HomeMy WebLinkAboutResolutions - No. 2020-152RESOLUTION NO. 2020-152
A RESOLUTION OF THE LODI CITY COUNCIL
APPROVING VARIOUS PUBLIC WORKS FEES
WHEREAS, in the past five years, the State of California has implemented
various legislation and Senate Bills for storm water quality control and water
conservation efforts, including Post Construction Storm Water Standards (PCSWS) and
Model Water Efficient Landscape Ordinance (MWELO); and
WHEREAS, these new requirements have tremendously increased the amount
of staff time in the project review and approval process; and
WHEREAS, the new fees are shown on Exhibit A; and
WHEREAS, all the new fees listed in the Public Works Fee Schedule will be
increased every July 1 by the amount of the 12 -month change in the Consumer Price
Index, Western Urban unadjusted; and
WHEREAS, staff recommends approving various Public Works fees.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby
approve various Public Works fees on shown on Exhibit A attached hereto and made a
part of this Resolution.
Dated: July 15, 2020
I hereby certify that Resolution No. 2020-152 was passed and adopted by the
City Council of the City of Lodi in a regular meeting held July 15, 2020 by the following
vote:
AYES: COUNCIL MEMBERS — Chandler, Mounce, Nakanishi, and
Mayor Kuehne
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
PAMELA M. FARRIS
Assistant City Clerk
2020-152
EXHIBIT A
Engineering Fees Changes FY 2020/2021
Engineering Fees
Fees
Inspection on overtime callout (per hour, minimum 3 hours)
$157.00
Inspection for Storm Drainage Permit Compliance
Initial Monthly Construction Inspection
$220.00
Subsequent Monthly Construction Inspection
$175.00
Post -Construction BMP Annual Inspection
$175.00
SWPPP Plan Check
$500
Master Utility Plan Check (up to 2 checks, 3rd check and beyond based on
time & materials)
$2,000
Improvement Agreement
$2,572
Improvement Agreement Addenda
$856
Will Serve Letter
$100
Partial Project Acceptance
$10,000
Deferred Improvement Agreement
$2,313.00
Development Inquiries
$550
Annexation
$886.00
Building Permit-Commercial/Industrial/Multi-Family
$1,187.00
Building Permit -Single -Family Residential
$593.00
Post Construction Storm Water Plan (Small Project)
$100
Post Construction Storm Water Plan (Regulated Project)
$200
Post Construction Storm Water Plan (Hydromodification Project)
$600
MWELO Compliance Plan Check (Residential)
$100
MWELO Compliance Plan Check (Subdivision, per lot)
$50
MWELO Compliance Plan Check (Non Residential)
$300
SB 5 200 -YR Flood Plain Certification Fee (New Construction, per lot)
$200
Final Map Processing
$2,200
per lot
$20
Parcel Map Check/Processing
$3,000
per lot
$20
Tentative Parcel Map and Non -Residential Condominium Conversion
$1,180.00
Tentative Subdivision Map
$1,475.00
per lot over 5 lots
$0.00
Certificate of Compliance
$300
Certificate of Correction
$100
Site Plan/SPARC
$590.00
Encroachment Permits:
Expedite Review
Double Fee
General Construction
$250
Sidewalk/Driveway
$99.00
Non-construction
$48.00
Downtown Sidewalk Encroachment
$48.00
Utility and other nonpublic construction
$250
Traffic Handling/Lane Closure
$250
Special Events
$226.00
Block Party
$48.00
Public Improvement Reimbursement Agreement
Agreement Preparation
$1,020.00
Reimbursement Collection
$273.00
Address Change
$78.00
Document Fees
Design Standards
$23.00
Construction Specifications
$23.00
Standard Plans
$23.00
Prints/Copies
Size A
$0.15
Size B
$0.57
Size C, D First Sheet
$5.66
Each additional Sheet
$2.26
Size E and Larger First Sheet
$6.78
Each additional Sheet
$3.39
Flans & Specs Sets for bidding (picked up)
$28.25
Plans & Specs Sets for bidding (mailed)
$33.89
Certified Payrolls First Sheet
$1.13
Each additional Sheet
$0.29
Plotted Copy of Existing Map
Size C, D First Sheet
$18.07
Each additional Sheet
$7.90
Size E and Larger First Sheet
$20.33
Each additional Sheet
$7.90
Document preparation
$200
Easement Abandonment (per easement)
$1,200
Easement Dedication (per easement)
$300
Impact Mitigation Fee Payment Agreement
$771.00
Lot Line Adjustment
$1,851.00
Transportation Permit
Single Trip
$16.00
Annual Repetitive Route
$90.00
Streets
Street Name Sign
$464.00
AC Replacement
$20.00
AB Replacement
$13.00
Seal Coat
$0.12
Street Abandonment
$3,140.00
Street Name Change
$495.00