AGENDA TITLE:
MEETING DATE:
PREPARED BY:
Accept lmprovements Under Contract for 2020 Downtown Concrete Cleaning
September 2,2020
Public Works Director
RECOMMENDED ACTION Accept improvements under contract tor 2020 Downtown Concrete
Cleaning.
BACKGROUND INFORMATION: ln 1998, the City's CentralCity Revitalization lmprovement Project
installed yellow colored concrete on School Street, from Lodi
Avenue to Locust Street. As part of the maintenance, the colored
concrete needs to be cleaned periodically. Council has directed Staff to have this service performed on
an annual basis.
This project removed debris and pressure washed the yellow concrete bands, and spot cleaned the
paver areas along School Street, between Lodi Avenue and Locust Street. The project also included the
large concrete "sun" feature located in Elm Street, between School Street and Sacramento Street. The
work was done at night in order to minimize business interruptions.
The project was awarded to Sure Clean, lnc., of Cool, in the amount of $21,495. The contract has been
completed in substantialconformance with the specifications approved by City Council and was
completed within the original contract amount and schedule. Photos of completed work are shown in
Exhibit A. lt's also worth noting that due to the age of the concrete, it often appears dirty even though it is
clean. This is due to the top layer of the concrete being worn off and the small rocks that are inside of
the concrete mix being visible. A photo of new and old concrete is included for comparison, also shown
in Exhibit A.
Following acceptance by the City Council, as required by law, the City Engineer will file a Notice of
Completion with the County Recorder's office. The notice serves to notify vendors and subcontractors
that the project is complete and begins their 30-day period to file a stop notice requiring the City to
withhold payments from the prime contractor in the event of a payment dispute.
FISCAL IMPACT: There is no long-term fiscal impact associated with this project.
FUNDING AVAILABLE: This project was funded by the Street Fund (30099000.77020)
Charles E. Swimley, Jr
Public Works Director
Prepared by Sean Nathan, Senior Civil Engineer
CES/SN/tc
Attachment
APPROVED:
K:\WP\PROJECTS\STREETS\Downtown Concrete Cleaning Project\2020 Project\CAccept
, City Manager
811912020
Exhibit A
Original yellow concrete on the left, newer (2‐year old) concrete on the right (both are clean)