Loading...
HomeMy WebLinkAboutAgenda Report - May 6, 2020 C-03AGENDA ITEM c-3 Crrv or Loor Couxcrr, CovTMUNICATIoN AGENDA TITLE: MEETING DATE: PREPARED BY: Adopt Resolution Awarding Contract for Wastewater Main Rehabilitation Program (Project No. 8) to lnsituform Technologies, LLC, of Chesterfield, Missouri, ($1,882,322), Authorizing City Manager to Execute Change Orders ($400,000), and Authorizing City Manager to Execute Related Documents May 6, 2020 Public Works Director RECOMMENDED AGTION: Adopt resolution awarding contract for Wastewater Main Rehabilitation Program (Project No. 8) to lnsituform Technologies, LLC, of Chesterfield, Missouri, in the amount of $1 ,882,322, authorizing City Manager to execute change orders in an amount not to exceed $400,000, and authorizing City Manager to execute related documents. BAGKGROUND INFORMATION The Wastewater Main Rehabilitation Program is intended to systematical ly replace and repa i r existi n g wastewater i nfrastructu re that has reached its useful life. This is the eighth project scheduled in this program. ln 2016, the City hired a consultant to perform a wastewater pipeline condition assessment. The assessment included the inspection of the City's larger wastewater pipelines and identified pipe segments in need of repair due to deteriorating pipe conditions. Staff uses the condition assessment results to prioritize rehabilitation of wastewater pipelines. Project No. I focuses on the 24-inch and 30- inch diameter wastewater trunklines within Century Boulevard, from Beckman Road to Church Street, as shown on Exhibit A. Once completed, the project will improve the level of service associated with the wastewater system by increasing reliability, reducing risk of pipeline failures, and decreasing maintenance costs. As with previous phases of the project, staff is again recommending the use of trenchless methods of rehabilitation to minimize both surface disruption and costs. Project No. I includes in-place (trenchless) rehabilitation of approximately 5,400 linear feet of 24-inch and 3O-inch diameter wastewater main (including 100 linear feet of pipeline located under the Union Pacific Railroad), 800 linear feet of 36-inch diameter storm drain line, and the rehabilitation of approximately 19 manholes. While most of the pipelines within the limits of Project No. I are located within the City rightof-way, there are pipeline crossings at the Caltrans's right-of-way (at Highway 99), Union Pacific Railroad right-of-way, and San Joaquin County right-of-way (at Beckman Road). The crossings require agency encroachment permits and/or agreements which either have been obtained by the City, or will be obtained by the contractor, as required by the project specifications. Staff recommends that the City Manager be authorized to execute all encroachment documents required by this project to keep the project schedule. APPROVE \\cvcf¡1v02\pubwks$WVP\PROJ ECTS\SËWER\WastewaterRehabPhaseS\CAward.doc uer, City Manager 4t23t2 Adopt Resolution Awarding Contract for Wastewâter Main Rehabilitation Program (Pro¡ect No. 8) to lns¡tuform Technologies, LLC, of Chesterfield, Missouri, ($1,882,322), Authorizing City Mânager to Execute Changè Orders ($400,000), and Authorizing C¡ty Maneger to Execute Related Documents May 6, 2020 Page 2 The plans and specifications for this project were approved on February 5,2020. The City received the following five bids for this project on April 1,2020: Bidder Engineer's Estimate lnsituform Technologies, LLC Lamassu Utility Services, lnc. K.J. Woods Construction McGuire and Hester Express Sewer & Drain, lnc. *Corrected Amount FUNDING AVAILABLE: Location Chesterfield, MO Benicia San Francisco Sacramento Rancho Cordova Base Bid $2,216,124.00 $1,882,322.00 $2,334,896.32* $2,433,003.30. $2,715,295.00 92,871,740.00 Above/(Below) Engineer's Estimate ($333,802.00) $118,772.32 $216,879.30 $499,171.00 $655,616.00 Staff recommends awarding contract for Wastewater Main Rehabilitation Program (Project No. 8) to lnsituform Technologies, LLC, of Chesterfield, Missouri, in the amount of $1,882,322, authorizing City Manager to execute change orders in an amount not to exceed $400,000, and authorizing City Manager to execute related documents. FISCAL IMPACT:Completing this project will reduce future maintenance costs and increase the performance and reliability of the wastewater system. This project will not impact the General Fund. Budgeted in Fiscal Year 2019120: Wastewater Capital (53 1 99000.77 020) - $2,600, 000 Andrew Keys Andrew Keys Deputy City Manager/lnternal Services Director Charles E. Swimley Jr. Charles E. Swimley, Jr Public Works Director Prepared by Jimi Billigmeier, Associate Civil Engineer CES/JB/tc Attachments cc: Andrew Richle, Utilities Superintendent Trav¡s Kahrs, Water Plant Superintendent K:\WP\PROJ ECTS\SEWER\WastewaterRehebPheseS\CAward.doc 412At2020 # # ### # ## # ## # # # # # # ##Hutchins St.Cherokee Ln.Church St.Stockton St.Century Blvd.Hwy. 992 4In.24In.3 0 I n .2 4 I n .2 4 I n .2 4 I n .2 4 I n .2 4 I n .2 4 I n .2 4 I n . 3 0 I n . 2 4 I n . 2 4 In .30 In. 36 In.24 In. 3 0 In .Exhibit AWastewater Main Rehab ProgramPhase 8 #Re hab Utility Manholes Re hab Wastewater Lines Re hab Storm Drain Lines µ Islamic Cemetery