HomeMy WebLinkAboutAgenda Report - September 20, 2000 E-18FF
P
COUNCILCITY OF LODI • •
LL
AGENDA TITLE: Authorize City Manager to Enter Into a Contract with Brown & Caldwell to Update
City of Lodi's Urban Water Management Plan
MEETING DATE: September 20, 2000
PREPARED BY: Public Works Director
RECOMMENDED ACTION: That the City Council authorize the City Manager to execute a contract with
Brown & Caldwell to update Lodi's Urban Water Management Plan and
appropriate $25,000 for the project.
BACKGROUND INFORMATION: The California Urban Water Management Planning Act requires
that each urban water supplier providing water for municipal
purposes either, directly or indirectly, to more than 3,000
customers, or supplying more than 3,000 acre-feet of water
annually, prepare, update, and adopt its urban water management plan (UWMP) at least once every five
years. Lodi exceeds both these criteria and the next plan is due by December 31, 2000.
Lodi completed its original UWMP in 1991, a required addition in 1993, and the required update in 1995.
Attached is a checklist of the items required to be addressed in the UWMP. There are numerous new
provisions required in the 2000 update. City staff will provide much of the information for many areas of the
update.
Many of the new provisions can be completed more efficiently by a consultant familiar with UWMP's.
Brown & Caldwell is a firm with a good reputation that is completing UWMP's for numerous water suppliers
and has completed several other projects for the City of Lodi. Attached is Brown & Caldwell's proposal to
prepare Lodi's UWMP.
There is no direct penalty for not updating the UWMP. However, not updating the plan can adversely effect
Lodi's ability to procure certain loans and grants from the State.
FUNDING: The money for this project will come from the Water Utility. A portion ($10,000) is available in
the Water Operating Budget and the balance ($15,000) is from Water Fund balance.
Project Estimate: $ 25,000
Funding Available: r
Vicky McAthi , Finance Director
Richard C. Prima, Jr.
Public Works Director
Prepared by Frank Beeler, Assistant Water/Wastewater Superintendent
RCP/FEF/dsg
Attachments
cc: Fran E. Forkas, Water/Wastewater Superintendent
Frank Beeler, Assistant Water/Wastewater Superintendent
APPROVED:
F . Dixon Flynn -- City Manager
CAWINDOWS\TEMP\CC UWMP 9-00a.doc 819/00
2000 Urban Water Management Plan Checklist
Checklist Organized According to Water Code Section
Section of Law Items to address
10620 (d) (2)
Coordinate the preparation of its plan with other appropriate agencies, including direct and
indirect suppliers, wastewater, groundwater, and planning agencies (refer to Section 10633).
10631 a
Provide current and projected population in 5 -year increments to 20 years.
"
Describe the climate and other demographic factors.
10631 (b)
Identify and quantify the existing and planned sources of water available in 5 -year increments
to 20 years.
10631 c)
Describe the reliability of the water supply.
"
Describe the vulnerability of water supply to seasonal or climatic shortage.
"
Describe average, single dry and multiple dry water year data.
"
Describe any plans to replace inconsistent water sources.
10631 d
Describe opportunities for exchanges or transfers of water on short-term or long-term basis.
10631 e 1
Quantify past and current water use in 5 -year increments to 20 years.
10631 e 2
Identify projected water uses among water use sectors in 5 -year increments to 20 years.
10632 (a)
Provide water shortage stages of action, including up to a 50 percent reduction, outlining
specific water supply conditions at each stage.
10632 b
Provide minimum water supply estimates based on driest three-year historic sequence.
10632 c
Provide actions a water supplier will take to prepare for a catastrophe.
10632 d
Provide mandatory prohibitions.
10632 e)
Provide consumption reduction methods.
10632(o
Provide penalties or charges.
10632
Provide an analysis of the impacts on the water supplier revenues and expenditures.
10632
Provide measures to overcome revenue and expenditure impacts.
10632 h
Provide a copy of a draft water shortage contingency resolution or ordinance.
10632 i
Provide a mechanism for determining actual reductions in water use.
10633 a
Describe the wastewater collection and treatment systems in the supplier's service area.
