HomeMy WebLinkAboutAgenda Report - February 17, 2021 C-06AGENDA ITEM coo
'• CITY OF LODI
COUNCIL COMMUNICATION
TM
AGENDA TITLE: Accept Improvements Under Contract for Stormwater Trash Collection Project -
Phase 1 (2020)
MEETING DATE: February 17, 2021
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Accept improvements under contract for Stormwater Trash
Collection Project - Phase 1 (2020).
BACKGROUND INFORMATION: This project includes installing a trash capture device in the storm
drain line in Turner Road. The device will filter trash as small as a
cigarette butt being carried in the storm drain system before it is
discharged into Mokelumne River. This is the first of several similar installations needed to comply with a
State mandate requiring the collection of all trash in storm drain systems that discharge into rivers or
streams.
The contract was awarded to Soracco, Inc., of Lodi, in the amount of $223,870, on August 5, 2020. All
work was completed in substantial conformance with the plans and specifications approved by City
Council. The final contract price was $223,870 and the project was completed prior to the contract
completion date. Photos showing the unit being installed are shown in Exhibit A.
Following acceptance by the City Council, as required by law, the City Engineer will file a Notice of
Completion with the County Recorder's office. The notice serves to notify vendors and subcontractors
that the project is complete and begins their 30 -day period to file a stop notice requiring the City to
withhold payments from the prime contractor in the event of a payment dispute.
FISCAL IMPACT: This project will slightly increase annual storm drainage maintenance costs
for the trash capture device.
FUNDING AVAILABLE: This project was funded by Wastewater Capital fund.
Charles E. Swimley, Jr.
Public Works Director
Prepared by Alice Bernardino, Assistant Engineer
CES/AB/tc
Attachment
APPROVED.
3fephen 5skWb ter, City Manager
K:\WP\PROJECTS\STORMDRN\Storrnwater Trash Collection Project - Phase 1 (2020]1C ecepl.doc
2/1/2021
Exhibit A
Stormwater Trash Collection Project — Phase 1 (2020)