Loading...
HomeMy WebLinkAboutAgenda Report - April 15, 2020 C-04c-4AGENDA ITEM Crry op LopI Couuctt CotvrMUNrcATIoN AGENDA TITLE Adopt Resolution Awarding Contract for Citywide Bicycle Facilities Detection lmprovement Project to St. Francis Electric, LLC, of San Leandro (9740,795), Authorizing City Manager to Execute Change Orders ($60,000), and Appropriating Funds ($212,400) MEETING DATE PREPARED BY: April 1 5,2020 Public Works Director RECOMMENDED ACTION: Adopt resolution awarding contract for Citywide Bicycle Facilities Detection lmprovement Project to St. Francis Electric, LLC, of San Leandro, in the amount of $740,795, authorizing City Manager to execute change orders in an amount not to exceed $60,000, and appropriating funds in the amount of $212,400. BACKGROUND INFORMATION: On January 15, 2020, Council approved plans and specifications and authorized advertisement for bids for Citywide Bicycle Facilities Detection lmprovement Project. The project includes installing 13 bike/traffic video detection systems on existing traffic signals, painting 20,300 square feet of green bike lanes, and other incidentaland related work. The City received the following four bids on February 19,2020 Above/(Below) Engineer's Estimate TM Bidder Engineers Estimate St Francis Electric LLC. Pacific Excavation, lnc. Power Design Electric, lnc. Bear Electrical Solutions, lnc Location San Leandro Elk Grove Kingsburg Alviso Bid $468,090 $740,795 $798,25e $1 ,136,437 $1 ,176,965 $272,705 $330,1 69 $668,347 $708,775 The bids received are substantially higher than the engineer's estimate and exceeded the funding available from the Active Transportation Program grant, which is $447,000, and the budgeted local funding match of $118,000. Staff examined the bid results and determined that there would be a substantial savings if the green bike lanes can be modified to a different configuration, which was used by the state of Hawaii and the City of Los Angeles (Exhibit A). lnstead of painting the entire bike lane green, a green paint stripe is installed adjacent to the white bike lane stripe to make the contrast. The proposed green bike stripes delineate the bike lane facilities and substantially reduce the installation cost and future maintenance cost. Staff recommends using reflective thermos-plastic for the green bike stripe, which has expected life of more than five years and is expected to outlast the originally proposed textured green paint which has an expected life of only two years. The expected project saving will be approximately $82,000. Staff will implement the change as a deductive change order after the contract is executed. St. Francis Electric, LLC is supportive of the proposed deduction. AppRovED, ffi Stephen Schwabauer, City Manager K:\WP\PROJECTS\STREETS\Citywide Bike Detection \CAward.com 41612020 Adopt Resolution Awarding Conlract for Citywide Bicycle Facilities Detection lmprovement Project to St. Francis Electric, LLC, of San Leandro ($740,79s), Author¡z¡ng City lVìanager to Execute Change Orders ($60,000), and Appropriating Funds (g212,400) April 15,2020 Page 2 The California Transportation Commission and San Joaquin Council of Governments concurred with the proposed design changes to save costs and move this project fon¡¡ard. The contract is estimated to be $658,840 with the green bike stripe change. The total project cost includes inspection and project contingencies and is estimated to be $777,400. Staff recommends awarding contract for Citywide Bicycle Facilities Detection lmprovement Project to St. Francis Electric, LLC, of San Leandro, in the amount of $740,795, authorizing City Manager to execute change orders in an amount not to exceed $60,000, and appropriating funds in the amount of $212,400. FISCAL IMPACT:There will be an increase in future maintenance cost to maintain the new green bicycle striping. FUNDING AVAILABLE:Fiscal Year 2019/20 Budget: Active Transportation Prog ram G rant (30999000. 