Fourth Quarter Fiscal Year 2019120 Water, Wastewater and Electric Utility
Department Financial Reports
October 21,2020
Deputy City Manager
RECOMMENDED ACTION Receive utility financial reports for the fourth quarter of Fiscal Year
2019t20.
BACKGROUND INFORMATION: ln accordance with the Lodi Municipal Code, quarterly financial
reports are to be prepared for the Water, Wastewater, and Electric
Utilities.
Quarterly update presentations have been included in this report and a highlight of activities and progress
is outlined below for each utility.
Electric Utilitv Financial Hiqhliqhts
REVENUE received was 103 percent of budget. lt is important to note that the budget reflected in
this report was revised at midyear and includes estimated impacts due to COVID-19../ Sales revenue was 101 percent of budget. While the utility experienced a drop in
commercialand industrialsales as a result of COVID-19, the increase in residentialsales
more than offset the loss experienced on the non-residential side../ ln addition, the utility realized higher than estimated interest income and payments
received by others for work performed by utility personnel.
EXPENSES ended the year at 92 percent of budget../ Non-power operating expenses ended the year at 89 percent of budget.,/ Power supply costs ended the year at 98 percent of budget.,/ Capital outlay expenses ended the year at 63 percent of budget due to a delay associated
with the utility's building renovation project which is scheduled to be completed in Fiscal
Year 2021 as well as several vacancies in the utility's Engineering and
Construction/Maintenance Divisions.
RESERVES as of June 30,2020 totaled approximately $09 million. These reserves are used to
fund pay-as-you-go capital improvement and system maintenance projects. These reserves were
recently used during the Fiscal Year 2019/20 budget to fund approximately $3 million in customer
bill credits to help mitigate financial hardships caused by COVID-19.
CAPITAL IMPROVEMENT PROJECTS includes over $24 million over 5 years for capital
improvement efforts. Most notable for Fiscal Year 2019/20 was completion of the Mclane
Substation Renovation Project as well as the utility's ongoing overhead and underground system
maintenance efforts. The projects listed are all in the FiscalYear 2020-2025 Capital lmprovement
Program that was included in the adopted budget.
5-YEAR FINANCIAL FORECAST indicates sufficient reserves over the next 5 years as capital
efforts continue.
a
a
a
a
\fÈffi
Steve Schwàåauêr {Ocl 12,2020 10i26 PDI)APPROVED
Stephen Schwabauer, City Manager
Wastewater litv Hiohliqhts
REVENUE is stable and ended the fiscal year at g9 percent of budget./ Wastewater sales for the fiscal year ended on target at gg percent of budget.
EXPENSES are as a total ended the fiscal year well below the budget at 70 percent./ Operating expenses for the fiscal year ended slightly lower than budget at 93 percent./ Capital expenses for the fiscal year were below budget at 26 percent. lncluded in the
capital budget ¡s $2 6 million for the Main Replacement project B which was bid in the third
quarter and awarded in the fourth quarter, the majority of this expense will occur in fiscal
year 2021. Also included in the budget is $1.5 million for the design of the White Slough
electrical building which the contract has been awarded but only a little over a quarter of
this expense has been incurred through the end of the fiscal year.
RESERVES as of June 30,2020 totaled $16.8 million which is 558 percent of the 90 days cash
target. These reserves are used to fund pay-as-you-go capital improvement projects planned
over the next several fiscal years.
CAPITAL IMPROVEMENT PROJECTS include almost $33 million in planned projects over the
next 5 years. The major projects include main replacement projects, construction of the electrical
building, fan press replacement, aeration diffuser replacement and the storm drain trash handling
systems to comply with state regulations. The projects listed are all in the fiscal year 20-25
Capital lmprovement Program that was included in the adopted budget.
5-YEAR FINANCIAL FORECAST indicates a decline in reserves through fiscal year 2024.
Water Utilitv Hiqhliqhts
REVENUE is stable and ended the fiscal year at 103 percent of budget./ Water sales are ended the fiscal year at 106 percent of budget./ Other revenue is tracking low due to the Build America Bond subsidy that was received is
half of the budgeted amount.
EXPENSES are as a total ended the fiscal year well below the budget at 69 percent./ Operating expenses are ended the fiscal year slightly lower than budget at 92 percent./ Capital expenses ended the fiscal year well below budget at 41 percent. lncluded in the
capital budget is almost 6 million for the Water Meter Project Phase B in which the contract
has been awarded but only a little over half that expense occurred in the fiscal year, the
remainder will be expended in fiscal year 2021. Projects awarded at the end of the fiscal
year but the majority of the expense will be occurring in the following fiscal were Well 3R
Rehabilitation and Well27 GAC Replacement.
