HomeMy WebLinkAboutAgenda Report - October 7, 2020 C-08AGENDA ITEM c-g Crty or Lool Coulcru ConlMUNrcATroN TM AGENDA TITLE MEETING DATE: PREPARED BY: Adopt Resolution Awarding Contract for Well 7 Electrical lmprovements to Yupana lnc., of Concord ($89,795), and Authorizing City Manager to Execute Change Orders ($10,000) October 7,2020 Public Works Director RECOMMENDED ACTION Adopt resolution awarding contract for Well 7 Electrical lmprovements to Yupana lnc., of Concord, in the amount of $89,795, and authorizing City Manager to execute change orders in an amount not to exceed $10,000. BACKGROUND INFORMATION: Built in 1978, the motor control center serving Well 7 is antiquated and is in need of replacement to comply with current industry standards. ln 1994, additionalelectrical upgrades were performed This project will complete the on-site electrical upgrades by adding a new motor control panel, replacing wire feeds to the pump, site lighting and site equipment/electrical controls, and other related work, all as shown on the plans and specifications for the above project. The new pump motor control panel will regulate voltage, provide better pump efficiency, and comply with current electrical standards. The well site location is shown on attached Exhibit A. Plans and specifications for this project were approved on August 5,2020. The City received the following six bids for this project on September 16,2020: Above/(Below) Engineer's EstimateBidder Engineer's Estimate Yupana lnc. JB Electric and Constr., lnc D.L. Payne, lnc. Howk Systems Telstar lnstruments Bockmon & Woody Location Concord Fairfield Lodi Modesto Concord Stockton B¡d $90,000 $89,795.00 $89,227.99 $99,233.00 $110,143.00 $123,416.00 s138,722.00 ($2o5.oo) 8,227.99 9,233.00 $20,143.00 33,416.00 $48,722.00 The requested change order authorization is to account for unforeseen contract costs and associated staff time to deliver the project. Staff recommends awarding contract for Well 7 Electrical lmprovements to Yupana lnc., of Concord, in the amount of $89,795, and authorizing City Manager to execute change ordeis in an amount not to exceed $10,000. APPROVED K:\WP\PROJ ËCTS\WATER\Well 7\CAward.doc Stephen , City Manager 912212020 AdoptResolutionAwârdingContractforWellTElectricallmprovsmentstoYupana lnc.,ofConcord($89,795),andAuthorizingCltyMânágortoExecuteChange Orders (910,000) Octobêr 21, 2020 Pege 2 FISCAL IMPACT The project will have a minimal impact on total maintenance costs but enhance the safety and reliability of the pumps served by the upgraded electrical system. This project does not impact the General Fund. FUND¡NGAVAILABLE: FiscalYear2020l2lBudget: WaterCapitalFund(56199000.77020): $168,000 Andrew Keys Andrew Keys Deputy City Manager/lnternal Services Director Charles E. Swimley, Jr, Public Works Director Prepared by Jimi Billigmeier, Associate Civil Engineer CES/JB/tc Attachments cc: Androw Richle, Utilities Superintendenl Travis Kahrs, Water Plant Supedntendent Muzaffer Mete Dalad, Yupana lnc. Ki\WP\PROJ ECTS\WATE R\Wêll 7\CAward,doc 9122t2020 ^_^_ ^_Ham Ln.Turner Rd. Lodi Ave.Mills Ave.Hutchins St.Church St.Pine St. Lockeford St.Stockton St.Elm St.Lower Sacramento Rd.Woodbridge Rd µ0.4 0 0.40.2 Miles Legend ^_Well No. 7 Exhibit AWell Site Location