HomeMy WebLinkAboutAgenda Report - December 2, 2020 C-10AGENDA ITEM can 10 &% CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Accept Improvements Under Contract for 2020 Pavement Maintenance Project and Adopt Resolution Appropriating Funds ($16,350) MEETING DATE: December 2, 2020 PREPARED BY: Public Works Director RECOMMENDED ACTION: Accept improvements under contract for 2020 Pavement Maintenance Project and adopt resolution appropriating funds in the amount of $16,350. BACKGROUND INFORMATION: This project addressed areas with pavement failures along major roadways (primarily Lower Sacramento Road) that were causing significant complaints related to ride ability. This project removed and replaced the top layer of pavement on the heavily damaged portions of the roadway and restriped these areas that were repaired as needed. The contract was awarded to DSS Company dba Knife River Construction, of Stockton, in the amount of $185,450, on June 3, 2020. Due to the favorable bids received, Staff requested Council authorize the City Manager to execute change orders in an amount not to exceed $100,000, for a total not to exceed contract price of $285,450. Staff utilized the change order authority to authorize much-needed pavement repairs outside of the original scope of work at Turner Road (immediately west of Lower Sacramento Road/Woodhaven Lane) and Sacramento Street (immediately south of Pine Street). Staff also increased the contracted pavement repair area in Lower Sacramento Road by 21,533 square feet, to address additional needed repairs. The City requested, additional repair costs were included in Change Order No. 1, which increased the total contract by $97,085, for a total (final) contract amount of $282,535. The work performed on Lower Sacramento Road is in preparation for a complete resurfacing of that roadway between Kettleman Lane and Turner Road currently programmed for construction in Fiscal Year 2022/23. All work was completed in substantial conformance with the specifications approved by City Council and prior to the contract completion date. Photos of the completed work are shown in Exhibit A. Following acceptance by the City Council, as required by law, the City Engineer will file a Notice of Completion with the County Recorder's office. The notice serves to notify vendors and subcontractors that the project is complete and begins their 30 -day period to file a stop notice requiring the City to withhold payments from the prime contractor in the event of a payment dispute. FISCAL IMPACT: Repairing these areas now will prevent them from getting worse and potentially causing vehicle damage. APPROVED: ephen S_cWwabeiler, City Manager KAWP\PR0JECTS\STREETS\2020 Pavement Maintenance ProjeWCAmepi.dec 11/17/2020 Accept Improvements Under Contract for 2020 Pavement Maintenance Project and Adopt Resolution Appropriating Funds ($16,350) December 2, 2020 Page 2 FUNDING AVAILABLE: This project was funded by Senate Bill 1, Gas Tax. The additional appropriation is needed to cover a small amount of staff time that was not accounted for during the budget process. Requested Additional Appropriation: Senate Bill 1 Gas Tax (30499000.77020) LiUK0 TOTAL: Andrew Keys Andrew Keys Deputy City Manager/Internal Services Director /1,11 �—A--np Charles E. Swimley, Jr. Public Works Director Prepared by Sean Nathan, Senior Civil Engineer CES/SN/tc Attachments $ 16,354 KAWP\PR0JECTS\STREETS\2020 Pavement Maintenance Project\CAccept-doc 11/17/2020 Exhibit A Photos Sacramento Street (South of Pine) Turner Road (West of Lower Sacramento / Woodhaven) ,:. T k� L r T k� .�'qS - ■ Capital Improvement Program - Maintenance Maintenance Project Title: 2020 Citywide Pavement Repair I Munis Project Code: PWST-20002 #33 Section I Description Project Length 07/20 to 06/21 Priority Normal Perform pavement repairs at various locations throughout the City. Justification/factor driving project Performing pavement repairs will prevent further deterioration before pavement resurfacing projects can be done and will also prevent pot holes from forming. Additional Information Funded by SB 1 money and needs to get Council approval prior to May 1, 2019. Section II Estimated Project Costs Expenditure Prior Years FY 19120 FY 20121 FY 21122 FY 22123 FY 23124 FY 24125 Future Yrs Total Estimate Budget Contracts $ - $ 265,450 $ 85,000 $ 350,450 Internal Staff $ - $ 20,000 $ 16,350 $ 15,000 $ 51,350 Total Capital Costs $ - $ 285,450 $ 16,350 $ 100,000 $ - $ - $ - $ - $ 401,800 Section III 0 0Funding Sources/Methods of Financing Funding Source(s) Prior Years FY 19120 FY 20121 FY 21122 FY 22123 FY 23124 FY 24125 Future Yrs Total Budget 304 - Gas Tax 2031 $ - $ 285,450 $ 16,350 $ 301,800 305 - TDA - Streets $ - $ 100,000 $ 100,000 Total Project Financing $ .-+$-285,450 $ 16,350 $ 100,000 $ - $ - $ - $ - $ 401,800 Section IV Operating Budget Impact Operating Cost or Prior Years FY 19120 FY 20121 FY 21122 FY 22123 FY 23124 FY 24125 Future Yrs Total (savings) Budget Personnel $ - $ - Other Operating Costs $ - - Total Operating Impact $ - - - $ - - - - $ - - RESOLUTION NO. 2020-283 A RESOLUTION OF THE LODI CITY COUNCIL APPROPRIATING FUNDS FOR THE 2020 PAVEMENT MAINTENANCE PROJECT WHEREAS, this project addressed areas with pavement failures along major roadways (primarily Lower Sacramento Road) that were causing significant complaints related to ride ability and removed and replaced the top layer of pavement on the heavily damaged portions of the roadway and restriped these areas that were repaired as needed; and WHEREAS, the contract was awarded to DSS Company, dba Knife River Construction, of Stockton, in the amount of $185,450, on June 3, 2020, and Council authorized the City Manager to execute change orders in an amount not to exceed $100,000, for a total not -to - exceed contract price of $285,450; and WHEREAS, additional appropriation is needed to cover a small amount of staff time that was not accounted for during the budget process; and WHEREAS, staff recommends that the City Council appropriate funds in the amount of $16,350, from the fund balance of Senate Bill 1 Gas Tax (30499000.77020) for Fiscal Year 2020/21. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize an appropriation for the 2020 Pavement Maintenance Project, in the amount of $16,350, as set forth above; and BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (adopted 11/6/19, Resolution No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above -referenced document(s) that do not alter the compensation or term, and to make clerical corrections as necessary. Dated: December 2, 2020 I hereby certify that Resolution No. 2020-283 was passed and adopted by the City Council of the City of Lodi in a regular meeting held December 2, 2020 by the following vote: AYES: COUNCIL MEMBERS — Chandler, Nakanishi, and Mayor Kuehne NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Mounce ABSTAIN: COUNCIL MEMBERS — None C.G JENNIFE USMIR City Clerk 2020-283