Loading...
HomeMy WebLinkAboutResolutions - No. 2020-231RESOLUTION NO. 2020-231 A RESOLUTION OF THE LODI CITY COUNCIL REJECTING ALL BIDS; APPROVING SPECIFICATIONS; AUTHORIZING RE -ADVERTISEMENT FOR BIDS; AUTHORIZING THE CITY MANAGER TO AWARD A CONTRACT TO THE LOWEST RESPONSIVE BIDDER FOR CENTRAL PLUME PCE/TCE GROUNDWATER AND SOIL VAPOR EXTRACTION SYSTEM DECOMMISSIONING AND REMOVAL; AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDERS; AND FURTHER APPROPRIATING FUNDS WHEREAS, Council approved the specifications and authorized advertisement for bids for Central Plume PCE/TCE Groundwater and Soil Vapor Extraction System Decommissioning and Removal on August 19, 2020; and WHEREAS, the City received the following two bids on September 30, 2020: Bidder Engineers Estimate Stratus Construction Company Pacific States Environmental *Bid was withdrawn Above/(Below) Location Bid Engineer's Estimate $300,000.00 Stockton $418,368.00* $118,368.00 Dublin $658,701.25 $358,701.25 WHEREAS, the bid from Stratus Construction Company was withdrawn by the contractor because of serious math errors; and WHEREAS, the consultant engineer reviewed the bid prices and determined that clarifying the well destruction methods and type of waste inside the carbon vessels would attract a larger pool of bidders and more competitive pricing; and WHEREAS, staff recommends rejecting all bids, approving specifications, authorizing re -advertisement for bids, authorizing the City Manager to award a contract to the lowest responsive bidder for Central Plume PCE/TCE Groundwater and Soil Vapor Extraction System Decommissioning and Removal, in an amount not to exceed $600,000; and WHEREAS staff also recommends authorizing the City Manager to execute change orders in an amount not to exceed $80,000; and WHEREAS, staff also recommends that the City Council appropriate funds in the amount of $295,000 from the fund balance of Central Plume Settlement Fund (59099000.77020) for Fiscal Year 2020/21. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby reject all bids for Central Plume PCE/TCE Groundwater and Soil Vapor Extraction System Decommissioning and Removal; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby approve the specifications and authorize re -advertisement for bids for Central Plume PCE/TCE Groundwater and Soil Vapor Extraction System Decommissioning and Removal; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize the City Manager to award a contract to the lowest responsive bidder for Central Plume PCE/TCE Groundwater and Soil Vapor Extraction System Decommissioning and Removal, in an amount not to exceed $600,000; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute change orders in an amount not to exceed $80,000; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize an appropriation for the project, in the amount of $295,000, as set forth above; and BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (adopted 11/6/19, Resolution No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above -referenced document(s) that do not alter the compensation or term, and to make clerical corrections as necessary. Dated: October 21, 2020 ------------------------------------------------------------------------ ------------------------------------------------------------------------ I hereby certify that Resolution No. 2020-231 was passed and adopted by the City Council of the City of Lodi in a regular meeting held October 21, 2020 by the following vote: AYES: COUNCIL MEMBERS — Chandler, Mounce, Nakanishi, and Mayor Kuehne NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None i JENNIFE 'CUSMIR City Clerk 2020-231