RESERVES as of March 31, 2020 totaled $5 million which is 174 percent of the 90 days cash
target. These reserves are used to fund pay-as-you-go capital improvement projects.
CAPITAL IMPROVEMENT PROJECTS include almost $15 million in planned projects overthe
next five years. The major projects include phase I and multi-family phase of the meter program
as well as Well 27 and Well 28 GAC treatment projects. The projects listed are all in the fiscal
year 20-25 Capital lmprovement Program that was included in the adopted budget
5-YEAR FINANCIAL FORECAST indicates a slight decline in reserves in fiscal year 2022
and 2023 due to the completion of the meter project and then forecasts sufficient reserves
through fiscal year 2025.
a
a
a
a
a
FISCAL IMPACT:
FUNDING AVAILABLE
There is no fiscal impact from the preparation of this report.
Adequate funding is available in the FiscalYear 2019120 budget, as
amended by Council action from time to time, for the items in this report.
All data is presented as current as of the date(s) obtained from the City's
financial reporting system. Final year-end audited data will be provided in
the City's CAFR.
0d*T'w
Andrew Keys
Deputy City Ma nage r/l nterna I Services Director
Electric Utility Department
FY 20 Quarterly Update
(Ending June 30, 2020)
City Council Meeting
October 7, 2020
2
Electric Utility Fund
Cash Flow Summary
(June 30, 2020)
Budget Actual % of Budget
Revenue
Sales Revenues 71,082,330 72,181,616 101%
Development Impact Fees 333,870 265,348 79%
Other Revenues (interest, misc)4,147,580 5,348,773 129%
Total Revenues 75,563,780 77,795,737 103%
Expenses
Purchase Power 41,909,430 40,862,716 98%
Non Power 17,762,992 15,727,962 89%
Capital Projects 8,621,113 5,407,693 63%
Debt Service 3,988,010 3,954,223 99%
Cost of Service 2,269,670 2,269,670 100%
In-lieu Transfer to General Fund 7,273,890 7,273,890 100%
Total Expenses 81,825,105 75,496,154 92%
Beginning Cash Balance (6/30/19)37,009,865
Ending Cash Balance (6/30/20)38,969,879
Reserve Policy Target 22,512,000
% of Target 173%
3
Electric Utility Funds
Cash Balances
(June 30, 2020)
Operating Funds $ 27,506,371
Utility Outlay Reserve Fund $ 1,000,000
Public Benefits Fund $ 2,707,800
Impact Fee Fund $ 1,151,758
Solar Surcharge Fund $ 335,650
Greenhouse Gas Fund $ 6,268,300
Total $ 38,969,879
Electric Utility Reserve Policy
(June 30, 2020)
4
Purpose Target Actual*
Operating Reserves $ 21,512,000 $ 37,969,879
Capital Reserve $ 1,000,000 $ 1,000,000
Total Target $ 22,512,000 $ 38,969,879
Cash balances
support City Council
approved reserve
requirements and
provide funds for pay
as you go Capital
Improvement
Projects.
*Includes cash held locally and at NCPA
Capital Improvement Project
5-Year Spending Plan
5
Project FY 19-20
Actuals
FY 20 -21
Budget***
FY 21 -22
Forecast
FY 22 -23
Forecast
FY 23 -24
Forecast
Distribution Capacity Program $383,036 $526,964 $0 $1,100,000 $0
Underground / Overhead Maint $1,845,247 $2,701,000 $1,610,000 $1,342,700 $1,342,700
Streetlight Maintenance / Repair $40,447 $50,000 $50,000 $50,000 $50,000
LED Streetlight Improvements $88,167 $150,000 $150,000 $150,000 $150,000
230 kV Interconnection Project*$237,498 $112,502 $0 $0 $0
Substation Maint / Improvements $1,826,262 $256,990 $0 $300,000 $1,775,000
Building & Security Improvements**$68,262 $2,556,588 $350,000 $0 $0
Work for Others $786,207 $300,000 $550,000 $550,000 $550,000
Vehicles & Equipment $132,567 $255,000 $847,000 $330,000 $680,000
Total Projects $5,407,693 $6,909,044 $3,557,000 $3,822,700 $4,547,700
*Includes planning and design costs only
**LEU Office Renovation Project will commence in FY 2021
***Includes approved CIP budget plus estimated prior year rollover
5-Year Financial Forecast
Looking Ahead
6
FY 19/20
Actuals
FY 20 -21
Budget
FY 21 -22
Forecast
FY 22 -23
Forecast
FY 23 -24
Forecast
Available Cash $38,969,879 $34,855,995 $33,810,283 $31,954,881 $29,018,697
Days Cash 210 175 167 156 141
Reserve Target $22,512,000 $23,658,000 $24,020,206 $24,222,231 $24,292,760
% of Target 173%147%141%132%120%
•Forecast represents preliminary actual results for FY 19/20
•FY 19/20 actuals include ~$3 million in bill credit assistance due to COVID-19
•Current forecast assumes funding of all budgeted full-time positions.
