Loading...
HomeMy WebLinkAboutAgenda Report - October 7, 2020 C-07AGENDA ITEM c-7 Crty op LopI Coulctl CowTMUNrcATroN AGENDA TITLE:Adopt Resolution Awarding Contract for Church Street Bike and Pedestrian lmprovement Project to A.M. Stephens Construction Co., lnc., of Lodi ($1,220,878), and Authorizing City Manager to Execute Change Orders ($250,000) MEETING DATE: October 7,2020 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution awarding contract for Church Street Bike and Pedestrian lmprovement Project to A.M. Stephens Construction Co., lnc., of Lodi, in the amount of $1,220,878, and authorizing City Manager to execute change orders in an amount not to exceed $250,000. BACKGROUND INFORMATION: The project is located on Church Street, from Chestnut Street to Lockeford Street, and includes resurfacing the roadway, reducing the existing four travel lanes to two travel lanes, installing a two-way left-turn lane, installing Class ll bike lanes, modifying the signal equipment to provide bike detection at intersections, and installing other pedestrian accessibility enhancements. This project was originally approved for bidding on October 2,2019. After receiving bids that far exceeded the funding available, Staff recommended Council reject all bids to allow Staff to modify the plans to reduce costs. The modifications eliminated project elements that do not impact the original project goals, such as using existing signal poles and simplifying traffic striping. The resulting cost savings is approximately $750,000. Specifications for this project were approved on June 3, 2020. The City received the following three bids for this project on September 9,2020: IM Bidder Engineer's Estimate A.M. Stephens Const. FBD Vanguard Const. DSS Co. (Knife River) Location Lodi Livermore Stockton B¡d $ 1,254,600.00 $ 1,220,878.40 ç 1,221,438.00 $ 1,385,745.00 Above/(Below) Estimate $ (33,721.60) $ (33,162.00) $ 131,145.00 FISCAL IMPACT APPROVED There will be a slight increase in traffic signal and striping maintenance costs and a minimal long{erm cost-savings related to the pavement resurfacing and pedestrian improvements. This project does not impact the General Fund. n K:\WP\PROJECTS\STREETS\Church St Road Diet\CAward.doc ity Manager 912312020 Adopt Rêsolulion Awarding Contract for Church Streel Bike and Podsslr¡an lmprovemenl Proiect to A.M. Stêph€ñs Constrr.iction Co,, lnc., of Lodl ($1,220,s7s), and Authorizing Ciþ Manager to Execute Change Orders ($250,000) October 7, 2020 Pâgê 2 FUNDING AVAILABLE:Measure K Grant (30399000.77020): Measure K Local Match (30399000.77020: Total: Andrew Keys Andrew Keys Deputy City M anager/l nternal Se rvices Di rector Charles E. Swimley, Jr Public Works Director $ 1,396,779$ 155.198 $ 1,551,977 Prepared by Sean Nathan, Senior Clvll Eng¡neer CES/SNitc Attachment cc:Utility Superintendent Enginesring Technlclan ll, John Plzzo KIWP\PROJECTS\STREETS\Church St Road Diet\CAward.doc 912312020 C-7 LOD| C|TY COUNCTL OCT 7,2020 LODI CITY MANAGER Agenda ltem C-7 Church Street Project Oct7,2020 blue sheet. This is the third request for making traffic flow changes on Oak and Walnut Streets as previously outlined. These two streets are too narrow for 2way traffic with parking on both sides of the street. Long wheel based vehicles parked on both sides of the street leave only enough room for one car at a time to travel through. My original request was first of all in consideration of the City to make economical additions to the mentioned project on Church St, at the time of construction and not have to spend a more excessive amount at a later date. Since this request has been ignored, I assume the City does not want to study or reach out to the Citizens of Lodi to pursue this change. This is unfortunate, as it will continue to be a burden on the Citizens of Lodi to struggle with this bottleneck. I assume bicycle clearance safety is more important than vehicle safety clearance. Mike Lusk, Lodi Page 1 of 3