construction activities are scheduled to start by late spring/early summer. RESERVES as of December 31, 2020 totaled approximately $44.6 million. These reserves are used to fund pay-as-you-go capital improvement and system maintenance projects. CAPITAL IMPROVEMENT PROJECTS includes over $20 million over 5 years for capital improvement efforts. The projects listed are included in the City's current Capital Improvement Program included in the adopted budget. 5 -YEAR FINANCIAL FORECAST indicates sufficient reserves over the next 5 years as capital efforts continue. w. APPROVED:. Stephen Schwabauer, City Manager Wastewater Utility Highlights • REVENUE is stable tracking at 52 percent of budget. ✓ Wastewater sales for the first half of the fiscal year ended on target at 51 percent of budget. • EXPENSES as a total ended the second quarter well below the budget at 34 percent. ✓ Operating expenses for the second quarter ended slightly lower than budget at 44 percent. ✓ Capital expenses for the second quarter were below budget at 15 percent. Included in the capital budget is $2.5 million for the Main Replacement project 8 which was bid in the third quarter and awarded in the fourth quarter of last fiscal year with the majority of this expense occurring in fiscal year 2021. Major projects also included in the budget is $750,000 for the Storm Drain Trash Handling project, $1.2 million for the design of the White Slough electrical building, $1.2 million for the fan press replacement, $1 million for the aeration diffuser replacement, $750,000 for blower upgrades and $500,000 for the Digester #3 cleaning at White Slough. • RESERVES as of December 31, 2020 totaled $17.6 million which is 575 percent of the 90 days cash target. These reserves are used to fund pay-as-you-go capital improvement projects planned over the next several fiscal years and are expected to trend downward as projects are constructed. • CAPITAL IMPROVEMENT PROJECTS include almost $26.5 million in planned projects over the next 5 years. The major projects include main replacement projects, construction of the electrical building, fan press replacement, aeration diffuser replacement, irrigation improvements and the storm drain trash handling systems to comply with state regulations. The projects listed are all in the fiscal year 20-25 Capital Improvement Program that was included in the adopted budget. • 5 -YEAR FINANCIAL FORECAST indicates a decline in reserves through fiscal year 2024. Water Utility Highlights REVENUE is stable tracking at 67 percent of budget. ✓ Water sales for the first half of the fiscal year ended above target at 66 percent of budget attributed to seasonal usage during the warm summer months ✓ Other revenue is tracking high due to the Build America Bond subsidy that was received is was not included in the original budget revenue estimates. EXPENSES as a total ended the second quarter well below the budget at 33 percent. ✓ Operating expenses for the second quarter ended on target at 50 percent of budget. ✓ Capital expenses for the second quarter ended well below budget at 23 percent. Included in the capital budget is almost 2.9 million for the Water Meter Project Phase 8 which was carried over from the prior fiscal year and is projected to be fully expensed by the end of this fiscal year. Major projects also included in the budget are $1.1 million for the Well 27 GAC, $1.5 million for the Well 28 GAC, $450,000 for the 2020 Well Rehab project. RESERVES as of December 31, 2020 totaled $6 million which is 278 percent of the 90 days cash target. These reserves are used to fund pay-as-you-go capital improvement projects. CAPITAL IMPROVEMENT PROJECTS include $16 million in planned projects over the next five years. The major projects include the completion of phase 8 and multi -family phase of the meter program, GAC treatment projects. The projects listed are all in the fiscal year 20-25 Capital Improvement Program that was included in the adopted budget. 