HomeMy WebLinkAboutAgenda Report - July 15, 2020 C-06AGENDA ITEM c-b Crrv or Lonr CouNcrr CovrMUNrcATroN TM AGENDA TITLE: MEETING DATE: PREPARED BY: Adopt Resolution Awarding Contract'Íor 202012021 Pavement Resurfacing Project, Various Locations, to American Pavement Systems, lnc., of Modesto ($1,254,706), Authorizing City Manager to Execute Change Orders ($100,000), and Appropriating Funds ($1,354,706) July 15,2020 Public Works Director RECOMMENDED ACTION: Adopt resolution awarding contract for 2020121 Pavement Resurfacing Project, Various Locations, to American Paving Systems, lnc., of Modesto, in the amount of $1 ,254,706, authorizing City Manager to execute change orders in an amount not to exceed $100,000, and appropriating funds in the amount of $1,354,706. BACKGROUND INFORMATION This pavement resurfacing project includes the application of rubberized asphalt cape sealand fiberized slurry seal. The project limits will include various streets throughout the City, as shown on Exhibit A. The rubberized asphalt cape seal is a two-layer system of a rubberized chip seal on the bottom, with a fiberized slurry seal (slurry seal with strands of glass fiber added) on top. The rubberized cape seal will be applied to streets with more surface defects, while only one layer of fiberized slurry seal will be applied to those streets with fewer surface defects. Specifications for this project were approved on lt[ay 20,2020. The City received the following four bids for this project on June 17 ,2020: Bidder Location Bid Above/(Below) Estimate Engineer's Estimate American Pavement Systems Modesto VSS lnternational West Sacramento Pavement Coatings Co. Sacramento lntermountain Slurry Seal Sacramento $ 1,291 ,711.00 $ 1,254,706.00 $ 1,307,000.00 $ 1,470,824.00 $ 1,571,571.00 $ (37,005.00) $ 15,289.00 $ 179,1 13.00 $ 279,860.00 Staff recommends awarding contract'Íor 2020121 Pavement Resurfacing Project, Various Locations, to American Paving Systems, lnc., of Modesto, in the amount of $1 ,254,706, authorizing City Manager to execute change orders in an amount not to exceed $100,000, and appropriating funds in the amount of $1,354,706. APPROVED:, Urr,J"fu 7(?r/ K:\wp\pRoJECrs\srREErs\2020 pevement n""rrr""inffistephen schwabauer' city Manager 711t2020 Adopt Resolution Awarding Contract for 2020/2021 Pavement Resurfacing Project, Var¡ous Locations, to American pavement Systems, lnc., of Modesto ($1 ,254,706), Authoriz¡ng City Manager to Execute Change Orders (g'l O0,0OO), and Appropriating Funds ($1 ,354,206)July '15, 2020 Page 2 FISCAL IMPACT:By investing in the recommended maintenance project, significant capital dollars will be saved by extending the useful life of the pavement and foregoing costlier pavement reconstruction. This project does not impact the General Fund. FUNDING AVAILABLE: Requested Appropriation Senate Bill 1 Gas Tax (3049900077020)$ 1,354,706 Andrew Keys Deputy City Manager/lnternal Services Director Charles E. Swimley, Jr Public Works Director Prepared by Sean Nathan, Sen¡or Civil Engineer CES/SN/tc Attachments cc: UtilitySuperintendent Engineering Technician ll, John Pizzo KIWP\PROJECTS\STREETS\2020 Pavement Resurfacing\CAward.doc 71112020 KettlemanLn. Lockeford St.Hutchins St.Century Blvd.Church St.Pine St. Elm St. L o d i A v .Ham Ln.Cherokee Ln.Stockton St.Virginia Av.Central Av.V i n e S t .Lee Av.Washington St.Garfield St.Pleasant Av.O a k S t . W a l n u t S t . Locust St. Railroad Av. Exhibit AProject Locations µ 0 0.25 0.50.125 Miles Legend Cape Seal Slurry Seal Project Title:CIP List Proj #Section IProject LengthPrioritySection IIExpenditure FY 17/18 ActualsFY 18/19 ActualsPrior Years FY 19/20 EstimateFY 20/21 BudgetFY 21/22 FY 22/23 FY 23/24 FY 24/25 Future Yrs TotalContracts -$ 1,354,706$ 1,354,706$ -$ -$ -$ -$ -$ -$ -$ -$ Total Capital Costs -$ -$ -$ -$ 1,354,706$ -$ -$ -$ -$ -$ 1,354,706$ Section IIIFunding Source(s) FY 17/18 ActualsFY 18/19 ActualsPrior Years FY 19/20 EstimateFY 20/21 BudgetFY 21/22 FY 22/23 FY 23/24 FY 24/25 Future Yrs Total304 - Gas Tax 2031 -$ 1,354,706$ 1,354,706$ -$ -$ -$ -$ -$ -$ Total Project Financing-$ -$ -$ -$ 1,354,706$ -$ -$ -$ -$ -$ 1,354,706$ Section IVOperating Cost or (savings)FY 17/18 ActualsFY 18/19 ActualsPrior Years FY 19/20 EstimateFY 20/21 BudgetFY 21/22 FY 22/23 FY 23/24 FY 24/25 Future Yrs TotalPersonnel -$ -$ Other Operating Costs-$ -$ Total Operating Impact -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Funding Sources/Methods of FinancingOperating Budget ImpactEstimated Project CostsFY 2020 Capital Improvement PlanFY 2020‐2021Additional InformationJustification/factor driving projectApplication of rubberized apshalt cape seal and fiberized slurry seal2020/2021 Pavement ResurfacingDescriptionMunis Project Code: