Loading...
HomeMy WebLinkAboutAgenda Report - June 3, 2020 C-11AGENDA ITEM C-l I Crrv or Lonr CouNcrr, CovTMUNICATIoN TM AGENDA TITLE: MEETING DATE: PREPARED BY: Accept lmprovements Under Contract for Mclane Substation Renovation Project. June 3, 2020 Electric Utility Director RECOMMENDED ACTION Accept improvements under contract for Mclane substation renovation project. BACKGROUND INFORMATION: This project upgraded the aging facilities at the Mclane substation. The project scope included replacing two existing front gates, removing and replacing two 60kV breakers, removing and replacing five 12kV breakers, expanding the existing bus structure and installing one new 12kV breaker, providing and installing a pre-fabricated control building along with state of the art control systems equipment, furnishing and installing concrete foundatíons, wire and cable, conduit and cable support systems required to complete the installation, providing electricalcommission testing, and other incidental and related work, all as shown on the plans and specifícations for this project. The project was awarded to Wilson Utility Construction Company of Canby, Oregon, on July 17, 2019, in the amount of $1,605,835.28. The contract has been completed in substantial conformance with the specifications approved by City Council. The final cost of the contract was $1 ,698,926.28. The difference between the original contract amount and final contract was due to four change orders totaling $93,091, which is 5.8 percent of the original contract amount. The contract was completed within the original contract schedule. Photos of completed work are shown in Exhibit A. Following acceptance by the City Council, as required by law, a Notice of Completion will be filed with the County Recorder's office. The notice serves to notify vendors and subcontractors that the project is complete and begins their 30-day period to file a stop notice requiring the City to withhold payments from the prime contractor in the event of a payment dispute. FISCAL IMPACT: The project will improve reliability of the Mclane substation. FUNDINGAVAILABLE: CapitalprojectEUCP-18148. Jeff Berkheimer Jeff Berkheimer Electric Utility Director Prepared by Hasan Shahriar, Engineering and Operâtions Manager Attachments APPROVED: , City Manager Page 1 of 2 EXHIBIT – A New 60kV breakers New control building and front gate Page 2 of 2 Protection equipment inside control building New 12kV breakers and bus structure