Loading...
HomeMy WebLinkAboutAgenda Report - April 15, 2020 C-13AGENDA ITEM c-13 CIty op LooI Councrl CoMMUNTcATToN TM AGENDA TITLE: MEETING DATE: PREPARED BY: Adopt Resolution Accepting Vineyard Terrace Subdivision, Unit No. 1, Tract No. 3986, Public lmprovements; Amending Traffic Resolution No. g7-148 by Approving Multi-Way Stop Control at Henri Lane and Berlanda Lane, Two-Way Stop Control on Botticelli way at Henri Lane, Two-way stop control on Pollock way at Henri Lane, and Two-Way Stop Control on Raphael Way at Berlanda Lane April 1 5,2020 Public Works Director RECOMMENDED AGTION: Adopt resolution accepting Vineyard Terrace Subdivision, Unit No. '1, Tract No. 3986, public improvements; amending Traffic Resolution No. 97-148 by approving multi-way stop control at Henri Lane and Berlanda Lane, two-way stop control on BotticelliWay at Henri Lane, two-way stop control on Pollock Way at Henri Lane, and two-way stop control on Raphael Way at Berlanda Lane. BACKGROUND ¡NFORMATION: Vineyard Terrace Subdivision, Unit No. 1, is the first phase of the multi-phase residential development located east of Lower Sacramento Road and north of Century Boulevard, as shown on Exhibit A. Unit No. I consists of 121 single-family, residential lots. The project includes the installation of all interior subdivision public improvements and street widening improvements on Century Boulevard, from Lower Sacramento Road to the project easterly boundary, and on Lower Sacramento Road from Century Boulevard to the project northerly boundary. A total 0.9 mile of new interior City streets is to be accepted with this subdivision. Staff recommends accepting Vineyard Terrace Subdivision, Unit No. 1, Tract No. 3g86, public improvements; amending Traffic Resolution No. 97-148 by approving multi-way stop control at Henri Lane and Berlanda Lane, two-way stop control on Botticelli Way at Henri Lane, two-way stop control on Pollock Way at Henri Lane, and two-way stop control on Raphael Way at Berlanda Lane. FISCAL IMPACT: There will be an increase in long-term maintenance costs for public infrastructure and City services, such as police, fire, and parks. This cost will be partially offset by proceeds from the Community Facilities District No. 2007-1. FUNDINGAVAILABLE: Notapplicable. C O-_QT Charles E. Swimley, Jr Public Works Director Prepared by Lyman Chang City Engineer/Deputy Public Works Director CS/LC/tc Attachment cc: Assistant Engineer Kiriu K. Hovnanian CA Land Holdings, LLC Senior Civil Engineer Nathan Engineer Technician, Mangrich NorthStar Engineering Group, lnc. Senior Engineering Technician Wiman AppROVED: ffi-- Stephen Schwabauer, City Manager KIWP\DEV-SER\ADevelopments\Residential\PETERSON PROPERTY - VINEYARD TERRACE\lmprovement Agreement\Unit 1\CAccept publ¡c improvements_Un¡t1 .doc 41312020