•LEU currently has approximately 20% vacancy rate
Power Sales
(June 30, 2020)
7
Power Sales (kWh)
Customer Class Budget Actual
Residential 156,294,837 157,421,444
Small Commercial 159,140,314 155,726,298
Large Commercial/Small Industrial 46,249,031 41,595,289
Industrial 62,480,889 62,260,480
Total 424,165,071 417,003,511
Revenue ($)
Customer Class Budget Actual Average Rate
Residential $ 27,853,848 $ 30,390,732 $ 0.1931
Small Commercial $ 28,167,008 $ 27,434,013 $ 0.1762
Large Commercial/Small Industrial $ 7,408,165 $ 6,749,733 $ 0.1623
Industrial $ 7,653,309 $ 7,607,138 $ 0.1222
Total $ 71,082,330 $ 72,181,616 $ 0.1731
ECA Revenue
(June 30, 2020)
8
Customer Class Total ($)
Residential $ 2,757,621
Small Commercial $ 2,758,655
Large Commercial / Small Industrial $ 754,921
Industrial $ 1,114,927
Total Revenue $ 7,386,124
9
Electric Utility Fund
Operating Results
(June 30, 2020)
Budget Actual % of Budget
Personnel $ 8,593,370 $ 8,538,207 99%
Supplies, Materials, Services $ 4,431,722 $ 3,404,452 77%
Other Payments $ 4,656,400 $ 3,712,892 80%
Utilities $ 81,500 $ 72,411 89%
Total Operating Expenses $ 17,762,992 $ 15,727,962 89%
Power Supply Costs
(June 30, 2020)
10
Budget Actual % of Budget
Generation $ 29,847,900 $ 28,563,913 96%
Transmission $ 10,540,550 $ 10,860,269 103%
Management Services $ 1,520,980 $ 1,438,534 95%
Total Power Supply Costs $ 41,909,430 $ 40,862,716 98%
Load Coverage
11
•LEU continues to meet or exceed Risk Management targets
•Includes purchases approved through July 2020 by the Risk Oversight
Committee
ROC Matrix Load Coverage
Target (Including Purchases)
Q4 – 2020 99,086 80.0%81.6%
Q1 – 2021 93,097 80.0%81.8%
Q2 – 2021 105,592 70.0%74.1%
Q3 – 2021 133,140 60.0%61.7%
MWh Load
12
Risk Oversight Committee (ROC)
Report Highlights
•Two ROC meetings held April –June 2020
–Provided ROC introduction/training for Mayor as new Alternate
–Forward gas and energy purchases approved to cover open positions
in 2020, 2021 and 2022
–Provided update on hydrologic conditions –50% below average
–Discussed confidential Cap and Trade strategy and activities
–Authorized sale of Low Carbon Fuel Standard Credits
•Note this auction did not occur due to lack of demand for credits
–Approved participation in Clean Fuel Reward Program
•Statewide point-of-purchase rebate program for electric vehicles
–Approved 2019 regulatory reports including Power Source Disclosure,
Renewables Portfolio Standard and GHG Use of Allowance Proceeds
–Approved Fiscal Year 2021 reserve target amounts based on Council
adopted policy
–Discussed potential new utility scale solar project
13
Strategic Areas of Focus
Project Highlights
•Customer
–Continued public outreach campaign targeting low income assistance
–Expanded CARE Program to June 30, 2021
–Work underway for transition to new after-hours answering service
–Extensive social media campaign during recent California Energy Crisis to keep
customers informed during rolling black outs
•Technology
–Broadband Feasibility Study nearly complete
–GIS system deployment architecture review and design completed
–OMS system integration undergoing final testing
•Financial
–Negotiations underway for 10MW solar PPA supporting long term RPS
requirements
–Working with NCPA and other members on joint effort to sell Low Carbon Fuel
Standard credits
14
Strategic Areas of Focus
Project Highlights (continued)
•Reliability
–Scope of work and contract negotiations underway for citywide pole testing
and treatment contract
