HomeMy WebLinkAboutAgenda Report - March 17, 2021 C-05AGENDA ITEM Ooe*5 '• CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt Resolution Awarding Contract for 2020 Grape Bowl Handrail Improvement Project to Soracco, Inc., of Lodi ($63,630), and Authorizing City Manager to Execute Change Orders ($10,000) MEETING DATE: March 17, 2021 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution awarding Contract for Grape Bowl Handrail Improvement Project to Soracco, Inc., of Lodi, in the amount of $63,630, and authorizing City Manager to execute change orders in an amount not to exceed $10,000. BACKGROUND INFORMATION. Over the past 20 years, the City has made many improvements to the Grape Bowl to make it safer and more accessible. The existing bleachers were installed over 40 years ago. The aging bleacher steps are unstable, making them a potential hazard. In order to increase stability, the project will include a brace that runs underneath the steps. In addition, a mid -aisle railing will be installed to enhance the safety of the steps and comply with current building code requirements. The improvement locations are shown on Exhibit A. The plans and specifications for this project were approved on December 2, 2020. The City received the following three bids for this project on February 10, 2021: Two alternate designs were prepared, both of which contractors were required to provide a bid. The bid documents identified the "low bidder" based on Bid Alternate 1. The two bid alternates were established to evaluate costs between a more economical design (Alternate 1) and a more structurally robust design (Alternate 2). Staff recommends awarding the Contract for Bid Alternate 2, which will result in less maintenance and a longer useful life. Staff recommends awarding Contract for Grape Bowl Handrail Improvement Project to Soracco, Inc., of Lodi, in the amount of $63,630, and authorizing City Manager to execute change orders in an amount not to exceed $10,000. APPROVED: Steve SchWabaUer Stephen Schwabauer, City Manager \\cvcfilv02\pubwks$\WP\PROJECTS\PARKS\GrapeBowl\2020 Grape Bowl Handrail Improvement Project\CAward doc 3/4/2021 Above/(Below) Bidder Location Bid Alt. 1 Bid Alt. 2 Engineer's Estimate Engineer's Estimate $ 60,000.00 $ 95,000.00 Soracco, Inc. Lodi $ 49,700.00 $ 63,630.00 ($10,300.00)/($31,370.00) Diede Construction, Inc. Woodbridge $ 58,000.00 $151,000.00 ($ 2,000.00)/ $56,000.00 *Superior Industry Builders Merced $ 61,250.00 $ 76,490.00 $ 1,250.00 /($18,510.00) "Contractor did not provide bid guarantee. Two alternate designs were prepared, both of which contractors were required to provide a bid. The bid documents identified the "low bidder" based on Bid Alternate 1. The two bid alternates were established to evaluate costs between a more economical design (Alternate 1) and a more structurally robust design (Alternate 2). Staff recommends awarding the Contract for Bid Alternate 2, which will result in less maintenance and a longer useful life. Staff recommends awarding Contract for Grape Bowl Handrail Improvement Project to Soracco, Inc., of Lodi, in the amount of $63,630, and authorizing City Manager to execute change orders in an amount not to exceed $10,000. APPROVED: Steve SchWabaUer Stephen Schwabauer, City Manager \\cvcfilv02\pubwks$\WP\PROJECTS\PARKS\GrapeBowl\2020 Grape Bowl Handrail Improvement Project\CAward doc 3/4/2021 Adopt Resolution Awarding Contract for 2020 Grape Bowl Handrail Improvement Project to Soracco, Inc., of Lodi ($63,630), and Authorizing City Manager to Execute Change Orders ($10,000) March 17, 2021 Page 2 FISCAL IMPACT: There will be a slight increase in the long-term maintenance costs associated with these improvements, while reducing the City's legal exposure. FUNDING AVAILABLE: Fiscal Year 2020/21 Budget: Parks Capital (PKCP-21002) - $80,000 Andrew Keys Andrew Keys Deputy City Manager/Internal Services Director C �2 2,2 Charles E. Swimley, Jr. Public Works Director Prepared by Alice Bernardino, Assistant Engineer CES/AB/tc Attachments cc: Utility Superintendent Signature: 00Jn&,r Xvip Email: akeys@lodi.gov 1k vdilv02\pubwks$\WP\PROJECTS\PARKSXGrapeBowl\2020 Grape Bowl Handrail Improvement Project\CAward.doc 3/4/2021 Legend Exhibit A Grape Bowl Handrail Location 35 70 140 Handrail Locations MEMEL Feet GRAPE BOWL HANDRAIL IMPROVEMENT PROJECT 221 E LAWRENCE AVE CONTRACT CITY OF LODI, CALIFORNIA THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," and SORACCO, INC., a California corporation, herein referred to as the "Contractor." WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders Certifications and Forms General Provisions Federal Requirements Special Provisions Bid Proposal Contract Contract Bonds Federal Minimum Wage Rates Plans Addenda The July 1992 Edition, Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; administrators, successors covenants herein contained and the said parties for themselves, their heirs, executors, and assigns, do hereby agree to the full performance of the CONTRACT 4.1 02/22/21 ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: The work consists of improvements to the existing Grape Bowl Facility bleachers. The project includes fabricating a support