HomeMy WebLinkAboutAgenda Report - January 15, 2020 C-08AGENDA ITEM (200 CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Accept Improvements Under Contract for Lodi Station Parking Garage Structural Repair Project MEETING DATE: January 15, 2020 PREPARED BY: Public Works Director RECOMMENDED ACTION: Accept improvements under contract for Lodi Station Parking Garage Structural Repair Project. BACKGROUND INFORMATION: The Lodi Station Parking Garage, located at 50 North Sacramento Street, has two elevators to convey patrons to all three floors of the parking structure. On May 15, 2018, a patron, driving a vehicle, hit the north elevator shaft, located on the third floor. The impact caused substantial damages to the elevator equipment and elevator shaft. This project was awarded to TPA Construction, Inc., of Rocklin, on March 20, 2019, in the amount of $69,600 and consisted of performing structural repairs to the damaged elevator shaft and exterior wall of the parking structure. The contract has been completed in substantial conformance with the plans and specifications approved by City Council on January 16, 2019. The original contract completion date was July 19, 2019, and the actual contract completion date was October 14, 2019. The difference between the contract completion date and the actual completion date was associated with various delays in the construction process. The final cost of the project was $71,286.16. The difference between the original contract amount and final contract amount is due to one change order, in the amount of $1,686, needed to repair the second level elevator door threshold, which was discovered during the elevator repair project. Following acceptance by the City Council, as required by law, the City Engineer will file a Notice of Completion with the County Recorder's office. The notice serves to notify vendors and subcontractors that the project is complete and begins their 30 -day period to file a stop notice requiring the City to withhold payments from the prime contractor in the event of a payment dispute. FISCAL IMPACT The cost to make the necessary repairs to the structure, elevator replacement, and all engineering and staff time spent on this incident is initially funded by Transit Capital and will be recovered through insurance claims. This project does not impact the General Fund. APPROVED: eien S-Chwahtuer, City Manager KAWP\PROJECTS\TRANSITIodi Station Parking Structure\2018 Elevator Repair\CAccept.doc 1/6/2020 Accept Improvements Under Contract for Lodi Station Parking Garage Structural Repair Project January 15, 2020 Page 2 FUNDING AVAILABLE: This project was funded by Transportation Development Act funds. C Q:==Q U Q Charles E. Swlmiey, Jr. Public Works Director Prepared by Lyman Chang, City Engineer/Deputy Public Works Director CES/LC/tdb cc: Transportation Manager Public Works Management Analyst Risk Manager City Engineer/Deputy Public Works Director TPA Construction, Inc. K:\WP\PROJECTS\TRANSIT\Lodi Station Parking Structure\2018 Elevator Repair\CAccept.doc 1/6/2020