5 -YEAR FINANCIAL FORECAST indicates a slight decline in reserves in fiscal year 2021 and then begins to increase through fiscal year 2024 due to the completion of the meter project and then forecasts sufficient reserves through fiscal year 2025. FISCAL IMPACT: There is no fiscal impact from the preparation of this report. FUNDING AVAILABLE: Adequate funding is available in the Fiscal Year 2020/21 budget, as amended by Council action from time to time, for the items in this report. All data is presented as current as of the date(s) obtained from the City's financial reporting system. Final year-end audited data will be provided in the City's CAFR. Andrew Keys Deputy City Manager/Intemal Services Director OF 00 C,4IIFO ' Electric Utility Department IFY 20 Quarterly Update (Ending December 31, 2020) City Council Meeting March 17, 2021 Electric Utility Fund Cash Flow Summary (December 31, 2020) Revenue Budget Actual % of Budget Sales Revenues 70,860,780 42,735,672 60% Development Impact Fees 328,890 272,232 83% Other Revenues (interest, misc) 3,378,010 2,693,820 80% Total Revenues 74,567,680 45,701,724 OF- -11111111111F� 61% Purchase Power 41,307,930 22,513,917 55% Non Power 16,589,952 6,821,764 41% Capital Projects 6,909,044 1,372,041 20% Debt Service 4,429,010 2,808,080 63% Cost of Service 2,275,670 1,137,835 50% In -lieu Transfer to General Fund 7,375,170 3,687,585 50% Total Expenses 78,886,776 38,341,222 49% Beginning Cash Balance (6/30/20) 38,969,879 Ending Cash Balance (12/31/20) 44,650,103 Reserve Policy Target 23,658,000 % of Target 189% K Electric Utility Funds Cash Balances (December 31, 2020) Operating Funds $ 3114091254 Utility Outlay Reserve Fund $ 1,000,000 Public Benefits Fund $ 3,385,443 Impact Fee Fund $ 1,4241056 Solar Surcharge Fund $ 338,449 Greenhouse Gas Fund $ 7,092,901 Total $ 4496509103 Electric Utility Reserve Policy (December 31, 2020) *Includes cash held locally and at NCPA $50,000 $45,000 $40,000 $35,000 $30,000 0 c $25,000 +h $20,000 $15,000 $10,000 $5,000 Actual Reserves vs. Target FY 16/17 FY 17/18 FY 18/19 FY 19/20 FY 20/21 ■ Actual ❑ Target Cash balances support City Council approved reserve requirements and provide funds for pay as you go Capital Improvement Projects. n Capital Improvement Project 5 -Year Spending Plan Project Capacity Program FY 20-21 Budget $526,964 FY 21-22 Forecast $0 FY 22-23 Forecast $1,100,000 FY 23-24 Forecast $0 FY 24-25 Forecast $0 Underground/ Overhead Maint $2,701,000 $1,610,000 $1,342,700 $1,342,700 $11200,000 Streetlight Maintenance / Repair $50,000 $50,000 $50,000 $50,000 $50,000 LED Streetlight Improvements $150,000 $150,000 $150,000 $150,000 $150,000 230 kV Interconnection Project* $112,502 $0 $0 $0 $0 Substation Maint/ Improvements $256,990 $0 $300,000 $1,775,000 $0 Building & Security Improvements $2,556,588 $350,000 $0 $0 $0 Work for Others $300,000 $550,000 $550,000 $550,000 $550,000 Vehicles & Equipment $255,000 $847,000 $330,000 $680,000 $444,000 Total Projects $6,909,044 $3,557,000 $3,822,700 $4,547,700 $2,394,000 *Includes planning and design costs only - construction costs estimated at -$30M and will be debt financed 5 5 -Year Financial Forecast Looking Ahead • Represents preliminary estimated actuals for FY 20/21 based on midyear review • Forecast assumes funding of all budgeted full-time positions in future years Ce EstimatedFY 20-21 FY 21-22 Forecast FY 22-23 Forecast FY 23-24 Forecast FY 24-25 Forecast Available Cash $37,636,669 $37,435,146 $36,228,136 $33,866,877 $32,943,062 Days Cash 181 176 167 155 148 Reserve Target $23,658,000 $24,868,550 $25,277,054 $25,481,602 $25,750,876 of Target 159% 150% 143% 133% 128% • Represents preliminary estimated actuals for FY 20/21 based on midyear review • Forecast assumes funding of all budgeted full-time positions in future years Ce Power Sales (December 31, 2020) Power Customer Class Budget 156,663,103 Actual 98,893,675 Small Commercial 152,353,785 83,776,383 Large Commercial/Small Industrial 46,478,459 22,602,638 Industrial 57,602,257 34,462,934 Total 413,097,604 239,735,630 Customer Class Residential $ Budget 29,706,030 $ 19,198,193 ..