Loading...
HomeMy WebLinkAboutAgenda Report - March 18, 2020 C-04AGENDA ITEM Crrv or Lonr CouNcrr-, CovTMUNICATToN IM AGENDA TITLE:Approve Plans and Specifications and Authorize Advertisement for Bids for the Lodi Electric Utility Facility Renovation Project, and Adopt Resolution Authorizing the City Manager to Execute Agreements with Mobile Modular Management Corporation, of Livermore ($1 81,422), and WMB Architects, lnc., of Stockton ($65,ooo) MEETING DATE: March 18,2020 PREPARED BY: Public Works Director & Electric Utility Director RECOMMENDED AGTION: Approve plans and specifications and authorize advertisement for bids for the Lodi Electric Utility Facility Renovation Project, and adopt resolution authorizing the City Manager to execute agreements with Mobile Modular Management Corporation, of Livermore ($tAt ,422), and WMB Architects, lnc., of Stockton ($65,000). BACKGROUND INFORMATION: The Lodi Electric Utility (LEU) currently occupies and utilizes multiple buildings and facilities located at 1331 S. Ham Lane, a yard shared by both the Public Works and LEU for several years. Construction of these buildings and facilities dates back to the mid-1970s. With the exception of a recent upgrade project to LEU's Operations Dispatch Center to address ergonomic and accessibility issues, the current LEU facilities have gone without any major improvements for the past 40+ years. WMB Architects, lnc. was hired in 2Q17 lo assess and provide preliminary design services for the improvements associated with accessibility, ergonomics, and security at LEU's facilities. At the September 19,2018 meeting, the City Council approved a contract with WMB Architects, lnc. to complete the final engineering and design and develop specifications in preparation to solicit bids for construction of the project. Design work is complete and plans have been submitted to the Building Department for review. The project will include offices, public lobbies, public counters, Americans with Disabilities Act (ADA) access, ADA staff bathroom facilities, new accessible locker rooms, an enlarged training room, lighting, communications, space conditioning, and associated staff support areas. The project also includes a transformer storage building and a covered wire reel storage structure. Prior to beginning construction of the project, the current area to be renovated must be vacated by staff. To accommodate statf and enable their work to continue during the project, temporary office and restroom facilities are needed. These facilities will be located adjacent to the current LEU Administration Office. A. Mobile Modular Management Corporation: The Professional Services Agreement with Mobile Modular Management Corporation, of Livermore, will provide temporary work space for LEU staff during the renovation project. This space includes offices, APPROVED S c-4 K:\WP\PROJECTS\MISC\Electric Utility\EUD Remodel 2020\C APCS D 2020 Remodel.doc , City Manager 316t2020 Approve Plans and Specifications and Authorize Advertisement for Bids for the Lodi Electric Utility Facility Renovation Project, and Adopt Resolut¡on Authorizing the City Manager to Execute Agreements with Mobile Modular Management Corporation, of Livermore ($181,422), and WMB Architects, lnc., of Stockton ($65,000) March 18.2020 Page 2 common areas, and a break room. Restroom and shower facilities are also required and will be provided in a separate unit. Four 12-foot by 60-foot modular units will be combined to create the work areas for staff and one 12-foot by 56-foot unit will provide restroom and shower facilities. Administrative and management staff will remain in the current location outside the construction project area. The Agreement includes delivery, set-up, ADA access ramps, tear down and removal, as well as, 12 months'rent for allfacilities ($181 ,422). lt is anticipated that utility services, electrical, phone, data, water and sewer, will be completed by City staff. B. WMB Architects, lnc: Amendment No. 1 to the existing Professional Services Agreement with WMB Architects, lnc., of Stockton, will provide design work not originally accounted for as it relates to the transformer storage building and covered wire reel storage area ($65,000). FISCAL IMPACT:This project will reduce costs associated with unplanned and emergency maintenance and repair work for these deteriorating facilities; and ADA and security improvements will increase safety and reduce risk of injury for employees and the public. The addition of covered storage will extend the life of inventory and assets and reduce the risk of damage. This project will not impact the General Fund. FUNDING AVAILABLE: LEU Capital Fund 501 (Project No. EUCP-17001) - 9246,422 Andrew Keys Deputy City Manager/lnternal Services Director Charles E. Swimley, Jr Public Works Director CES/CES/tc Attachments cc:Melissa Price, Rates & Resources Manager Gary Wiman, Construction Project Manager Mobile Modular Management Corporation WMB Architects, lnc. tmer Utility Director K:\WP\PROJEGTS\MISC\Electric Utility\EUD Remodel 2020\C APCS EUD 2O2O Remodel.doc 31612020 RESOLUTION NO. 2O2O-51 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE CITY MANAGER TO EXECUTE AGREEMENTS FOR THE LODI ELECTRIC UTILITY FACILITY RENOVATION PROJECT WITH MOBILE MODULAR MANAGEMENT CORPORATION, OF LIVERMORE, AND WMB ARCHITECTS, INC., OF STOCKTON WHEREAS, the Lodi Electric Utility (LEU) currently occupies and utilizes multiple buildings and facilities located at 1331 South Ham Lane, a yard shared by both the Public Works and LEU for several years; and WHEREAS, at the September 19, 2018 meeting, the City Council approved a contract with WMB Architects, lnc., to complete the final engineering and design, and develop specifications in preparation to solicit bids for construction of the project; and WHEREAS, the project will include offices, public lobbies, public counters, Americans with Disabilities Act (ADA) access, ADA staff bathroom facilities, new accessible locker rooms, an enlarged training room, lighting, communications, space conditioning, and associated staff support areas, as well as a transformer storage building and a covered wire reel storage structure; and WHEREAS, to accommodate staff and enable their work to continue during the project, temporary office and restroom facilities are needed and will be located adjacent to the current LEU Administration Office; and WHEREAS, staff recommends that the City Council authorize the City Manager to execute a Professional Services Agreement with Mobile Modular Management Corporation, of Livermore, in the amount of $181 ,422, îor the Lodi Electric Utility Facility Renovation Project providing temporary work space for LEU staff during the renovation project; and WHEREAS, staff further recommends that the City Council authorize the City Managerto execute Amendment No. 1 to the existing Professional Services Agreement with WMB Architects, lnc., of Stockton, in an amount not to exceed $65,000, for the Lodi Electric Utility Facility Renovation Project, providing design work not originally accounted for relating to the transformer storage building and covered wire reel storage area. NOW, THEREFORE, BE lT RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute a Professional Services Agreement with Mobile Modular Management Corporation, of Livermore, in the amount of $181 ,422, for the Lodi Electric Utility Facility Renovation Project providing temporary work space for LEU staff during the renovation project; and BE lT FURTHER RESOLVED that the City Council does hereby authorize the City Manager to execute Amendment No. 1 to the existing Professional Services Agreement with WMB Architects, lnc., of Stockton, in an amount not to exceed $65,000, for the Lodi Electric Utility Facility Renovatlon Project, providing design work not originally accounted for relating to the transformer storage building and covered wire reel storage area; and BE lT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (Res. No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above-referenced document(s) that do not alter the compensation or term, and to make clerical corrections as necessary. Dated: March 18,2020 I hereby certify that Resolution No. 2020-51 was passed and adopted by the City Council of the City of Lodi in a regular meeting held March 18,2020, by the following vote: AYES: COUNCIL MEMBERS - Chandler, Mounce, Nakanishi, and Mayor Kuehne NOES: COUNCIL MEMBERS - None ABSENT: COUNCIL MEMBERS - None ABSTAIN: COUNCIL MEMBERS - None crn. PAMELA M. FARRIS Assistant City Clerk 2020-51