Loading...
HomeMy WebLinkAboutAgenda Report - February 17, 2021 C-12AGENDA ITEM 042, " CITY OF LODI a COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt Resolution Authorizing Public Works Director to Execute Freeway Agreement with State of California for Proposed State Route 99/Turner Road Interchange Improvements MEETING DATE: February 21, 2021 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution authorizing Public Works Director to execute Freeway Agreement with State of California for proposed State Route 99/Turner Road Interchange Improvements. BACKGROUND INFORMATION: Since 2018, San Joaquin County of Governments, in partnership with California Department of Transportation (Caltrans), the City of Lodi, and the design consultant, Drake Haglan & Associates, Inc. have collaborated to prepare the necessary environmental clearance and design documents for constructing the State Route 99 (SR99)/Turner Road Interchange Improvements. The project improvements include the construction of a round -a -bout located near the southerly end of the southbound Turner Road freeway off -ramp, widening Cherokee Lane (currently a one-way southbound roadway segment) into a two-way facility between Pioneer Drive and Turner Road, including Class II bike lanes in both directions and sidewalk on the westerly side of the roadway. The project also includes lengthening the SR99/Turner Road Southbound on-ramp by 400 feet to provide longer acceleration distance to merge with mainline traffic. As a condition of project approval, Caltrans is requiring the City of Lodi to enter into a current Freeway Agreement with the State of California. The existing Freeway Agreement was executed in 1954 and, while very similar, it does contain outdated information. The proposed, current Freeway Agreement generally identifies the obligations of the State and City with respect to the closing, relocating, and maintaining City streets as affected by construction associated with the State highway. All obligations with respect to funding and construction of freeway project improvements would be agreed upon by separate Cooperative Agreement(s) between the City and the State. FISCAL IMPACT: Not applicable. FUNDING AVAILABLE: Not applicable- CES/CES/tc Attachment APPROVED: 0LW"__Q Charles E. Swimley, Jr. Public Works Director Wabau r, City Manager K:\WP\PROJECTS\STREETS\Tumer_SR99 interchange improvements\SR99_Tumer_2_1 _ reemenLdoc 2/3/2021 10 - SJ - 99 — P.M. 28.5/31.8 From Harney Lane to Mokelumne River FREEWAY AGREEMENT THIS AGREEMENT, made and entered into on this day of ,20_, by and between the STATE OF CALIFORNIA acting by and through the Department of Transportation (herein referred to as "STATE"), and the City of Lodi (herein referred to as "CITY"), WITNESSETH: WHEREAS, the highway described above has been declared to be a freeway by Resolution of the California Highway Commission on November 20, 1953; and WHEREAS, STATE and CITY have entered into a Freeway Agreement dated March 17, 1954, relating to that portion of State Highway Route 99 (old Route 4) from the southerly City Limits of Lodi to the northerly City Limits of Lodi (as existed in 1954); and WHEREAS, CITY has subsequently incorporated and included in its entirety such freeway covered by Freeway Agreement dated February 15, 1954 with the County of San Joaquin; and WHEREAS, a revised plan map for such freeway has been prepared showing the proposed plan of the STATE as it affects roads of the CITY; and WHEREAS, it is the mutual desire of the parties hereto to enter into a new Freeway Agreement in accordance with the revised plan of said freeway; NOW, THEREFORE, IT IS AGREED: 1. This Agreement supersedes in its entirety said Freeway Agreement, dated February 15, 1954, and said Freeway Agreement dated March 17, 1954. 2. CITY agrees and consents to the closing of CITY streets, relocation of CITY streets, construction of frontage roads and other local roads, and other construction affecting CITY streets, all as shown on the plan map attached hereto, marked Exhibit A, and made a part hereof by reference. 