HomeMy WebLinkAboutAgenda Report - January 6, 2021 C-07AGENDA ITEM Co,7 �Q CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt Resolution Awarding Contract for Central Plume PCEITCE Groundwater and Soil Vapor Extraction System Decommissioning and Removal to A.M. Stephens Construction Co., Inc., of Lodi ($601,714) MEETING DATE: January 6, 2021 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution awarding contract for Central Plume PCE/TCE Groundwater and Soil Vapor Extraction System Decommissioning and Removal to A.M. Stephens Construction Co., Inc., of Lodi, in the amount of $601,714. BACKGROUND INFORMATION: Council approved the specifications and authorized advertisement for bids on August 19, 2020. This project consists of decommissioning the Soil Vapor Extraction and the groundwater extraction and treatment systems located near the alleyway that lies between Pine and Oak Streets, and Pleasant Avenue and Church Street, as shown on Exhibit A. The City received two bids on September 30, 2020. The first bid was withdrawn by the contractor because of serious math errors, The second bid came in significantly higher than the engineer's estimate, which was prepared by the consultant engineer, Civil Hydro Tech. The consultant engineer reviewed the bid prices and determined that clarifying the well destruction methods and type of waste inside the carbon vessels would attract a larger pool of bidders and more competitive pricing. On October 21, 2020, Council rejected all bids, approved specifications and reauthorized advertisement for bids for this project. To make up time associated with the rebidding process, this Council action also authorized the City Manager to award to the lowest responsive bidder in an amount not to exceed $600,000. The City received the following three bids for this project on December 2, 2020: Bidder Location Engineer's Estimate A.M. Stephens Const. Co., Inc. Lodi Pacific States Enviro. Const. Dublin Diede Construction Woodbridge The lowest responsive bid, provided by A.M. Stephens Construction Co., Inc., of Lodi, was $601,713.90, which was $1,713.90 over the authorized amount, therefore requiring Council approval to award. Previous Council authorization of change orders in an amount not to exceed $80,000 and appropriation of funds in the amount of $295,000 will still be valid per Resolution No. 2020-231. APPROVED: Andrew Keys for Stephen Schwabauer, City Manager \\cvdilv02\pubwks$\WP\PROJECTS\WATER\PCE,TCE\Central\Exlredion System Demo\CAward.doc 1 212 212 02 0 Above/(Below) Bid Engineer's Estimate $550,000.00 $601,713.90 $ 51,713.90 $652,108.20 $102,108.20 $832,090.00 $282,090.00 The lowest responsive bid, provided by A.M. Stephens Construction Co., Inc., of Lodi, was $601,713.90, which was $1,713.90 over the authorized amount, therefore requiring Council approval to award. Previous Council authorization of change orders in an amount not to exceed $80,000 and appropriation of funds in the amount of $295,000 will still be valid per Resolution No. 2020-231. APPROVED: Andrew Keys for Stephen Schwabauer, City Manager \\cvdilv02\pubwks$\WP\PROJECTS\WATER\PCE,TCE\Central\Exlredion System Demo\CAward.doc 1 212 212 02 0 Adopt Resolution Awarding Contract for Central Plume PCE/TCE Groundwater and Soil Vapor Extraction System Decommissioning and Removal to A.M. Stephens Construction Co., Inc., of Lodi ($601,714) January 6, 2021 Page 2 Staff recommends awarding contract for Central Plume PCE/TCE Groundwater and Soil Vapor Extraction System Decommissioning and Removal to A.M. Stephens Construction Co., Inc., of Lodi, in the amount of $601,714. FISCAL IMPACT: Annual operation and maintenance costs will decrease as a result of system removal. This project will not impact the General Fund. FUNDING AVAILABLE: Fiscal Year 2020/21 Budget: Central Plume Settlement Funds (59099000.77020): $385,000 Previous Appropriation (Resolution No. 2020-231): Central Plume Settlement Funds (59099000.77020): 1295,000 TOTAL. $680,000 Andrew Keys Andrew Keys Deputy City Manager/Internal Services Director "-22 Charles E. Swimley, Jr. Public Works Director Prepared by Sean Nathan, Senior Civil Engineer CES/SN/tc Attachments 1\cvdilv02\putwvks$\WP\PROJECTS\WATER\PCE,TCE\Central\Extraction System Demo\CAward.doc 12/22/2020 G CITY OF • . o PUBLIC WORKS DEPARTMENT I I I I I I I I I I I II I+ II II II II I+ I+ II II II II II II II II it II II III III II. I' I' IIII I 111 I II I I III II III �E EXHIBIT A SVE AND GWE SYSTEM DECOMISSI0NING AND REMOVAL VMw-01 7 I�J4�1 II SV 113 j ®VMW-02 II If I I YYm'' I f ISM wat-�+ IIIIII L I I SV-� ROPOSED —IEX ION I 9V -p8 I I II I Lu I \ I 111 II III Q W � TREATMENT SYS� EM� a\•e\v.