- Rate $ 0.1941 Small Commercial $ 26,412,710 $ 15,128,400 $ 0.1806 Large Commercial/Small Industrial $ 7,625,560 $ 3,911,040 $ 0.1730 Industrial $ 7,116,480 $ 4,498,039 $ 0.1305 Total $ 70,860,780 $ 42,735,672 $ 0.1783 ECA Revenue (December 31, 2020) Customer Class Total Residential $ 1,312,344 Small Commercial $ 1,217,871 Large Commercial / Small Industrial $ 344,933 Industrial $ 534,718 Total Revenue $ 3,409,866 Electric Utility Fund Operating Results (December 31, 2020) Personnel $ Budget 9,790,860 $ Actual 5,003,347 % of Budget 51% Supplies, Materials, Services $ 4,903,409 $ 1,348,567 28% Other Payments $ 1,806,283 $ 438,260 24% Utilities $ 89,400 $ 31,590 35% Total Operating Expenses $ 16,589,952 $ 6,821,764 41% �01 Power Supply Costs (December 31, 2020) 10 Budget $ 14,980,380 Budget 53% $ 28,184,310 Transmission $ 11,843,870 $ 6,584,389 56% Management Services $ 1,279,750 $ 949,148 74% Total Power Supply Costs $ 41,307,930 $ 22,513,917 55% 10 Q2 — 20211 Q3 — 2021 04-2021 011 - 2022 160,000 140,000 120,000 100,0 0 80,0oc) 60,000 40,000 20,000 Load Coverage MWh Load ROC Matrix Target Load Coverage (Including Purchases) 110,773 8{}_0% 87-8% 136.330 80.0% 87.8% 99.241 70.0% 79.5% 97.631 60.000 68.7% Q2 = 2021 Q3 2021 Q4 - 2421 Q1- 2022 M Coverage �Targ,et -• load • LEU continues to meet or exceed Risk Management targets • Includes purchases approved through March 2021 by the Risk Oversight Committee 11 Risk Oversight Committee (ROC) Report Highlights • Two ROC meetings held July - December 2020 — Forward gas/energy purchases approved to cover open positions 2021-2023 — Approved purchase of RPS eligible products (Portfolio Content Category 3 RECs) — Authorized sale of Low Carbon Fuel Standard (LCFS) credits — Discussed confidential Cap and Trade strategy and activities — Approved and recommended Council adoption of LEU energy storage target — Discussed status of contract negotiations regarding long-term RPS eligible projects, including solar and hydroelectric — Approved payment of NCPA Scheduling Coordination Balancing Account deposit adjustment invoices — Approved and recommended Council approval of Revised Renewables Portfolio Standard (RPS) Procurement Plan & Enforcement Program — Approved and recommended Council approval of Western Area Power Administration Base Resource Contract — Approved and recommended Council approval of 2019 Power Content Label filing 12 • Customer Strategic Areas of Focus Project Highlights — Successfully transitioned to new after-hours answering service — Commenced work on remote connect/disconnect meter project — Added additional funding to Keep Your Cool Program for commercial refrigeration energy efficiency improvements • Technology — Broadband Feasibility Study completed — Commenced work on Wireless Policy (5G Pole Attachment) standards and requirements • Financial — Completed updated Renewables Portfolio Standard Procurement Plan and Enforcement Program — Negotiations continue on two renewable energy projects — Completed first sale of Low Carbon Fuel Standard Credits ($193K) — Work underway to develop new rate tariff for LED Dusk to Dawn lights 13 • Reliability Strategic Areas of Focus Project Highlights (continued) — Contract approved for citywide pole testing and treatment — Adopted updated Wildfire Mitigation Plan — In