"
Quantify the amount of wastewater collected and treated in the supplier's service area.
"
Describe the methods of wastewater disposal in the supplier's service area.
10633 (b)
Describe the type, place, and quantity of recycled water currently used in the supplier's
service area.
10633 c) d
Describe and quantify potential uses of recycled water in 5 -year increments to 20 years.
"
Describe the technical and economic feasibility of serving potential recycled water users.
10633 a
Describe the actions that may be taken to encourage recycled water use.
"
Provide the projected acre-feet reliults of recycled water used per year.
10633
Provide a plan for optimizing the use of recycled water in the supplier's service area.
"
Provide actions to facilitate the installation of dual distribution systems and to promote
recirculating uses.
10635 (a)
Provide an assessment of the reliability of the water supplier's water service to its customers
during normal, single dry, and multiple dry water years.
"
Compare the total water supply sources available to the water supplier with the total projected
water use over the next 20 years, in 5 -year increments (refer to 10631 (c)).
"
Compare normal, single dry, and multiple dry water year projected water supply sources
available to the water supplier with the normal, single dry, multiple dry water year projected
water uses (refer to
10642
IMake plan available for public inspection before its adoption.
11
Adopt plan as prepared or as modified after the public hearing
Scope of Work Preparation of Urban Water
Management Plan
This scope of work consists of preparing an urban water management
plan (plan) for the City of Lodi (Ciq,). The objective for the urban
water management plan is to fulfill the requirements of the California
Urban Water Management Planning Act and the reporting requirements
of the California Urban Water Conservation Council.
The scope of work consists of several tasks that are in conformance
with the Urban Water Management Plan Checklists and %X"orksheets
provided by the California Department of Water Resources.
Task 1. Detailed Water Management Plan Outline
Before starting the detailed preparation of the urban water management
plan, a detailed outline will be prepared for review with City staff. The
goal is to reach a consensus regarding the detailed outline, structure, and
content of the plan.
Task 2. Data Collection and Review
Pertinent information needed to prepare the urban water management
plan will be collected and reviewed. A written data request will be
submitted to the City. The data and information will be reviewed to
become acquainted with the service area, existing sources of supply,
transmission and distribution facilities, existing system operations,
historical demands, potential sources of supply, and any other
information as required to prepare the urban water management plan.
Task 3. Description of Water System (Supplier
Service Area)
The characteristics of the water system including geographic location,
demographic information, customer description, climate, system
facilities, and sources of supply will be described. We will utilize the
information in the last master plans prepared for the City, and update
the information to reflect recent changes. The following subtasks
describe the work for this task.
Task 3.1 -Prepare Service Area Map
A map for inclusion in the plan depicting the service area and principal
features of the water system will be prepared.
Task 3.2 -Describe Existing Water Systems
A description of the climate, geography, and characteristics of the water
system will be presented. The physical characteristics of the water
system, including significant supply and distribution facilities, will be
described.
BROWN AND
CA L D W E L L 99761-003Lodi UMP Scope Rev1.700.00C
Preparation of Urban Water Management Plan: Scope of Work
Task 3.3 -Describe Existing and Future Land Use and Population
Existing and future population, dwelling units, and employment will be
quantified using available census data, state information, and other
information sources. The number of existing customers broken down
by customer category will be presented. The existing population and
land use xvill be used under Task 7 to develop the unit water demand
factors.
Task 4. Agency Coordination
Assistance will be provided to the City to coordinate preparation of the
plan with appropriate agencies, including other water suppliers, water
management agencies, and relevant public agencies.
Task 5. Water Use
Past and current water use will be quantified and projected in 5 -year
increments to 20 years, identifying the uses among water use sectors.
The following subtasks describe the work for this task.
Task 5.1 -Describe Existing Water Use Characteristics
Existing and historical water use will be defined in terms of annual,
monthly, and maximum day demand. Maximum day and peak hour
peaking factors will be determined. Unit water demands
(gallons/capita/day) for major user classes will be developed. The unit
water demands will be used to project future water use.
Task 5.2 -Develop Future Water Requirements
Future water requirements using the unit water demand factors and
future population and employment will be developed. Future water
requirements will be expressed for each year to 20 years and for buildout
conditions. Future water requirements will be presented in terms of
annual and maximum day use.
