HomeMy WebLinkAboutAgenda Report - February 5, 2020 C-05AGENDA ITEM Coo 5 CITY OF LODI p COUNCIL COMMUNICATION TM AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for Wastewater Main Rehabilitation Program (Project No. 8) MEETING DATE: February 5, 2020 PREPARED BY: Public Works Director RECOMMENDED ACTION: Approve plans and specifications and authorize advertisement for bids for Wastewater Main Rehabilitation Program (Project No. 8). BACKGROUND INFORMATION: The Wastewater Main Rehabilitation Program is intended to systematically replace and repair existing wastewater infrastructure that has reached its useful life. This is the eighth project scheduled in this program. In 2016, the City hired a consultant to perform a wastewater pipeline condition assessment. The assessment included the inspection of the City's larger wastewater pipelines and identified pipe segments in need of repair due to deteriorating pipe conditions. Staff uses the condition assessment results to prioritize rehabilitation of wastewater pipelines. Project No. 8 focuses on the 24 -inch and 30 - inch diameter wastewater trunklines within Century Boulevard, from Beckman Road to Church Street, as shown on Exhibit A. Once completed, the project will improve the level of service associated with the wastewater system by increasing reliability, reducing risk of pipeline failures, and decreasing maintenance costs. As with previous phases of the project, staff is again recommending the use of trenchless methods of rehabilitation to minimize both surface disruption and costs. Project No. 8 includes in-place (trenchless) rehabilitation of approximately 5,400 linear feet of 24 -inch and 30 -inch diameter wastewater main (including 100 linear feet of pipeline located under the Union Pacific Railroad), 800 linear feet of 36 -inch diameter storm drain line, and the rehabilitation of approximately 19 manholes. The plans and specifications are on file in the Public Works Department. The planned bid opening date is February 28, 2018. The project estimate is $2,500,000. FISCAL IMPACT: Completing this project will reduce future maintenance costs and increase the performance and reliability of the wastewater system. FUNDING AVAILABLE: Funding will be identified at project award. Charles E. Swimley, Jr. Public Works Director Prepared by Jimi Billigmeier, Assistant Civil Engineer CES/JB/tc Attachment cc: Deputy Public Works Director /City Engineer Utility Manger APPROVED: Stephen Bauer, City Manager K:\WP\PROJECTS\SEWER\WastewaterRehabPhase8\CPSA doc 1/23/2020 J —` -- T-==99� TFF Ur pp,pp 00 � A1111� 24in. 24 in. 24-24'In. 24'In. 24 1n. 24 In.. 24 In: -=E: EH- �- -- ,A F� Exhibit A Wastewater Main Rehab Program Phase 8 O Rehab Utility Manholes Rehab Wastewater Lines Rehab Storm Drain Lines V4 a °, Islamic Cemetery 0 250 500 1,000 Feet