discussions with Tree Lodi on shade tree program to encourage planting of "power line friendly" vegetation — Commencing work on Physical Security Plan • Workforce Planning — New Line Apprentice hired (from Public Works Department) — Electrical Materials Technician promoted to Utility Warehouse Supervisor — Commenced work on Organizational Gap Analysis and Preferred Work Methods 14 Public Works Department IFOR Water/Wastewater IFY 21 Quarterly Update (Ending December 31, 2020) Wastewater Fund Cash Flow Summary (Ending December 31, 2020) Budget Actuals % of Budget Revenue Sales 15,572,870 8,016,784 51% Development Impact Mitigation Fees 2,437,880 1,396,218 57% Other (interest, septic, misc.) 602,230 358,192 59% Total Revenues 18,612,980 9,771,194 52% Expenses Operating 8,877,790 3,911,725 44% Capital 9,325,654 1,411,807 15% Debt Service 3,340,970 1,839,188 55% Cost of Services Payment To General Fund 1,084,700 542,350 50% Total Expenses 22,629,114 7,705,070 34% Beginning Cash (Operations Only) 16,849,190 Ending Cash (Operations Only) 17,684,736 Days Cash (Excluding Capital) 517 % of Target — 90 Days Cash on Hand 575% Wastewater Operating Results (Ending December 31, 2020) 3 Budget Actuals % of Budget Personnel $ 4,425,200 $ 2,216,291 50% Supplies, Materials, Services $ 2,848,850 $ 845,702 30% Equipment, Land, Structures $ 315,000 $ 60,030 19% Other Payments $ 440,500 $ 356,132 81% Utilities $ 822,430 $ 433,572 53% Work for Others $ 25,810 $ - 0% Total Operating Expenses $ 8,877,790 $ 3,911,725 44% 3 Wastewater Funds Cash Balances (Ending December 31, 2020) Actual Reserves vs. Target 20,000,000 18,000,000 534% 547% 558% 575% 16,000,000 14,000,000 429% 12,000,000 10,000,000 8,000,000 6,000,000 4,000,000 2,000,0000 . . . . . 16/17 17/18 18/19 19/20 20/21 Amounts above reserve target are held for scheduled Target capital maintenance Actual El Operating (530) 1716841736 Utility Capital / Infrastructure Replacement (531) 11200,941 Capital Reserve (532) (Fund used to pay White Slough COP Debt Service) 49,172 Wastewater IMF (533) 2,310,009 Rate Stabilization Reserve (534) 500,000 Storm Drain IMF (535) 2,082,204 Total 23,837,062 Actual Reserves vs. Target 20,000,000 18,000,000 534% 547% 558% 575% 16,000,000 14,000,000 429% 12,000,000 10,000,000 8,000,000 6,000,000 4,000,000 2,000,0000 . . . . . 16/17 17/18 18/19 19/20 20/21 Amounts above reserve target are held for scheduled Target capital maintenance Actual El 5 -Year Financial Forecast FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 Budget Forecast Forecast Forecast Forecast Available Cash Days Cash (90 day target) Minimum Reserve Target (25%) Reserve Target (50%) % of Days Cash Target $14,849,711 $13,515,069 $9,785,369 $4,552,469 $8,118,869 408 363 257 116 229 $3,320,500 $6,641,000 453% $3,397,000 $6,794,000 403% $3,473,000 $3,551,500 $3,232,000 $6,946,000 $7,103,000 $6,464,000 286% 130% 255% 5 Lockeford Street Improvements MSC Fence Storm Drain Trash Handling MSC Security Improvements MUS PW Admin Building Remodel Misc. System Relocations Misc. Wastewater Taps Wastewater Planned Capital Projects Collection System Capacity Enhancement Projects Main Replacement Project Sewer Lift Station Wet Well Rehab Kofu Storm Water Pump Rehab Salas Storm Water Pump Rehab Henry Glaves Storm Water Pump Rehab Peterson Storm Water Pump Rehab Project Planning/Misc. Projects Vehicles/Equipment Upgrade Blowers Irrigation Improvements Digester #3 Cleaning Main Building Rollup Door 2nd Control Room Roof Electrical Room Reroof Plant Maintenance Improvements Compliance Studies and Reports Fan Press Replacement Aeration Difusser Replacement NCPA Maintenance Generator Pump & Equipment Upgrades Electrical/Screen/SCADA Design Electrical Upgrades/SCADA Construction White Slough Recycled Water Storage Mosquito Pond FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 7,545 35,303 750,000 750,000 750,000 750,000 65,728 150,000 35,000 35,000 35,000 35,000 35,000 40,000 40,000 40,000 40,000 40,000 200,000 2,554,780 2,000,000 2,000,000 250,000 200,000 200,000 200,000 200,000 125,000 110,000 75,000 75,000 75,000 450,000 750,000 93,168 750,000 1,000,000 500,000 5,902 11,015 140,593 100,000 110,000 100,000 75,000 200,000 200,000 200,000 200,000 1,138,125 1,000,000 150,000 150,000 150,000 150,000 150,000 110,000 1,210,407 1,000,000 7,000,000 5,500,000 33,278 110,000 Totals $9,325,844 $5,550,000 $7,810,000 $9,050,000 2,900,000 no Water Fund Cash Flow Summary (Ending December 31, 2020) 7 Budget Actuals % of Budget Revenue Sales 11,908,430 7,830,544 66% Development Impact Mitigation Fees 1,135,440 570,605 50% Other (interest, tap fees, water meters, misc.) 827,710 874,281 106% Total Revenues 13,871,580 9,275,430 67% Expenses Operating 7,412,000 3,681,937 50% Capital 10,479,212 2,360,810 23% Debt Service 2,073,650 416,918 20% Cost of Services Payment To General Fund 843,850 421,925 50% Total Expenses 20,808,712 6,881,590 33% Beginning Cash (Operations Only) 5,038,332 Ending Cash (Operations Only) 6,150,021 Days Cash (Excluding Capital) 250 % of Target — 90 Days Cash on Hand 278% 7 Water Operating Results (Ending December 31, 2020) Budget Actuals % of Budget $ 3,198,190 $ 1,634,101 51 Supplies,aterials, Services $ 1,722,390 $ 519,393 30% Land, Structures $ 105,000 $ 20,608 20% [Equipment, ents $ 1,688,520 $ 1,140,032 68% $ 589,050 $ 367,803 62% hers $ 108,850 $ - 0% l Operating Expenses $ 7,412,000 $ 3,681,937 50% Water Funds Cash Balances (Ending December 31, 2020) Actual Reserves vs. Target Operating (560) 6,150,021 Utility Capital / Infrastructure Replacement (561) 3,641,260 IMF (562) 3,093,833 PCE/TCE Settlements 9,303,080 PCE/TCE Rates (565) Es 3,898,606 Total 26,086,800 Actual Reserves vs. Target 8,000,000 274% 7,000,000 278 6,000,000 - - 193 5,000,000 — - — Amounts above reserve target are 4,000,000 — — 133% ■Target held for scheduled 3,000,000 — Actual capital maintenance 2,000,000 — 1,000,000 - 1 A 0 16/17 17/18 18/19 19/20 20/21 W Available Cash Days Cash (90 day target) 5 -Year Financial Forecast FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 Budget Forecast Forecast Forecast Forecast $3,686,581 130 $4,653,050 163 $5,917,150 $8,338,650 202 278 Minimum Reserve $2,582,500 $2,608,000 $2,672,500 $2,737,000 Target (25%) Reserve Target (50%) $5,165,000 $5,216,000 $5,345,000 $5,474,000 % of Days Cash Target 145% 181% 224% 309% $7,256,281 256 $2,805,000 $5,610,000 285% 10 Water Planned Capital Projects Water Meter Program MUS PW Admin Building Remodel MSC Fence Lockeford Street Imprv. Water Taps Misc. Water Mains Water Meter Replacement Program GAC Replacement Meter Shop Design/Construction Water Plant Generator Surface Water Treatment Plant Membrane Repl. Surface Water Treatment Plant Transmission Line MSC Security Improvements 2020 Well Rehab Well 4R & 22 GAC Replacement Well 7 Pump Rehab Well 9 Pump Rehab Well 14 Pump Rehab Well 16 Pump Rehab Well 16 GAC Well 17 Pump Rehab Well 21 Pump Rehab Well 22 Pump Rehab Well 3R Pump Rehab Well 15 Pump Rehab Well 25 Pump Rehab Well 27 GAC Treatment & Standby Generator Well 28 GAC Treatment Project Planning Vehicles/Equipment FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 2,901,010 1,000,000 1,000,000 150,000 86,178 41,505 75,000 75,000 75,000 75,000 75,000 50,000 50,000 50,000 50,000 50,000 75,000 75,000 75,000 75,000 300,000 300,000 300,000 300,000 300,000 200,000 500,000 2,000,000 500,000 70,000 450,000 85,790 171,513 200,000 170,000 166,000 198,000 185,000 200,000 166,000 120,952 200,000 200,000 1,142, 900 1,540,000 25,000 40,000 50,000 50,000 50,000 50,000 Totals $8,513,847 $1,970,000 $1,800,000 $800,000 $3,250,000 11