Approve Plans and Specifications and Authorize Advertisement for Bids for Alley
lmprovement Project - Phase I
October 7,2020
Public Works Director
RECOMMENDED ACTION Approve plans and specifications and authorize advertisement for
bids for Alley lmprovement Project - Phase B.
BACKGROUND INFORMATION: The City has reconstructed various alleys over the past ten years.
The projects have typically included between one and two alleys per
year, depending on funding levels. Specific projects are
selected from a citywide alley condition assessment list where each alley is rated based on pavement
condition and drainage problems. Alley projects located in future phases of the water meter program are
either improved concurrently with the specific water meter phase or deferred until after it is completed, to
prevent new alley improvements from being disturbed.
Phase I consists of reconstructing the alley south of Elm Street between Garfield Street and Cherokee
Lane, as shown on Exhibit A. The project includes approximately 15,000 square feet of pavement
removal and replacement, 700 square feet of concrete removal and replacement of new alley approach
and sidewalk, installation of 700 lineal feet of concrete valley gutter, installation of storm drain system
improvements, and other incidental and related work, all as shown on the plans and specifications for the
above project.
The plans and specifications are on file in the Public Works Department. The planned bid opening date
is November 4,2020. The project estimate is $210,000.
FISCAL IMPACT The project will reduce maintenance costs in the reconstructed alleys.
The City will be using Community Development Block Grant (CDBG) funds.
Specific funding information will be identified at project award.
FUNDING AVAILABLE
Prepared by Alice Bernardino, Assistant Engineer
cEs/AB/jb
Attachment
cc: Neighborhood Services Manager
APPROVED:
E ,Jr
Public Works Director
Schwa
\\cvcfilv02\pubwks$\WP\PROJECTS\STREETS\AIley lmprovements Phase I (2020)\CPSA.doc
, City Manager
912212020
Garfield St.Calaveras St.Be
c
k
ma
n Rd.
O a k S t .Hansen Dr.Houston Ln.V i c t o r R d .
Railroad Av.
L o c k e f o r d S t .Garfield St.Locust St.
E lm S t.
W a l n u t S t .Central Av.Beckman Rd.Cherokee Ln.Hwy 99P in e S t.
µ
0 250 500125
FeetLegend
Proje ct L ocation
Alley Improvement ProjectPhase 8Project Location
c-4
LODI CITY COUNCIL June 3,2020
LODI CITY MANAGER
Agenda ltem C-04 Church Street June 3,2020 meeting blue sheet.
Refer to my request dated Nov. 6, 2OL9 below wherein I asked the City to make
changes to Oak and Walnut Street traffic flows. This request was timely in the
respect that considerations of design on Church Street would be appropriate
before bidding. Taking into account changes to design for left hand turn lanes on
Church to one way traffic flows would change the traffic signaling design to
accommodate signal arrows or yield signage for turning and one way traffic
signage, etc,. I would still like to see these changes incorporated into this project.
Mike Lusk, Lodi
LODI CITY COUNCIL Nov.6, 2019
LODI CITY MANAGER
THIS IS A REQUESTTHATTHE CITY OF LODI CONSIDER THE FOLLOWING
TRAFFIC FLOW CHANGES DURING THE LOCKEFORD ST. TO LODI AVE. CHURCH
STREET CHANGES.
1. MAKE OAK STREET ONE WAY TRAVELING EAST BETWEEN CHURCH ST. AND
SACRAMENTO ST.
2. MAKE WALN UT STREET ON E WAY FROM SACRAM ENTO STREET TRAVELING
WESTTO CHURCH STREET.
3. ELIMINATE LEFT HAND TURN LANE ON CHURCH STREET AT WALNUT STREET
INTERSECTION. NO LEFTTURN WHEN TRAVELING SOUTH ON CHURCH ST.
Page 2 of 3
REASONING FOR REQUEST IS BECAUSE OF EXTENDED WHEEL BASE ON
PICKUPS AND SUV VEHICLES. THEY PROTRUDE INTO LANES OF TRAFFIC ON OAK
STREET MAKING IT DIFFICULT FOR TWO CARS TO PASSBY EACH OTHER WITHOUT
ENOUGH SIDE CLEARANCE, THEREBY RESTRICTING THE FLOW OF TRAFFIC. WHEN
DELIVERY VEHICLES ARE DOUBLE PARKED ON OAK ST. IT FURTHER RESTRICTS THE
FLOW OF TRAFFIC.
ON WALNUT A SIMILAR PROBLEM EXISTS NEAR THE INTERSECTION OF
WALNUT ST. AND CHURCH ST. WHEN MAKING A RIGHT HAND TURN OFF OF
CHURCH ST. GOING EAST ON WALNUT ST. IF AN EXTENDED WHEEL BASE VEHICLE
IS DIAGONALLY PARKED ATTHE BANK OF STOCKTON, YOU HAVE TO SWING WIDE
¡NTO ONCOMING TRAFFIC LANE. SAME PROBLEM REST OF STREET TO SCHOOL ST.
MAKE BOTH SIDES OF OAK ST. AND WALNUT ST. DIAGONAL PARKING IN THE
SAME DIRECTION WITH FLOW OF ONE WAYTRAFFIC. THUS LEAVING PLENTY OF
ROOM FOR ONE TRAFFIC LANE IN THE MIDDLE OF THE STREET FOR
UNRESTRICTED SINGLE LANE TRAFFIC FLOW.
RESPECTFULLY
MIKE LUSK , 2578 COLONY DR. LODI, CA.95242
Page 3 of 3