Loading...
HomeMy WebLinkAboutAgenda Report - November 18, 2020 C-04AGENDA ITEM C,,.4 At,% CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Approve Specifications and Authorize Advertisement for Bids for 2020 Extruded Traffic Stripes MEETING DATE: November 18, 2020 PREPARED BY: Public Works Director RECOMMENDED ACTION: Approve specifications and authorize advertisement for bids for 2020 Extruded Traffic Stripes. BACKGROUND INFORMATION: Since 2009, the City has been using extruded thermoplastic traffic stripes rather than sprayed thermoplastic. The extruded thermoplastic material has proven to be the superior product. Although extruded thermoplastic costs approximately 15 percent more than sprayed thermoplastic, it is expected to last 67 percent longer (five years verses three years). The streets included in this bi-annual project include various streets, as shown on Exhibit A. A summary of the total traffic striping and legend applications per street is shown in the table below: Street Limits Total ft Legends sf Mills Ave Lodi Ave - Elm St 5275 455.2 Mills Ave Kettleman Ln - 465'S/ Kettleman 600 Elm St Lower Sac Rd - Mills Ave 10655 734 Yosemite Dr Mills Ave - Rutledge Dr 1395 44 Vine St Lower Sac Rd - Ham Ln 8385 1131 Oxford Wy Lower Sac Rd - Allan Dr 1350 291.5 Reynolds Ranch Pkwy NB Rock Ln - Harney Ln 1520 40 Reynolds Ranch Pkwy NB Lebaron Blvd - 65'S/ Lebaron Blvd 65 0 Turner Rd Hwy 99 - Guild Ave 11490 661.5 Beckman Rd Lockeford St - Turner Rd 3035 135 Cluff Ave Victor Rd - Turner Rd 2385 61 Beckman Rd Lodi Ave- Kettleman Ln 17720 530.7 Business Park Dr Kettleman Ln - Beckman Rd 1035 76.5 Kettleman Ln Hwy 99 - City Limits 10155 379.2 Stockton St Kettleman Ln - 130'N/ Kettleman Ln 540 15 TOTAL ft 75605 4554.60 TOTAL mi 14.32 APPROVED: , City Manager K:\WP\PROJECTS\STREETS\2020 Extruded Traffic Stripes\CSA.doc 11/3/2020 Approve Specifications and Authorize Advertisement for Bids for 2020 Extruded Traffic Stripes November 18, 2020 Page 2 The specifications are on file in the Public Works Department. The planned bid opening date is December 16, 2020. The project estimate is $80,000. FISCAL IMPACT: This project will extend the useful life of the lane lines, which will reduce overall maintenance costs. FUNDING AVAILABLE: Funding will be identified at project award. C "-W Charles E. Swimley, Jr Public Works Director Prepared by Alice Bernardino, Assistant Engineer CES/AB/tc Attachment cc: Utility Superintendent K:\WP\PROJECTS\STREETS\2020 Extruded Traffic Stripes\CSA doc 11/3/2020 Exhibit A 2020 Extruded Traffic Striping Project Legend Project Location 0 0.15 0.3 0.6 Miles