3. The obligations of STATE and CITY with respect to the funding and construction of the freeway project will always be dealt with in separate Cooperative Agreement(s) between the parties, and any amendments thereto, or Encroachment Permits issued to CITY. The parties responsible for the construction of the freeway shall make any changes affecting CITY roads only in accordance with the plan map attached hereto, marked Exhibit A. 4. The obligations of STATE and CITY with respect to the acquisition of the rights of way required for the construction, reconstruction, or alteration of the freeway and 10 - SJ - 99 — P.M. 28.5/31.8 From Harney Lane to Mokelumne River CITY streets, frontage roads, and other local roads will always be dealt with in separate Cooperative Agreement(s) between the parties, and any amendments thereto or Encroachment Permits issued to CITY. 5. It is understood between the parties that the rights of way may be acquired in sections or units, and that both as to the acquisition of right of way and the construction of the freeway project, the obligations of STATE and CITY hereunder shall be carried out at such time and for such unit or units of the project as funds are budgeted and made lawfully available for such expenditures. 6. CITY will accept control and maintenance over each of the relocated or reconstructed CITY streets, any frontage roads, and other local roads constructed as part of the project, on receipt of written confirmation that the work thereon has been completed, except for any portion which is adopted by STATE as a part of the freeway proper. If acquired by STATE, CITY will accept title to the portions of such roads lying outside the freeway limits upon relinquishment by STATE. 7. This Agreement may be modified at any time by the mutual consent of the parties hereto, as needed to best accomplish, through STATE and CITY cooperation, the completion of the whole freeway project for the benefit of the people of the STATE and of the CITY. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by their respective duly authorized officers. STATE OF CALIFORNIA Department of Transportation TOKS OMISHAKIN Director of Transportation By DENNIS T. AGAR District 10 Director APPROVED AS TO FORM: Attorney (State) Signature: 2&T e 0 &zz&h IA I!,C0 D t.'ifil Ir11 .17 J� l ] J A PST, Email: jmagdich@lodi.gov THE CITY OF LODI By CHARLES E. SWIMLEY, JR. Director of Public Works APPROVED AS TO FORM: jdm 'L.i' �-A IN-04x1(i RESOLUTION NO. 2021-40 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE PUBLIC WORKS DIRECTOR TO EXECUTE A FREEWAY AGREEMENT WITH THE STATE OF CALIFORNIA FOR THE PROPOSED STATE ROUTE 99/TURNER ROAD INTERCHANGEIMPROVEMENTS WHEREAS, since 2018, San Joaquin Council of Governments, in partnership with California Department of Transportation (Caltrans), the City of Lodi, and the design consultant, Drake Haglan & Associates, Inc., have collaborated to prepare the necessary environmental clearance and design documents for constructing the State Route 99 (SR99)/Turner Road Interchange Improvements; and WHEREAS, the project improvements include the construction of a round -about located near the southerly end of the southbound Turner Road freeway off -ramp and widening Cherokee Lane (currently a one-way southbound roadway segment) into a two-way facility between Pioneer Drive and Turner Road, including Class II bike lanes in both directions and sidewalk on the westerly side of the roadway. The project also includes lengthening the SR99/Turner Road southbound onramp by 400 feet to provide a longer acceleration distance to merge with mainline traffic; and WHEREAS, as a condition of project approval, Caltrans is requiring the City of Lodi to enter into a current Freeway Agreement with the State of California; and WHEREAS, staff recommends authorizing the Public Works Director to execute a Freeway Agreement with the State of California for the proposed State Route 99/Turner Road Interchange Improvements. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize the Public Works Director to execute a Freeway Agreement with the State of California for the proposed State Route 99/Turner Road Interchange Improvements; and BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (Res. No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above -referenced document(s) that do not alter the compensation or term, and to make clerical corrections as necessary. Dated: February 17, 2021 I hereby certify that Resolution No. 2021-40 was passed and adopted by the City Council of the City of Lodi in a regular meeting held February 17, 2021, by the following vote: AYES: COUNCIL MEMBERS — Chandler, Hothi, Khan, Kuehne, and Mayor Nakanishi NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None JENNIFER CUSMIR City Clerk 2021-40