Loading...
HomeMy WebLinkAboutAgenda Report - October 21, 2020 C-04AGENDA ITEM c-4 Crrv or Lou C outruc rr C ou ruuN rcATI oN IM AGENDA TITLE: MEETING DATE: PREPARED BY: Approve Plans and Specifications and Authorize Advertisement for Bids for Well 28 Granular Activated Carbon System, Adopt Resolution Authorizing City Manager to Award Contract to Lowest Responsive Bidder ($1,400,000), or Reject all Bids, Execute Change Orders ($140,000), and Appropriating Funds ($510,000) October 21,2020 Public Works Director RECOMMENDED ACTION: Approve plans and specifications and authorize advertisement for bids for Well 28 Granular Activated Carbon System, adopt resolution authorizing City Manager to award Contract to lowest responsive bidder, in an amount not to exceed $1,400,000, or reject all bids, execute change orders in an amount not to exceed $140,000, and appropriating funds in the amount of $510,000. BACKGROUND INFORMATION: ln 2017, Well 28 was removed from service in anticipation of the new State drinking water standards for the regulated chemical known as 1,2,3,- trichloropropane (1,2,3-TCP). This project is needed for the well to meet State drinking water standards and return to service. For decades, Granular Activated Carbon (GAC) has been utilized at several well sites within the City to adsorb dibromochloropropane (DBCP). The State Water Resources Control Board has identified GAC as a best available technology for also removing 1,2,3-TCP contamination from drinking water. This project consists of furnishing and installing a GAC treatment system for Well 28, located at 2800 Kettleman Lane, as shown on Exhíbit A. The work for this includes furnishing and installing a GAC filter system, complete with four low profile tanks, carbon media, concrete pad, and all required on-site piping and valving, including approximately 90 linearfeet of B-inch water pipe,231 linearfeet 12-inch water pipe, 156 linear feet of 14-inch water pipe, and 90 linear feet of eight-inch wastewater pipe, and other incidental and related work. The plans and specifications are on file in the Public Works Department. The planned bid opening date is November 18,2020. The project estimate is $1,300,000. The work is anticipated to be complete by summer 2021. Staff recommends authorizing City Manager to award Contract to lowest responsive bidder, in an amount not to exceed $1,400,000, or reject all bids, execute change orders in an amount not to exceed $140,000, and appropriating funds in the amount of $510,000. FISCAL IMPACT:Annual operation and maintenance costs for the water utility will increase as a result of Well 28 being placed back into service with the addition of the GAC treatment system. This project does not impact the General Fund. APPROVED n KIWP\PROJ ECTS\WATER\Well 28 GAC\CPSA-Award.doc r, City Manager 101812020 Approve Plans and Specificâtions and Authorize Advôrlisement for Blds tor Well 28 Granular Activated Cârbon System, Adopt Resotulion Authorizing City Managör to Awârd Conkâct to Lowest Responsive Bidder (S,l,400,000), or Reject âll Bids, Execute Change Orders (Sf40,o0o), and Aþproprtating Funds ($01ó,000) October21,2020 Pâge 2 FUNDING AVAILABLE:Fiscal Year 2A20121 Budget: Water Capital Fund (561 99000.77020)$1,030,000 Req uested Appropríation : Water Capital Fund (561 99000.77020) TOTAL: $. 5Jo,o00 $1,540,000 Andrew Keys Andrew Keys Deputy City Manager/lnternal Services Director Charles E., Jr. Public Works Director Prepared by Jiml Billlgmeler, Associale Clvil Engineer CES/JB/tc Attachment cc: Andrew Richle, Utilllles Superintendenl Travls Kahrs, Water Plant Super¡ntendent KIWP\PROJECTS\WATER\Well 28 GAC\CPSA-AWârd.doc 101812020 !!!!!!!!!!!!InterlakenDr.TiendaDr.MarigoldWy.Tu lipWy.BerlandaLn.TaylorRd. G a l aDr. St.AntonDr. 12Hwy 12 CenturyBlvd. Vine St. PrimroseDr.WestgateDr.Sylvan Wy.Van Rui t en Dr . Kettleman Ln / Hwy 12 Lower Sacramento Rd.Exhibit A Well 28 Granular Activated Carbon (GAC) Filter System2800 West Kettleman Lane Legend !!!!!!!!!!!!!!!!!!!!!!Project Footprintµ 0 0.25 0.50.125 Miles Date: 9/30/2020 Document Path: K:\WP\PROJECTS\WATER\Well 28 GAC\ExhibitA-Vicinity Map.mxd #70Section IProject LengthPriorityNormalSection IIExpenditure Prior Years FY 19/20 EstimateFY 20/21 BudgetFY 21/22 FY 22/23 FY 23/24 FY 24/25 Future Yrs TotalContracts -$ 80,000$ 1,440,000$ 1,520,000$ Internal Staff10,000$ 10,000$ Miscellaneous 10,000$ 10,000$ Total Capital Costs-$ 80,000$ 1,460,000$ -$ -$ -$ -$ -$ 1,540,000$ Section IIIFunding Source(s) Prior Years FY 19/20 BudgetFY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Future Yrs Total561 - Water Capital Outlay -$ 80,000$ 1,460,000$ 1,540,000$ Total Project Financing -$ 80,000$ 1,460,000$ -$ -$ -$ -$ -$ 1,540,000$ Section IVOperating Cost or (savings)Prior Years FY 19/20 BudgetFY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Future Yrs TotalPersonnel -$ -$ Other Operating Costs -$ -$ Total Operating Impact-$ -$ -$ -$ -$ -$ -$ -$ -$ Funding Sources/Methods of FinancingOperating Budget ImpactEstimated Project CostsCapital Improvement Program ‐ MaintenanceAdditional InformationThis project is needed to design a GAC treatment system to removal groundwater contaminants to meet state and federal drinking water standards. Justification/factor driving projectDescription07/19 to 06/20This project provides funding to design a Granular Activate Carbon (GAC) treatment system at the City's existing municipal Well No. 28 located at 2800 West Kettleman. Munis Project Code:PWWA‐20001Maintenance Project Title:Well No 28 GAC Treatment Syste