–Infrastructure inspections continue on schedule
–System-wide engineering study underway for refreshed capacity, reliability,
and system protection analysis
•Workforce Planning
–New Senior Power Engineer hired
–New Senior Electrical Engineering Technician hired
–Continued vacancies on field construction side posing significant challenges to
LEU operations
–Almost 50% vacancy rate for Lineworker classification
1
Public Works Department
Water/Wastewater
FY 20 Quarterly Update
(Ending June 30, 2020)
2
Wastewater Fund
Cash Flow Summary
(Ending June 30, 2020)
Budget Actuals % of Budget
Revenue
Sales 16,249,100 16,096,777 99%
Development Impact Mitigation Fees 1,579,760 1,075,539 68%
Other (interest, septic, misc.)771,000 1,241,641 161%
Total Revenues 18,599,860 18,413,957 99%
Expenses
Operating 8,435,687 7,880,629 93%
Capital 7,442,946 1,942,454 26%
Debt Service 3,324,590 3,236,084 97%
Cost of Services Payment To General Fund 1,119,970 1,119,970 100%
Total Expenses 20,323,193 14,179,137 70%
Beginning Cash (Operations Only)16,333,666
Ending Cash (Operations Only)16,849,190
Days Cash (Excluding Capital)503
% of Target –90 Days Cash on Hand 558%
3
Wastewater
Operating Results
(Ending June 30, 2020)
Budget Actuals % of Budget
Personnel $ 4,174,350 4,222,783$ 101%
Supplies, Materials, Services $ 2,690,167 2,265,520$ 84%
Equipment, Land, Structures $ 285,000 200,781$ 70%
Other Payments $ 455,200 358,964$ 79%
Utilities $ 805,160 808,581$ 100%
Work for Others $ 25,810 24,000$ 93%
Total Operating Expenses $ 8,435,687 $ 7,880,629 93%
4
Operating (530)16,849,190
Utility Capital / Infrastructure Replacement (531)2,761,144
Capital Reserve (532) (Fund used to pay White Slough COP Debt Service)0
Wastewater IMF (533)1,433,660
Rate Stabilization Reserve (534)500,000
Storm Drain IMF (535)1,540,959
Total 23,084,953
Wastewater Funds
Cash Balances
(Ending June 30, 2020)
Amounts above
reserve target are
held for scheduled
capital maintenance
326%
429%
534%547%558%
0
2,000,000
4,000,000
6,000,000
8,000,000
10,000,000
12,000,000
14,000,000
16,000,000
18,000,000
15/16 16/17 17/18 18/19 19/20
Actual Reserves vs. Target
Target
Actual
5-Year Financial Forecast
5
FY 19 -20
Actual
FY 20 -21
Budget
FY 21-22
Forecast
FY 22 -23
Forecast
FY 23 -24
Forecast
Available Cash $16,849,190 $16,495,922 $15,533,969 $12,185,569 $7,347,669
Days Cash
(90 day target)
503 465 427 328 193
Minimum Reserve
Target (25%)
$3,131,000 $3,240,500 $3,316,000 $3,392,500 $3,470,500
Reserve Target (50%)$6,262,000 $6,481,000 $6,632,000 $6,785,000 $6,941,000
% of Days Cash
Target
558%516%475%364%215%
Wastewater
Planned Capital Projects
6
FY 19-20 FY 20-21 FY 21-22 FY 22-23 FY 23-24
Lockeford Street Improvements 13,135
Candy Cane Park 28,000
Storm Drain Trash Handling 750,000 750,000 750,000
MSC Security Improvements 4,272 65,728
MUS PW Admin Building Remodel 150,000
Misc. System Relocations 35,000 35,000 35,000 35,000
Misc. Wastewater Taps 547 40,000 40,000 40,000 40,000
Collection System Capacity Enhancement Projects
Main Replacement Project 52,007 2,547,993 2,000,000 2,000,000
Sewer Lift Station Wet Well Rehab 250,000
Kofu Storm Water Pump Rehab 200,000
Salas Storm Water Pump Rehab 200,000
Henry Glaves Storm Water Pump Rehab 200,000
Lincoln Storm Pump Rehab
Vehicles/Equipment 161,801 211,000 75,000 75,000 75,000
Upgrade Blowers 750,000
Irrigation Improvements 752,763 750,000
Digester #3 Cleaning 500,000
Main Building Rollup Door 12,098
2nd Control Room Roof 36,361
Electrical Room Reroof 92,000
