Loading...
HomeMy WebLinkAboutAgenda Report - January 6, 2021 C-03AGENDA ITEM C)0,3 CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for Hutchins Street Square, Crete Hall Flooring Replacement MEETING DATE: January 6, 2021 PREPARED BY: Public Works Director RECOMMENDED ACTION: Approve plans and specifications and authorize advertisement for bids for Hutchins Street Square, Crete Hall Flooring Replacement. BACKGROUND INFORMATION: In 1998, the City completed a major remodel of the conference and performing arts center at Hutchins Street Square. The project remodeled a multipurpose building that includes Camp Hutchins, administration offices, conference rooms, a kitchen, restrooms, and a multipurpose hall, now known as Crete Hall. These building had been a part of the Lodi Union High School (LUHS) prior to the City owning the facility. Crete Hall, which was originally the Lodi Union High School cafeteria, is approximately 3,800 square feet and has a combination of carpet (1998) and linoleum (1964). With years of regular use the flooring is in need of replacement. The Hutchins Street Square Foundation (HSSF) has committed approximately $26,000 for this project. The donation will be presented and accepted when the project returns to Council for contract award. Photos of the existing flooring are shown on Exhibit A. This project will remove the carpet and install approximately 3,920 square feet of heavy commercial vinyl planks in Crete Hall as well as an adjacent storage room. The flooring type was elected by the HSSF and is similar to flooring installed in the Holtz Room approximately four years ago. This project will also remove and replace the base molding around the perimeter flooring. The specifications are on file in the Public Works Department. The planned bid opening date is January 27, 2021. The project estimate is $30,000. FISCAL IMPACT: Upgrading the flooring to a more resilient and visually -pleasing material will increase rentals and Parks, Recreation, and Cultural Services revenue while minimizing cleaning costs. FUNDING AVAILABLE: Funding will be identified at the time of project award. (IQL�� Charles E. Swimley, Jr. Public Works Director Prepared by Sean Nathan, Senior Civil Engineer CES/SN/tc Attachment APPROVED: Andrew Keys for Stephen Schwabauer, City Manager KAWPIPROJECTSIMISCWSS Floor ReplacemenikCrete HallkCSA HSS-CreteFlooring.doc 12/22/2020 Exhibit A