HomeMy WebLinkAboutAgenda Report - February 5, 2020 C-12AGENDA ITEM (fw,12 WrCITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Accepting Improvements Under Contract for Lockeford Street Improvement Project and Adopt Resolution Amending Traffic Resolution No. 97-148, by Removing Multi - Way Stop Control at Lockeford Street and Stockton Street MEETING DATE: February 5, 2020 PREPARED BY: Public Works Director RECOMMENDED ACTION: Accept improvements under contract for Lockeford Street Improvement Project and adopt resolution amending Traffic Resolution No. 97-148, by removing multi -way stop control at Lockeford Street and Stockton Street. BACKGROUND INFORMATION: This project consisted of reconstructing East Lockeford Street from the Union Pacific Railroad (UPRR) tracks to Cherokee Lane. The project provided for bike lanes, a two-way left turn lane, a traffic signal at Stockton Street (replacing a four-way stop), sidewalk along both sides of the street, and improved lighting. The project also removed the railroad crossing "humps" in Stockton Street and Washington Street, replaced the 70 -year old water main in Lockeford Street, and replaced the lighted crosswalk at Calaveras with a rectangular rapid flashing beacon (to be consistent with our other installations). The contract was awarded to George Reed, Inc., of Modesto, in the amount of $2,831,439. All work was completed in substantial conformance with the plans and specifications approved by City Council and prior to the contract completion date. The final contract amount was $2,993.469. The difference between the contract amount and the final amount was primarily due to unknown utilities encountered during construction, a City change in pedestrian crossing equipment, accommodating special City requests related to the Grape Festival, and minor increases in actual quantities installed. Before and after photos are shown in Exhibit A. Change Order No. 1 ($35,368.29) included additional costs associated with modifications to five storm drains and three wastewater manholes, new signal conduit at Cherokee Lane, and miscellaneous traffic control and irrigation modifications. Change Order No. 2 ($30,444.01) included additional, City requested, grading work, temporary street lighting and striping to prepare for Grape Festival opening, and changes to the pedestrian crossing lighting system. Change Order No. 3 ($49,374.61) included City authorized contractor overtime to expedite work to accommodate the Grape Festival opening and modifications to certain unknown underground utilities conditions. The remaining cost difference of $46,843 results from bid unit quantity adjustments identified during construction. APPROVED: 1&a0heWScFlw2Wuer, City Manager K:\WP\PROJECTS\STREETS\Lockeford St\Widening Project\CAccept.doc 1/23/2020 Accepting Improvements Under Contract for Lockeford Street Improvement Project and Adopt Resolution Amending Traffic Resolution No 97-148, by Removing Multi -Way Stop Control at Lockeford Street and Stockton Street February 5, 2020 Page 2 Following acceptance by the City Council, as required by law, the City Engineer will file a Notice of Completion with the County Recorder's office. The notice serves to notify vendors and subcontractors that the project is complete and begins their 30 -day period to file a stop notice requiring the City to withhold payments from the prime contractor in the event of a payment dispute. Staff recommends amending Traffic Resolution No. 97-148, by removing multi -way stop control at Lockeford Street and Stockton Street. FISCAL IMPACT: There will be a slight increase in long-term maintenance associated with the traffic signal and street lights, and a short-term decrease in street and water maintenance costs. FUNDING AVAILABLE: This project was funded by an Regional Surface Transportation Program Grant, Congestion Mitigation and Air Quality Grant, Gas Tax, Storm Fund and Water Fund. ULQZk_Q Charles E. Swimley, Jr. Public Works Director Prepared by Sean Nathan, Senior Civil Engineer CES/SN/tc Attachment K:\WP\PROJECTS\STREETS\Lockeford St\Widening Project\CAccept.doc 1/23/2020 Exhibit A Before After Before a 5 Vii•.: :-� : ^i'_... -iL1� .'� ��_ M •��. ._ _- � _ -_ . .. '..y- • • _ - _. el �S'7�•��i4:s;'. -.��- �•^�y :-._�'ti•': ik'^" � .•h � Vii^- -��� `.�^.=�n' y'�•�',' .-Y•."" �+.ice. L� � .�e�t��...�- H ".. Sp VF. After Page 3 RESOLUTION NO. 2020-20 A RESOLUTION OF THE LODI CITY COUNCIL AMENDING TRAFFIC RESOLUTION NO. 97-148 BY REMOVING MULTI -WAY STOP CONTROL AT LOCKEFORD STREET AND STOCKTON STREET WHEREAS, the Lockeford Street Improvement Project provided for bike lanes, a two-way left -turn lane, a traffic signal at Stockton Street (replacing a four-way stop), sidewalk along both sides of the street, and improved lighting; and WHEREAS, staff recommends amending Traffic Resolution No. 97-148 by removing multi -way stop control at Lockeford Street and Stockton Street. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby amend Traffic Resolution No. 97-148 by removing multi -way stop control at Lockeford Street and Stockton Street. Dated: February 5, 2020 I hereby certify that Resolution No. 2020-20 was passed and adopted by the City Council of the City of Lodi in a regular meeting held February 5, 2020, by the following vote: AYES: COUNCIL MEMBERS — Chandler, Mounce, Nakanishi, and Mayor Kuehne NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Johnson ABSTAIN: COUNCIL MEMBERS — None C�, D PAMELA M. FARRIS Assistant City Clerk 2020-20