Task 6. Water Supplies
The existing and planned sources of water available to the City in 5 -year
increments to 20 years or as far as data are available will be identified
and quantified. 'These sources include local water supplies
(groundwater, surface water, recycled water, other), imported water
supplies (local and regional water wholesalers and interconnections with
neighboring systems), and potential water supplies from any other
source.
Task 6.1 -Transfer or Exchange Opportunities
Opportunities for exchanges or transfers of water on a short-term or
long-term basis for each water system will be described.
Task 6.2 -Inconsistent Water Source
For any water source that may not be available at a consistent level of
use, given specific legal, environmental, water quality or climatic factors,
plans to replace that source with alternative sources or water demand
BROWN AND
CA L D W E L L IJW%-IP Swipe 1700.dX 2
Preparation of Urban Water Management Plan: Scope of Work
management measures to the extent practicable will be described. The
factors that make a water source inconsistent will be explained. Actions
to remove factors that prevent a consistent water supply and/or
possible water supplies that could replace inconsistent supplies will be
described.
Task 6.3 -Three -Year Minimum Water Supply
An estimate of the minimum water supply available during each of the
next 3 water years based on the driest 3 -year historic sequence for the
City's water supply will be provided.
Task 6.4 -Water Supply Reliability
The reliability and vulnerability of the water supply to seasonal or
climatic shortage will be described. The number of years the water
supply is expected to enter a Stage 1, or greater, water shortage over 20
years will be defined.
Task 6.5 -Water Supply Reliability Comparison
Water supply reliability data will be presented for an average water year,
a single dry water year, and multiple dry water years, based on historical
water supply data.
Task 7. Recycled Water Potential
The plan will include a description of the wastewater collection and
treatment systems in the service area and the potential for use of
recycled water-.
Task 7.1 -Wastewater Generation, Collection, and Treatment
The plan will provide quantification of the current and projected future
amounts of wastewater collected and treated in the service area.
Task 7.2 -Wastewater Disposal and Recycled Water Uses
Recycled water and its potential for use as a water source in the service
area will be addressed. The plan will describe methods of wastewater
disposal in the service area. The plan will also include a description of
the recycled water currently being used in the service area, including the
type, place, and quantity of use. Potential uses of recycled water will be
identified and quantified, including agricultural irrigation, landscape
irrigation, wildlife habitat enhancement, wetlands, industrial reuse,
groundwater recharge and other appropriate uses. The technical and
economic feasibility of serving those uses will be determined based on
information available from the local wastewater agency. The use of
recycled water within the service area will be projected for 5, 10, 15 and
20 years.
Actions that might to be taken to encourage recycled water uses, and
projected results of these actions in terms of acre-feet of recycled water
used per year will be identified and described.
BROWN AND
CA L D W E L L 99767 -003 -Lodi UYVMP Scope ReO.700 doc 3
Preparation of Urban Water Management Plan: Scope of Work
The plan will provide a recycled water use optimization plan that
includes actions to facilitate the installation of dual distribution systems
and promotes recirculating uses.
The work under this task will be based on information and evaluations
available from the local wastewater agency.
Task S. Water Supply and Demand Comparison
The total water supply will be compared to total projected water use.
This water supply and demand comparison will compare the total water
supply sources available with the total projected water use over the next
20 years, in 5 -year increments, for a normal water year, a single dry water
year, and multiple dry water years.
Task 9. Description and Evaluation of Water
Conservation Best Management Practices
This task consists of presenting a description of current water
management activities and an economic evaluation of water
conservation best management practices (BMPs). An economic
evaluation will be conducted only for those BMPs not proposed for
implementation. The following subtasks describe the work for flus task.
Task 9A -Summarize Water Management Accomplishments
Brown and Cald,,yell will sttnllnarize the water management activities
conducted in the system.: Current and recent water man -,gement
programs implemented by the City wilt be documented.
Task 9.2 -Define Water Management Programs
A list of water management practices will be developed. Each water
management practice will be described.
