HomeMy WebLinkAboutAgenda Report - April 15, 2020 C-03AGENDA ITEM
Crty op LopI
Councrl ConrMUNrcATroN
AGENDA TITLE:Adopt Resolution Authorizing City Manager to Waive Bid Process and Purchase
One Vaughan Horizontal Chopper Pump for White Slough Water Pollution
Control Facilityfrom Rockwell Engineering and Equipment, Co., of Tustin Ranch
($25,536)
MEETING DATE
PREPARED BY:
April 1 5,2020
Public Works Director
RECOMMENDED AGTION: Adopt resolution authorizing City Manager to waive bid process
and purchase one Vaughan horizontal chopper pump for White
Slough Water Pollution Control Facility from Rockwell
Engineering and Equipment, Co., of Tustin Ranch, in the amount of $25,530.
BAGKGROUND INFORMATION: The existing pump that lifts wastewater from the City's industrial
waste system was installed in 2007. This obsolete pump has
become unreliable and is no longer suitable for this application.
New pump technology is available (and currently utilized in other areas of the treatment plant)that will
minimize maintenance and operate more efficiently. White Slough Pollution Control Facility currently
operates and maintains five Vaughn chopper pumps with minimal problems. The purchase of a
Vaughn horizontal chopper pump would replace the existing ITT Flyght Centrifugal Pump.
Rockwell Engineering and Equipment, Co. is a sole-source vendor. Per Lodi Municipal Code, Section
3.20.070, Bidding, the bidding process may be dispensed when the commodity can be obtained from
only one vendor, due to need for branded replacement parts or supplies for equipment of like brand.
Staff recommends authorizing City Manager to waive bid process and purchase one Vaughan
horizontal chopper pump for White Slough Water Pollution Control Facility from Rockwell
Engineering and Equipment, Co., of Tustin Ranch, in the amount of 92b,536.
FISCAL IMPAGT: This purchase does not impact the General Fund.
FUNDINGAVAILABLE: WSWPCFPlantOperations(53053003.77030)-$ZS,Sg6
(LL.,L
Aôdrew Keys (Apr 8,rútol
Andrew Keys
Deputy City Ma na ger/l nternal Services D i rector
c-3
TM
Cha E ey, Jr
Public Works Director
Prepared by Lance Roberts, Utilities Manager
CES/LR/tw
Attachments
AppRovED, ffi#t*,-,r'
Stephen Schwabauer, City Manager
RIGROUP\ADlvllN\Council\2020\04152020\Rockwell Engineering\Rockwell CC.doc 41312020
®
ROCKWELL
ENGINEERING A ND EQU IPMENT C O .
TUSTIN , CA 92782
CUSTOMER
CITY O F LODI
P.O. BOX 3006
LODI, C A 95241-1910
ITEM DESCRIPTION
HE8N10CS VAUGHAN HORIZONTAL CHOPPER PUMP
-MOTOR STOOL
-MOTOR COUPLING
-1 5 HP 890 RPM PREM EFF . MOTOR
-REUSING EXISTING BASE
SHIPPING SHIPPING CHARGES
LEAD TIME : 5-6 WEEKS
PUMP QUOTE
QUOTE DATE
QUOTE#
QUOTED BY
2/3/2020
38306
BR
TERMS
NET-30DAYS
MANUFACTURER
VAUGHAN
QUANTITY COST Total
1 22 ,850 .00 22 ,850 .00T
1 800.00 800.00
-SALES TAX -SAN JOAQUIN CNTY (City of Lodi ) 8.25% 1,885.13
PHONE (714) 505-9700
FAX (714) 505-9800
www.rockwellengineering.com
TOTAL $25 ,535 .13
Credit card payments are only accepted prior to
or at time of shipment.
January 30, 2020
Nathan Shropshire
W.S.W .P.C.F Maintenance Supervisor
City of Lodi
12751 N. Thornton Rd
Lodi, CA 95240
Dear Nathan,
Chopper Triton ·
The appointed Vaughan Company Inc . Representative and sole source for
the City of Lodi, CA including sales , service and parts is Rockwell
Engineering. Please contact them for pricing, information or any other
assistance you require.
Sincerely,
Rockwell Engineering & Equipment
2913 El Camino Real
Ste 337
Tustin, CA 92782
Phone:714-505-9700
Fax: 714 -505 -9800
E-mail : brad@rockwellengineering.com
Stefanie Vaughan
Vaughan Company, Inc .
Phone: 360.249.4042 ext. 227
Rotamix
Vaughan Company , lnc .l364 Monte Elma Road 1 Montesano , WA 98563 USA 1 Phone : 360 -249 -40421 Fax : 360 -249-6155
E-Ma il : i nfo @chopperpumps .com I Website : www.chopperpumps .com
RESOLUTION NO. 2020-63
A RESOLUTION OF THE LODI CITY COUNCIL
AUTHORIZING PURCHASE OF VAUGHAN HORIZONTAL
CHOPPER PUMP FOR WHITE SLOUGH WATER
POLLUTION CONTROL FACILITY FROM ROCKWELL
ENGINEERING AND EQUIPMENT CO., OF TUSTIN RANCH
WHEREAS, the existing pump that lifts wastewater from the City's industrial waste
system was installed in 2007; and
WHEREAS, new pump technology is available (and currently utilized in other areas of
the treatment plant) that will minimize maintenance and operate more efficiently; and
WHEREAS, per Lodi Municipal Code 53.20.070, bidding process may be dispensed
when the commodity can be obtained from only one vendor, due to need for branded
replacement parts or supplies for equipment of like brand; and
WHEREAS, staff recommends authorizing the City Manager to waive bid process and
purchase one Vaughan horizontal chopper pump for White Slough Water Pollution Control
Facility from Rockwell Engineering and Equipment Co., of Tustin Ranch, in the amount of
$25,536.
NOW, THEREFORE, BE lT RESOLVED that the Lodi City Council does hereby
authorize the City Manager to waive the bidding process per Lodi Municipal Code
Section 3.20.070; and
BE lT FURTHER RESOLVED that the Lodi City Council does hereby authorize the
purchase of one Vaughan horizontal chopper pump for White Slough Water Pollution Control
Facility from Rockwell Engineering and Equipment Co., of Tustin Ranch, California, in the
amount of $25,536; and
BE lT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol
Manual (Res. No. 2019-223), the City Attorney is hereby authorized to make minor revisions to
the above-referenced document(s) that do not alter the compensation or term, and to make
clerical corrections as necessary.
Dated: April 15,2020
I hereby certify that Resolution No. 2020-63 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held April 15,2020, by the following vote:
AYES: COUNCIL MEMBERS - Chandler, Mounce, Nakanishi, and Mayor Kuehne
NOES: COUNCIL MEMBERS - None
ABSENT: COUNCIL MEMBERS - None
ABSTAIN: COUNCIL MEMBERS - None
PAMELA M. FARRIS
Assistant City Clerk
2020-63