HomeMy WebLinkAboutAgenda Report - April 15, 2020 C-13AGENDA ITEM c-13
CIty op LooI
Councrl CoMMUNTcATToN
TM
AGENDA TITLE:
MEETING DATE:
PREPARED BY:
Adopt Resolution Accepting Vineyard Terrace Subdivision, Unit No. 1, Tract No.
3986, Public lmprovements; Amending Traffic Resolution No. g7-148 by Approving
Multi-Way Stop Control at Henri Lane and Berlanda Lane, Two-Way Stop Control
on Botticelli way at Henri Lane, Two-way stop control on Pollock way at Henri
Lane, and Two-Way Stop Control on Raphael Way at Berlanda Lane
April 1 5,2020
Public Works Director
RECOMMENDED AGTION: Adopt resolution accepting Vineyard Terrace Subdivision, Unit No.
'1, Tract No. 3986, public improvements; amending Traffic
Resolution No. 97-148 by approving multi-way stop control at Henri
Lane and Berlanda Lane, two-way stop control on BotticelliWay at Henri Lane, two-way stop control on
Pollock Way at Henri Lane, and two-way stop control on Raphael Way at Berlanda Lane.
BACKGROUND ¡NFORMATION: Vineyard Terrace Subdivision, Unit No. 1, is the first phase of the
multi-phase residential development located east of Lower
Sacramento Road and north of Century Boulevard, as shown on
Exhibit A. Unit No. I consists of 121 single-family, residential lots.
The project includes the installation of all interior subdivision public improvements and street widening
improvements on Century Boulevard, from Lower Sacramento Road to the project easterly boundary,
and on Lower Sacramento Road from Century Boulevard to the project northerly boundary.
A total 0.9 mile of new interior City streets is to be accepted with this subdivision.
Staff recommends accepting Vineyard Terrace Subdivision, Unit No. 1, Tract No. 3g86, public
improvements; amending Traffic Resolution No. 97-148 by approving multi-way stop control at Henri
Lane and Berlanda Lane, two-way stop control on Botticelli Way at Henri Lane, two-way stop control on
Pollock Way at Henri Lane, and two-way stop control on Raphael Way at Berlanda Lane.
FISCAL IMPACT: There will be an increase in long-term maintenance costs for public
infrastructure and City services, such as police, fire, and parks. This cost
will be partially offset by proceeds from the Community Facilities District
No. 2007-1.
FUNDINGAVAILABLE: Notapplicable.
C O-_QT
Charles E. Swimley, Jr
Public Works Director
Prepared by Lyman Chang City Engineer/Deputy Public Works Director
CS/LC/tc
Attachment
cc: Assistant Engineer Kiriu
K. Hovnanian CA Land Holdings, LLC
Senior Civil Engineer Nathan
Engineer Technician, Mangrich
NorthStar Engineering Group, lnc.
Senior Engineering Technician Wiman
AppROVED: ffi--
Stephen Schwabauer, City Manager
KIWP\DEV-SER\ADevelopments\Residential\PETERSON PROPERTY - VINEYARD TERRACE\lmprovement Agreement\Unit 1\CAccept publ¡c
improvements_Un¡t1 .doc 41312020