Task 9.3 -Develop Cost Estimates
Cost estimates for each of the water management activities to be
evaluated will be prepared. Costs will be expressed as capital, operations
and maintenance, present worth, and cost per acre-foot of supplied
water.
Task 9.4 -Estimate Water Savings
Water savings from each of the BMPs to be evaluated will be estimated.
Data sources will include the estimates of reliable water savings for Best
Management Practices (BMPs) including the Memorandum of Understanding
Regardiu,g Urban [Pater Consemation in California (1\10U) and data prepared
by others.
Task 9.5 -Prepare Economic Analysis
An economic analysis of conservation measures proposed to not be
implemented will be prepared for the water system. The costs of the
water management program will be summarized. Dollar savings from
reduced water demand will be quantified, including reduced water
BROWN AND
CA L D W E L L 99761.M. -Lw„ U` NIPSc pe Ftev,.700.doe 4
Preparation of Urban Water Management Pian: Scope of Work
system operating costs, capital outlay, and savings in energy to the
customer. A benefit/cost analysis will be prepared. A summary of the
benefit/cost ratio of each water management program alternative will be
provided. Water management programs will be recommended for
implementation.
Task 9.6 -Summary of Water Management Programs Considered
But Not Recommended
Brown and Caldwell will describe programs which were considered but
not recommended. The reasons why these programs were not
recommended trill be discussed.
Task 10. Water Shortage Contingency Plan
An urban water shortage contingency plan will be prepared. Brown and
Caldwell will identify and evaluate actions to be undertaken to prepare
for and implement during a catastrophic interruption of water supplies,
including a regional power outage, an earthquake, or other disaster.
The water shortage contingency analysis will include actions in response
to water supply shortages including up to a 50 -percent reduction in
water supply. Stages of action to be undertaken by the City will be
described, including a description of water supply condition, for each
stage.
lYiandaroty prohibitions against specific water use practices during :Na.er
shortages will be recommended, including use of potable water Fcr
street cleaning. penalties or charges for excessive use will also be
defined.
Appropriate consumption reduction methods will be evaluated for the
service area for their abilitv to achieve a water use reduction consistent
with up to a 50 percent reduction in water supply. Mechanisms for
determining actual water use reductions will be defined.
The effect of these actions and conditions on revenues and expenditures
will be described. Measures to overcome the revenue and expenditure
impacts will be proposed.
Task 11. Water Supply Alternatives
Based on the projected water demands and the characteristics of the
existing water supply for the system, an evaluation of water supply
alternatives to meet the current and projected water demands will be
prepared. This task will include an evaluation of the impacts of current
and pending drinking water regulations on the alternative water supplies
of the system.
Evaluation criteria including economics, reliability, water quality and
environmental factors will be developed. An evaluation matrix will be
prepared comparing the water supply alternatives. The adequacy of the
existing and alternative supply sources to meet future demands and
expected regulations will be summarized. Recommendations for grater
BROWN AND
CA L D W E L L 99761 -003 -Lod, UWMP Scope Rev 1 700 doc s
Preparation of Urban Water Management Plan: Scope of Work
supply which will reliably and economically satisfy the long-term water
needs will be made.
Task 12. Plan Preparation
Task 12.1 -Draft Plan
A draft plan will be prepared for the water system incorporating the
results of the above tasks. Brown and Caldwellwill submit a first and
second draft plan. Five copies of each of the draft reports will be
submitted to the City.
Task 12.2 -Exemption Submittal/Report to California Urban Water
Conservation Council
An exemption submittal for the California Urban Water Conservation
Council will be prepared, if requested by the City, for water
conservation measures that will not be implemented for economic or
other reasons. This task is not included in the fee estimate.
Task 12.3 -Final Plan Document
Based on the results of the public hearings under Task 13, the final plan
will be prepared. Ten copies of the final plan «till be submitted, as welt
as an electronic copy.
Task 13. Public Participation
As required by the Urban Water Management Planning Act and.
subsequent amendments, a public hearing regarding the water
management plan must be conducted. Brown and Caldwell will provide
assistance to the City if requested. This task is not included in the fee
estimate.
Task 14. Meetings
Brown and Caldwell willattend up to three meetings with City staff to
review work progress.
BROWN AND