�\,\.y\w... y u - 1 I II II SV -oaf i 141 W w L_ [lt\\rhRv4 6� II j II /y II I IWI 1 I ,y sv-m I \ gvusm v II III III L W — --------------- ---------- EW-04 ___— EW -01 s tom-, OAK STREET ----------- �IvMW li- -- - -- ,' el II II u Central Plume — Decommissioning of SVE I GWET Systems and Well Abandonments (REBID) CITY OF LODI, CALIFORNIA SECTION 4 CONTRACT THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," and A.M. STEPHENS CONSTRUCTION CO., INC., a California corporation, herein referred to as the "Contractor." WITNESSETH That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids The 2008 Edition, Information to Bidders Standard Specifications, General Provisions State of California, Special Provisions Business and Transportation Agency, Bid Proposal Department of Transportation Contract Contract Bonds Plans All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE 11 - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full CONTRACT 4.1 12/7/2020 compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit; Perform the work necessary to decommission and remove the Central Plume Source Area (CPSA) Soil Vapor Extraction (SVE) and Groundwater Extraction and Treatment (GWET) systems including removal and disposal of treatment systems, concrete pad, and above ground conveyance piping within the treatment system enclosure, abandon the SVE, vapor monitoring, and groundwater extraction wells, remove underground conveyance piping within property boundaries, preform in-place closure of conveyance piping and the discharge drain line in the City right of way, remove and dispose of all well vaults and all associated piping and valves, perform excavation of the area near the intersection of alleyway and Pleasant Avenue, perform Site restoration including street repair, landscaping, and other incidental and related work, all as shown on the plans and specifications for "Central Plume Source Area — Decommissioning of the Soil Vapor Extraction (SVE) and Groundwater Extraction & Treatment (GWET) Systems". CONTRACT ITEMS ITEM EST'D. NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE 1. Mobilization / Demobilization LS 1 $54,965.00 $54,965.00 2. Traffic Control LS 1 $3,940.00 $3,940.00 3 Removal of all Well Vaults LS ? $38,648.00 $38,648.00 4 Abandonment of SVE, GWE, and VM wells LS 1 $225,313.00 $225,313.00 5 Removal of underground Conveyance Piping and LS I $99,288.00 $99,288.00 Backfill 6. In-place abandonment of Conveyance Piping LS 1 $1,835.00 $1,835.00 7 Decommissioning of the SVE & GWET Systems LS 1 $111,831.00 $111,831.00 8. Excavation of area at intersection of alleyway and CY 115 $232.00 $26,680.00 Pleasant Avenue and Backfill CONTRACT 4,2 12/712020 ITEM EST'D. NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE 9. Repair / Replace 18' Wide Concrete Alley Approach Refer LS 1 $7,697.00 $7,697.00 City Standard Plan 115 10 Asphalt Pavement Repair / Replace SF 2415 $12.86 $31,056.90 11. Dispose Hazardous Waste — TON 1 $146.00 $146.00 Class I Non-RCRA 12. Dispose Hazardous Waste — TON 1 $290.00 $290.00 Class I RCRA 13. Dispose Designated Waste TON 1 $24.00 $24.00 TOTAL BID $601,713.90 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. ARTICLE Vlll - The Contractor agrees to commence work pursuant to this contract within 15 calendar days after the City Manager has executed the contract and to diligently prosecute to completion within 60 CALENDAR DAYS, ARTICLE Ik- State of California Senate Bill 854 requires the following: • No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. • No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with they Department of Industrial Relations pursuant to Labor Code section 1725.5. • This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. CONTRACT 4.3 12!712020 WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: CITY OF LODI, a municipal corporation By. STEPHEN SCHWABAUER City Manager By Date: Attest Title JENNIFER CUSMIR City Clerk (CORPORATE SEAL) Approved As To Form JANICE D. MAGDICH City Attorney jdm CONTRACT 4.4 12/7iZ020 RESOLUTION NO. 2021-04 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE CONTRACT FOR THE CENTRAL PLUME PCE/TCE GROUNDWATER AND SOIL VAPOR EXTRACTION SYSTEM DECOMMISSIONING AND REMOVAL PROJECT TO A.M. STEPHENS CONSTRUCTION CO., INC., OF LODI WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on December 2, 2020, at 11:00 a.m., for Central Plume PCE/TCE Groundwater and Soil Vapor Extraction System Decommissioning and Removal, as described in the plans and specifications therefore approved by the City Council on October 21 2020; and WHEREAS, said bids have been checked and tabulated and a report thereof filed with the City Manager as follows: Above/(Below) Bidder Location Bid Engineer's Estimate A.M. Stephens Const. Co., Inc. Lodi $601,713.90 $ 51,713.90 Pacific States Enviro. Const. Dublin $652,108.20 $102,108.20 Diede Construction Woodbridge $832,090.00 $282,090.00 WHEREAS, staff recommends awarding the contract for the Central Plume PCE/TCE Groundwater and Soil Vapor Extraction System Decommissioning and Removal Project to A.M. Stephens Construction Co., Inc., of Lodi, in the amount of $601,714. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the contract for the Central Plume PCE/TCE Groundwater and Soil Vapor Extraction System Decommissioning and Removal Project to the low bidder, A.M. Stephens Construction Co., Inc., of Lodi, California, in the amount of $601,714; and BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (adopted 11/6/19, Resolution No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above -referenced document(s) that do not alter the compensation or term, and to make clerical corrections as necessary. Dated: January 6, 2021 ------------------------------------------------------------------------ ------------------------------------------------------------------------ I hereby certify that Resolution No. 2021-04 was passed and adopted by the City Council of the City of Lodi in a regular meeting held January 6, 2021 by the following vote: AYES: COUNCIL MEMBERS — Chandler, Kuehne, Khan, Hothi, and Mayor Nakanishi NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None NIFE USMIR City Clerk 2021-04