Loading...
HomeMy WebLinkAboutAgenda Report - June 3, 2020 C-03AGENDA ITEM c-3 Crrv or Lou C oulcrr C oprvruNl cATr oN AGENDA TITLE: MEETING DATE: PREPARED BY: Approve Plans and Specifications and Authorize Advertisement for Bids for Stormwater Trash Collection Project - Phase 1 (2020) June 3, 2020 Public Works Director RECOMMENDED ACTION: Approve plans and specifications and authorize advertisement for bids for Stormwater Trash Collection Project - Phase 1 QA2q. BACKGROUND INFORMATION: The City is permitted by the State Water Board to discharge stormwater into the Mokelumne River under the statewide general [niij"t small municipal storm sewer systems (referred to as The State has mandated that all trash (items as small as a cigarette) be collected prior to discharging to rivers or streams, and has specified a compliance deadline of December 2030. Currently, trash that blows out of overfilled garbage cans (or littered) gets washed into our storm drain system. Approximately one-third of the City's storm drainage system ends up discharging into the Mokelumne River. None of these systems that discharge into the river currently are able to capture the trash prior to discharge. Staff is generally prioritizing locations by high risk land uses (as required by the State), size of outfall, and size of drainage area. This proposed first phase will cover the 60-acre drainage area of Outfall No. 2, with construction being near the intersection of Turner Road and Beckman Road (Exhibit A). Staff anticipates a total of 10 phases in order to comply with the State's requirement. The total cost of this program is estimated at $6.5 million, over the next 10 years and is included in the Wastewater Enterprise Financial Plan. The project will install a trash capture device upstream of the Outfall No. 2 discharge point. The device will be approximately 10 feet in diameter and 20 feet in depth, with only a manhole opening visible at the surface. The specifications are on file in the Public Works Department. The planned bid opening date is July 1 ,2020. The project estimate is $350,000. FISCAL IMPACT: This project will slightly increase annual storm drainage maintenance costs for the trash capture device. FUNDING AVAILABLE: Funding will be identified at project award Charles E ey, Jr Public Works Director Prepared by Al¡ce Bernardino, Assistant Engineer CES/AB/tc Attachment cc: Sean Nathan, Senior C¡v¡l Engineer Andrew Richle, Utility Superintendent APPROVED: p K:\WP\PROJECTS\STORMDRN\Stormwater Trash Collection Project - Phase 1 (2020)\CPSA.doc , City Manager 5t19t2020 ) Y o k u t s D r .99Donner Dr. S o n o r a Av e . Columbia Dr.Golden Av.Pioneer Dr. Murray St. Lockeford St.Cherokee Ln.Black Diamond Wy.Cluff Av.Beckman Rd. Turner Rd.Hwy 99Exhibit A )Capture Device Location Outfall No. 2 Drainage Area 0 400 800200 Feet Stormwater Trash Collection Project Phase 1 (2020)