Loading...
HomeMy WebLinkAboutAgenda Report - March 4, 2020 C-04AGENDA ITEM '• CITY OF LODI COUNCIL COMMUNICATION • TM C-4 AGENDA TITLE: Adopt Resolution Awarding Contract for Municipal Services Center Security Fence Improvement Project to Martin General Engineering, Inc., of Rancho Cordova i ($154,900), Authorizing City Manager to Execute Change Orders ($15,100), and Appropriating Funds ($130,225) MEETING DATE: PREPARED BY: March 4, 2020 Public Works Director RECOMMENDED ACTION: Adopt resolution awarding contract for Municipal Services Center Security Fence Improvement Project to Martin General Engineering, Inc., of Rancho Cordova, in the amount of $154,900, authorizing City Manager to execute change orders in an amount not to exceed $15,100, and appropriating funds in the amount of $130,225. BACKGROUND INFORMATION This project includes replacing roughly 330 feet of security fencing, a pedestrian gate, and an updated automated vehicular gate, at the Municipal Services Center (MSC), located at 1331 South Ham Lane. The existing fence is chain link and does not provide the security needed to meet today's requirements. The proposed fence is eight -foot high wrought iron fencing with pickets at the top and replicates the security fence design recently constructed at the Transit Center and Surface Water Treatment Facility, which has proven to be secure and functional. Plans and specifications for this project were approved on January 15, 2020. The City received the following seven bids for this project on February 12, 2020: KAMTROJECTS\MISC\MSC Fence Improvements\Council 2/20/2020 Above/(Below) Bidder Location Bid Engineer's Estimate Engineer's Estimate $ 210,000 Martin General Engineering Rancho Cordova $ 154,900 ($55,100) Arrow Fencing Redwood Valley $ 155,070 ($54,930) A.M. Stephens Const. Co. Lodi $ 159,667 ($50,333) Diede Construction, Inc. Woodbridge $ 181,690 ($28,310) Golden Bay Fence Plus Iron Works Stockton $ 198,208 ($11,792) Pisor Fence Division Citrus Heights $ 199,980 ($10,020) * Ashron Const. & Restoration Galt $ 240,500 $ 30,500 *Non-responsive FISCAL IMPACT: This project will minimize the ongoing maintenance costs to the chain link gate and will reduce the likelihood of equipment stored in the yard from being stolen. This project will not impact the General Fund. KAMTROJECTS\MISC\MSC Fence Improvements\Council 2/20/2020 Adopt Resolution Awarding Contract for Municipal Services Center Security Fence Improvement Project to Martin General Engineering, Inc., of Rancho Cordova ($154,900), Authorizing City Manager to Execute Change Orders ($15,100), and Appropriating Funds ($130,225) March 4, 2020 Page 2 FUNDING AVAILABLE: Fiscal Year 2019/20 Budget: Transit Capital (60199000.77020) $ 39,775 Requested Appropriation: Water Capital (56199000.77020) $ 90,450* Wastewater Capital (53199000.77020) 39,775 TOTAL: $ 170,000 Requested Transfer to Water Capital: Electric Utility Department (50199000.76220) $ 50,675 *after transfer is completed Water Capital Fund will contribute $39,775 towards Project �U Andrew Keys Deputy City Manager/Internal Services Director CiiakL? Charles E. Swimley, r. Public Works Director Prepared by Sean Nathan, Senior Civil Engineer CES/SN/tc Attachment Cc: Utilities Superintendent K:\WP\PROJECTS\MISC\MSC Fence Improvements\Council Communications\CAward.doc 2/20/2020 MSC SECURITY FENCE IMPROVEMENTS 1331 S. HAM LN CONTRACT CITY OF LODI, CALIFORNIA THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," and MARTIN GENERAL ENGINEERING, INC., a California corporation, herein referred to as the "Contractor." WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders General Provisions Special Provisions Bid Proposal Contract Contract Bonds Plans The July 1992 Edition, Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the 4.1 02/13/20 general prevailing wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: Perform the work necessary to install wrought iron security fencing, automated sliding gate, gate control systems and a pedestrian swing gate to secure the Municipal Services Center (MSC). The work also includes installing a concrete accessible path, curb, and other incidental and related work, all as shown on the plans and specifications for the above project. See Section 6-07 "Description of Bid Items" for additional information. BID ITEMS Ite Description m QTY I Unit I Unit Price I Total Mobilization, Temporary Facilities and 1 LS $6,500.00 $6,500.00 Demobilization f Demolition, Clearing and Grubbing �— 1 LS $13,300.00 $13,300.00 LF $46,200.00 Install Security Fence 330 $140.00 LS $10,900.00 Pedestrian Gate Installation and 1 Improvements _ $10,900.00 Install 28' Vehicular Gate and 1 LS $78,000.00 Improvements $78,000.00 TOTAL BID $154,900.00 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal 4.2 02/13/20 of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15 calendar days after the City Manager has executed the contract and to diligently prosecute to completion within 60 CALENDAR DAYS. ARTICLE IX - State of California Senate Bill 854 requires the following • No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. • No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. • This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. 