Plant Maintenance Improvements 89,182 100,000 110,000 100,000
Compliance Studies and Reports 200,000 200,000 200,000
Fan Press Replacement 24,375 1,000,000
Aeration Difusser Replacement 1,000,000
NCPA Maintenance Generator 150,000 150,000 150,000 150,000
Pump & Equipment Upgrades 110,000
Electrical/Screen/SCADA Design 404,225 600,000
Electrical Upgrades/SCADA Construction 1,000,000 7,000,000 5,500,000
White Slough Recycled Water Storage 363,689
Miscellaneous Future Projects 100,000
Totals $1,942,455 $8,101,721 $5,550,000 $7,810,000 $9,050,000
7
Water Fund
Cash Flow Summary
(Ending June 30, 2020)
Budget Actuals % of Budget
Revenue
Sales 13,395,170 14,191,983 106%
Development Impact Mitigation Fees 775,450 618,182 80%
Other (interest, tap fees, water meters, misc.)1,294,040 1,074,091 83%
Total Revenues 15,464,660 15,884,256 103%
Expenses
Operating 7,162,147 6,580,042 92%
Capital 11,058,234 4,573,669 41%
Debt Service 2,969,760 3,138,740 106%
Cost of Services Payment To General Fund 860,640 860,640 100%
Total Expenses 22,050,782 15,153,091 69%
Beginning Cash (Operations Only)4,191,634
Ending Cash (Operations Only)5,038,332
Days Cash (Excluding Capital)174
% of Target –90 Days Cash on Hand 193%
8
Water
Operating Results
(Ending June 30, 2020)
Budget Actuals % of Budget
Personnel $ 3,180,680 3,137,863$ 99%
Supplies, Materials, Services $ 1,569,547 1,081,665$ 69%
Equipment, Land, Structures $ 105,000 80,554$ 77%
Other Payments $ 1,661,480 1,579,302$ 95%
Utilities $ 536,590 591,808$ 110%
Work for Others $ 108,850 108,850$ 100%
Total Operating Expenses $ 7,162,147 $ 6,580,041 92%
9
Water Funds
Cash Balances
(Ending June 30, 2020)
Operating (560)5,038,332
Utility Capital / Infrastructure Replacement (561)4,610,212
IMF (562)2,498,937
PCE/TCE Settlements 9,341,934
PCE/TCE Rates (565)3,962,275
Total 25,451,690
Amounts above
reserve target are
held for scheduled
capital maintenance
238%
145%133%
274%
193%
0
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
7,000,000
8,000,000
15/16 16/17 17/18 18/19 19/20
Actual Reserves vs. Target
Target
Actual
5-Year Financial Forecast
10
FY 19 -20
Budget
FY 20 -21
Forecast
FY 21-22
Forecast
FY 22 -23
Forecast
FY 23 -24
Forecast
Available Cash $5,038,332 $5,588,071 $5,465,244 $5,786,044 $7,256,281
Days Cash
(90 day target)
174 197 174 180 222
Minimum Reserve
Target (25%)
$2,644,856 $2,591,500 $2,868,000 $2,928,000 $2,988,000
Reserve Target (50%)$5,289,711 $5,183,000 $5,736,000 $5,856,000 $5,976,000
% of Days Cash
Target
193%219%193%200%246%
Water
Planned Capital Projects
11
FY 19-20 FY 20-21 FY 21-22 FY 22-23 FY 23-24
Water Meter Program 3,368,896 2,500,000 1,000,000 1,000,000
MUS PW Admin Building Remodel 150,000
Lockeford Street Imprv.10,372
Water Taps 75,000 75,000 75,000 75,000
Misc. Water Mains 50,000 50,000 50,000 50,000
Water Meter Replacement Program 75,000 75,000 75,000
GAC Replacement 300,000 300,000 300,000 300,000
Meter Shop Design/Construction 200,000
Water Plant Generator 500,000
MSC Security Improvements 4,272 70,000
Well 4R & 22 GAC Replacement 566,179
Well 7 Pump Rehab 3,487 171,513
Well 14 Pump Rehab 170,000
Well 16 Pump Rehab 166,000
Well 17 Pump Rehab 185,000
Well 21 Pump Rehab 200,000
Well 22 Pump Rehab 166,000
Well 3R Pump Rehab 49,048 120,952
Well 15 Pump Rehab 200,000
Well 25 Pump Rehab 200,000
Well 27 GAC Treatment & Standby Generator 19,672 800,328
Well 28 GAC Treatment 950,000
Vehicles/Equipment 251,575 40,000 50,000 50,000 50,000
Totals $4,273,501 $6,293,793 $2,071,000 $1,750,000 $750,000