77 020) TDA Streets (30599000.77 020): Requested Appropriation : TDA Streets (30599000.77 02A) Street Fund (30099000.77020) TOTAL $447,000 $1 18,000 $ 2,000 $210,400 $777,400 l-, '&t, r,- L Andrew Keys (Apr 8,202V Andrew Keys Deputy City M a na ger/l nternal Services Director Charles E. Swimley, Jr Public Works Director cc: Prepared by Sean Nathan, Senior Civil Engineer CES/SN/tc Attachment Senior Civil Engineer, Nathan Engineering Technician, Mangrich Public Works Management Analyst lnterwest Consultant David Ripperda, SJCOG St Francis Electric LLC K:\WP\PROJECTS\STREETS\Citywide Bike Detection \CAward.com 41612020 EXHIBIT A #38Section IProject LengthNormalSection IIExpenditure Prior Years FY 18/19 BudgetFY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 TotalContracts6,009$ 6,009$ Contracts 740,795$ 740,795$ Internal Staff20,000$ 20,000$ Miscellaneous16,605$ 16,605$ Total Capital Costs -$ -$ 783,409$ -$ -$ -$ -$ 783,409$ Section IIIFunding Source(s) Prior Years FY 18/19 BudgetFY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 Total309 - State Bike Lane Fund447,000$ 447,000$ 300 - Street Fund 210,400$ 210,400$ 305 - TDA - Streets126,009$ 126,009$ Total Project Financing-$ -$ 783,409$ -$ -$ -$ -$ 783,409$ Section IVOperating Cost or (savings) Prior Years FY 18/19 BudgetFY19/20 FY20/21 FY21/22 FY22/23 FY23/24 TotalPersonnel-$ Other Operating Costs-$ Total Operating Impact-$ -$ -$ -$ -$ -$ -$ -$ Funding Sources/Methods of FinancingOperating Budget ImpactCapital Improvement Program2019 ‐ 2020Project design consultant contract at $60,000. Part of the project funding is from a State ATP (Active Transportation Program) grant. Of the $571,008.75 total, $6,008.75(Design.ExtLabor) was carried forward; $447,000(Contracts.State Bike) and $108,000(Contracts.TDA ST) and $10,000(IntLabor) were FY19/20 budgeted.Additional InformationA bike detection is a highly requested bicycle traffic improvement and will encourage more bicyclists to ride in the City.Justification/factor driving projectDescription07/19 to 06/20This project will install bicycle detection at thirteen signalized intersections to minimize bicycle collisions and encourage more bicyclists to use the bicycle facilities within the City.Project Title:Estimated Project CostsCitywide Bike Detection Improvement ProjectPWST‐0050 RESOLUTION NO. 2020-64 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING CONTRACT FOR CITYWIDE BICYCLE FACILITIES DETECTION IMPROVEMENT PROJECT TO ST. FRANCIS ELECTRIC, LLC, OF SAN LEANDRO; AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDERS; AND FURTHER APPROPRIATING FUNDS WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on February 19, 2020, at 1 1:00 a.m., for Well27 Granular Activated Carbon Filter System, described in the plans and specifications therefore approved by the City Council on January 15,202Q and WHEREAS, said bids have been checked and tabulated and a report thereof filed with the City Manager as follows: Bidder Engineers Estimate St Francis Electric LLC. Pacific Excavation, lnc. Power Design Electric, lnc. Bear Electrical Solutions, lnc. Location San Leandro Elk Grove Kingsburg Alviso B¡d $468,090 $740,795 $798,259 $1,136,437 $1 ,176,865 Above/(Below) Engineer's Estimate $272,705 $330,1 69 $668,347 $708,775 WHEREAS, staff recommends that the City Council award the contract for Citywide Bicycle Facilities Detection lmprovement Project to St. Francis Electric, LLC, of San Leandro, in the amount of $740,795; and WHEREAS, staff also recommends that the City Council authorize the City Manager to execute change orders in an amount not to exceed $60,000; and WHEREAS, staff further recommends the City Council appropriate funds in the amount of $2,000, from the fund balance of TDA Streets (30599000.77020) and $210,400 from the fund balance of Street Fund (30099000.77020) for Fiscal Year 2019t20. NOW, THEREFORE, BE lT RESOLVED that the Lodi City Council does hereby award the contract for Citywide Bicycle Facilities Detection lmprovement Project to St. Francis Electric, LLC, of San Leandro, California, in the amount of $740,795; and BE lT FURTHER RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute the contract and change orders in an amount not to exceed $60,000; and BE lT FURTHER RESOLVED that the Lodi City Council does hereby authorize an appropriation for Citywide Bicycle Facilities Detection lmprovement Project, in the amount oÍ $212,400, as set forth above; and BE lT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (adopted 1116119, Resolution No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above-referenced document(s) that do not alter the compensation or term, and to make clerical corrections as necessary. Dated: April 1 5,2020 I hereby certify that Resolution No. 2020-64 was passed and adopted by the City Council of the City of Lodi in a regular meeting held April 15,2020 by the following vote: AYES: COUNCIL MEMBERS - Chandler, Mounce, Nakanishi, and Mayor Kuehne NOES: COUNCIL MEMBERS - None ABSENT: COUNCIL MEMBERS - None ABSTAIN: COUNCIL MEMBERS - None PAMELA M. FARRIS Assistant City Clerk 2020-64