4.3 02113/20 IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: CITY OF LODI, a municipal corporation By: Title STEPHEN SCHWABAUER City Manager Date: Attest: PAMELA M. FARRIS Assistant City Clerk (CORPORATE SEAL) Approved As To Form: JANICE D. MAGDiCH ` City Attorney 4.4 02/13/20 Capital Improvement Program 2019-2020 Project Title: Transit Facility Upgrades - Misc. PWTR-20003 #80 Section I Description Project Length 07/19 to 06/20 High Miscellaneous repairs and purchases to maintain transit facilities in a state of good repair. Justification/factor driving project As the transit -funded facilities such as the Parking Structure and Transit Station continue to age, repairs and miscellaneous purchases are becoming more frequent and costly each year. This project will provide a funding source for those unexpected, but necessary repairs or replacements. Additional Information Transit capital fund - TDA expenditure Section II Estimated Project Costs Expenditure Prior Years FY 18119 FY 19120 FY 20121 FY 21122 FY 22123 FY 23124 Total Budget Miscellaneous V $ 261,225 $ 261,225 Contracts $ 166,500 Internal Staff • $ 2,500 $ 2,500 Total Capital Costs $ - $ - $ 430,225 $ - ts - $ - $ - $ 263,725 Section III Funding Sources/Methods of Financing Funding Source(s) Prior Years FY 18119 Budget FY 19120 FY 20121 F721/22 FY 22123 FY 23124 Total 601 - Transit - Capital V $ 300,000 $ 300,000 531 - Wastewater Capital Outlay $ 39,775 561 -Water Capital Outlay V $ 90,450 $ 90,450 Total Project Financing $ - $ - $ 430,225 $ - $ - $ - $ - $ 390,450 Section IV Operating Budget Impact Operating Cost or (savings) Prior Years FY 18119 FY19120 FY20121 FY21122 FY22123 FY23124 Total Budget Personnel V $ - Other Operating Costs V $ - Total Operating Impact $ - $ - $ - $ - $ - $ - $ - $ - RESOLUTION NO. 2020-35 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE CONTRACT FOR THE MUNICIPAL SERVICES CENTER SECURITY FENCE IMPROVEMENT PROJECT TO MARTIN GENERAL ENGINEERING, INC., OF RANCHO CORDOVA; AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDERS; AND FURTHER APPROPRIATING FUNDS WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on February 12, 2020, at 11:00 a.m., for the Municipal Services Center Security Fence Improvement Project, described in the plans and specifications therefore approved by the City Council on January 15, 2020; and WHEREAS, said bids have been checked and tabulated and a report thereof filed with the City Manager as follows: Bidder Location Estimate ($54,930) Martin General Engineering Rancho Cordova Arrow Fencing Redwood Valley A.M. Stephens Const. Co. Lodi Diede Construction, Inc. Woodbridge Golden Bay Fence Plus Iron Works Stockton Pisor Fence Division Citrus Heights *Ashron Const. & Restoration Galt *Non-responsive Above/(Below) Bid Engineer's $ 154,900 ($55,100) $ 155,070 ($54,930) $ 159,667 ($50,333) $ 181,690 ($28,310) $ 198,208 ($11,792) $ 199,980 ($10,020) $240,500 $30,500 WHEREAS, staff recommends that the City Council award the contract for the Municipal Services Center Security Fence Improvement Project to Martin General Engineering, Inc., of Rancho Cordova, in the amount of $154,900; and WHEREAS, staff also recommends that the City Council authorize the City Manager to execute change orders in an amount not to exceed $15,100; and WHEREAS, staff recommends transferring funds in the amount of $50,675 from Electric Utility (50199000.76020) to Water (56100000.50001); and WHEREAS, staff also recommends the City Council appropriate funds in the amount of $90,450 from the fund balance of Water Capital (56199000.77020) and $39,775 from the fund balance of Wastewater Capital (53199000.77020) for Fiscal Year 2019/20. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the contract for the Municipal Services Center Security Fence Improvement Project to Martin General Engineering, Inc., of Rancho Cordova, California, in the amount of $154,900; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute the contract and change orders in an amount not to exceed $15,100; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby transfer funds in the amount of $50,675 from Electric Utility (50199000.76020) to Water (56100000.50001); and BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize an appropriation for Municipal Services Center Security Fence Improvement Project, in the amount of $130,225, as set forth above; and BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (adopted 11/6/19, Resolution No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above -referenced document(s) that do not alter the compensation or term, and to make clerical corrections as necessary. Dated: March 4, 2020 I hereby certify that Resolution No. 2020-35 was passed and adopted by the City Council of the City of Lodi in a regular/special joint meeting held on March 4, 2020 by the following vote: AYES: COUNCIL MEMBERS — Chandler, Mounce, Nakanishi, and Mayor Kuehne NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None PAMELA M. FARRIS Assistant City Clerk 2020-35