to stabilize the 138 steps , installing mid -aisle railings and other incidental and related work, all as shown on the plans and specifications for the above project. Two alternate designs are provided, both of which the contractor is required to provide a bid for. The City will determine the apparent low bidder based on the lowest of any bid alternate. Bidder may propose a different design as an equal under Bid Alternate 1 upon approval from the City. For additional bid item descriptions refer to Section 6-07 "Description of Bid Items". CONTRACT ITEMS Alternative 2 Item Description Qty Unit Unit Cost Total Ata Step Stabilization 1 LS $18,200.00 $18,200.00 A2b Fabricate and Install Handrail 1 LS $45,430.00 $45,430.00 TOTAL ALTERNATE 2: $63,630.00 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. CONTRACT 4.2 02/22/21 ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15 calendar days after the City Manager, or as agreed-upon by the City and the Contractor in writing has executed the contract and to diligently prosecute to completion within 21 CALENDAR DAYS. The calendar day count may pause or delay while equipment is being ordered. Additionally, the resurfacing and striping may be delayed should the weather necessitate. ARTICLE IX - State of California Senate Bill 854 requires the following. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. ARTICLE X - Counterparts and Electronic Signatures This Agreement and other documents to be delivered pursuant to this Agreement may be executed in one or more counterparts, each of which will be deemed to be an original copy and all of which, when taken together, will be deemed to constitute one and the same agreement or document, and will be effective when counterparts have been signed by each of the parties and delivered to the other parties. Each party agrees that the electronic signatures, whether digital or encrypted, of the parties included in this Agreement are intended to authenticate this writing and to have the same force and effect as manual signatures. Delivery of a copy of this Agreement or any other document contemplated hereby, bearing an original manual or electronic signature by facsimile transmission (including a facsimile delivered via the Internet), by electronic mail in "portable document format" (".pdf") or similar format intended to preserve the original graphic and pictorial appearance of a document, or through the use of electronic signature software will have the same effect as physical delivery of the paper document bearing an original signature. WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. CONTRACT 4.3 02/22/21 IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: CITY OF LODI, a municipal corporation M Title STEPHEN SCHWABAUER City Manager Date: Attest: JENNIFER CUSMIR City Clerk (CORPORATE SEAL) Approved As To Form: JANICE D. MAGDICH jdm City Attorney CONTRACT 4.4 02/22/21 RESOLUTION NO. 2021-64 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE CONTRACT FOR THE 2020 GRAPE BOWL HANDRAIL IMPROVEMENT PROJECT TO SORACCO, INC., OF LODI; AND FURTHER AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDERS WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on February 10, 2021, at 11:00 a.m., for the Grape Bowl Handrail Improvement Project, described in the plans and specifications therefore approved by the City Council on December 2, 2020; and WHEREAS, said bids have been checked and tabulated and a report thereof filed with the City Manager as follows: Above/(Below) Bidder Location Bid Alt. 1 Bid Alt. 2 Engineer's Estimate Soracco, Inc. Lodi $ 49,700 $ 63,630 ($10,300)/($31,370) Diede Construction, Inc. Woodbridge $ 58,000 $151,000 ($ 2,000)/ $56,000 *Superior Industry Builders Merced $ 61,250 $ 76,490 $ 1,250/($18,510) "Contractor did not provide bid guarantee. WHEREAS, two alternate designs were prepared, both of which contractors were required to provide a bid, and the bid documents identified the "low bidder" based on Bid Alternate 1; and WHEREAS, staff recommends awarding the contract for the Grape Bowl Handrail Improvement Project to Soracco, Inc., of Lodi, in the amount of $63,630; and WHEREAS, staff also recommends that the City Council authorize the City Manager to execute change orders in an amount not to exceed $10,000. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the contract for the Grape Bowl Handrail Improvement Project to Soracco, Inc., of Lodi, California, in the amount of $63,630; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute the contract and change orders in an amount not to exceed $10,000; and BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (adopted 11/6/19, Resolution No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above -referenced document(s) that do not alter the compensation or term, and to make clerical corrections as necessary. Dated: March 17, 2021 I hereby certify that Resolution No. 2021-64 was passed and adopted by the City Council of the City of Lodi in a regular meeting held March 17, 2021 by the following vote: AYES: COUNCIL MEMBERS — Chandler, Hothi, Khan, Kuehne, and Mayor Nakanishi NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None JENNER USMIR City CIFlerk 2021-64