HomeMy WebLinkAboutAgenda Report - January 15, 2020 C-06AGENDA ITEM 12,00 b r% CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt Resolution Awarding Contract for 2019 Pavement Crack Sealing Project to Graham Contractors, Inc., of San Jose ($46,082) MEETING DATE: January 15, 2020 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution awarding Contract for 2019 Pavement Crack Sealing Project to Graham Contractors, Inc., of San Jose, in the amount of $46,082. BACKGROUND INFORMATION: The primary cause of asphalt failure is water infiltration into the street subgrade. Crack sealing is one of the most basic, and important, preventive street maintenance practices. This project consists of thoroughly cleaning and sealing the existing transverse and longitudinal cracks in pavement surfaces and includes other incidental and related work. This contract is intended to supplement work performed by Street Division crews to maximize the street area sealed each year. The 2019 locations are shown on Exhibit A and listed on Exhibit B. The plans and specifications for this project were approved on November 06, 2019. The City received the following three bids for this project on December 04, 2019: Above/(Below) Bidder Location Bid Engineer's Estimate Engineer's Estimate $50,000 Graham Contractor's, Inc. San Jose $46,081.80 $(3,918.20) Pavement Coatings, CO. Sacramento $65,945.70 $15,945.70 Talley Oil, Inc. Madera $152,069.94 $105,988.14 Staff recommends awarding Contract for 2019 Pavement Crack Sealing Project to Graham Contractors, Inc., of San Jose, in the amount of $46,082. FISCAL IMPACT: By increasing the crack sealing effort, the useful life of City streets will be extended. This project does not impact the General Fund. APPROVED: i Stephen Schwaba r ity Manager KAWP\PR0JECTS\STREETS\2019 Crack Seal\Council Comm unications\CAward 01 15 20.doc 12/31/2019 Adopt Resolution Awarding Contract for 2019 Pavement Crack Sealing Project to Graham Contractors, Inc, of San Jose ($46,082) January 15, 2020 Page 2 FUNDING AVAILABLE: Budgeted Fiscal Year 2019/20- TDA Streets (30599000.77020) Andrew Keys Deputy City Manager/Internal Services Director 3&F -'P'2 Charles E. Swimley, Jr. Public Works Director Prepared by Alice Bernardino, Assistant Engineer CES/AB/tdb Attachments cc: Utility Superintendent K:\WP\PROJECTS\STREETS\2019 Crack Seal\Council Communications\CAward_01_15_20.doc 12/31/2019 EXHIBIT A 2019 Crack Sealing Locations Legend — Project Locations N W E S 0 0.25 0.5 Miles KAWP\PROJECTS\STREETS\2019 Crack Seal\PotentialLocations. mxd Exhibit 6 Site Description Road Name From To Street Length (ft) Width (ft) Area (SF) Elm St. Rutledge Dr. Garden Dr. 468 62 29,016 Elm St. Rutledge Dr. Genie Wy. 307 62 19,034 Elm St. Allen Dr. Mills Av. 1,218 62 75,516 Elm St. lGenie Wy. Lower Sacramento Rd. 443 62 27,466 Elm St. JAIlen Dr. lGarden Dr. 240 62 14,880 Elm St. SUBTOTAL 165,912 Ham Ln. Tokay St. Lodi Ave. 1,340 60 80,400 Ham Ln. Sylvia Dr. Iris Dr. 112 60 6,720 Ham Ln. Vine St. Sylvia Dr. 710 60 42,600 Ham Ln. Tokay St. Iris Dr. 490 60 29,400 Ham Ln. Vine St. Park St. 830 60 49,800 Ham Ln. Park St. Cardinal St. 275 60 16,500 Ham Ln. Cardinal St. Kettleman Ln. 1,538 60 92,280 Ham Ln. SUBTOTAL 317,700 Lockeford St. Pleasant Av. Church St. 407 58 23,606 Lockeford St. Orange Av. Fairmont Av. 274 40 10,960 Lockeford St. Crescent Av. Carlo Wy. 350 40 14,000 Lockeford St. California St. Hutchins St. 357 40 14,280 Lockeford St. Hutchins St. Pleasant Av. 873 57 49,761 Lockeford St. Fairmont Av. (SB) Ham Ln. 575 45 25,875 Lockeford St. Crescent Av. Orange Av. 649 50 32,450 Lockeford St. Carlo Wy. California St. 424 40 16,960 Lockeford St. lNeplus Ct. jHam Ln. 1 397 1 58 1 23,026 Lockeford St. lCross St. lNeplus Ct. 1 703 1 35 1 24,605 Lockeford St. SUBTOTAL 235,523 Sacramento St. Lockeford St. I Locust St. 1 449 1 55 1 24,695 Sacramento St. jElm St. Locust St. 1 440 1 55 24,200 Sacramento St. SUBTOTAL 48,895 1 TOTAL 768,030 2019 PAVEMENT CRACK SEALING Various Locations CONTRACT CITY OF LODI, CALIFORNIA THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," and GRAHAM CONTRACTORS, INC., a California corporation, herein referred to as the "Contractor." WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders General Provisions Special Provisions Bid Proposal Contract Contract Bonds Plans The July 1992 Edition, Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing CONTRACT doc 4.1 12/4/2019 wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: Perform the work necessary for thoroughly cleaning and sealing the existing transverse and longitudinal cracks and joints and random cracks in bituminous pavement surfaces and includes other incidental and related work as described in the specifications. See Section 6-07 "Description of Bid Items" and Exhibits A and B for additional information. CONTRACT ITEMS Approx. Item Description 1 Street Area Price / SF Total Cost / Street 1 Elm St. 2 Ham Ln. 3 Lockford St. 4 Sacramento St (SF) 165,912 $0.060 317,700 $0.060 235,523 $0.060 48,895 $0.060 $9,954.72 $19,062.00 $14,131.38 $2,933.70 TOTAL : $ 46.081.80 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. CONTRACT doe 4.2 12/4/2019 ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15 calendar days after the City Manager has executed the contract and to diligently prosecute to completion within 30 CALENDAR DAYS. ARTICLE IX - State of California Senate Bill 854 requires the following: • No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. • No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. • This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. CONTRACT doc 4.3 12/4/2019 IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: 0 Title (CORPORATE SEAL) CITY OF LODI, a municipal corporation LIM STEPHEN SCHWABAUER City Manager Date: Attest: JENNIFER M. FERRAIOLO City Clerk Approved As To Form: JANICE D. MAGDICH City Attorney CONTRACT doc 4.4 12/4/2019 RESOLUTION NO. 2020-03 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING CONTRACT FOR 2019 PAVEMENT CRACK SEALING PROJECT TO GRAHAM CONTRACTORS, INC., OF SAN JOSE WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on December 4, 2019, at 11:00 a.m., for 2019 Pavement Crack Sealing Project, described in the plans and specifications therefore approved by the City Council on November 6, 2019; and WHEREAS, said bids have been checked and tabulated and a report thereof filed with the City Manager as follows: Above/(Below) Bidder Location Bid Engineer's Estimate Engineer's Estimate $50,000.00 Graham Contractor's, Inc. San Jose $46,081.80 $(3,918.20) Pavement Coatings, CO. Sacramento $65,945.70 $15,945.70 Talley Oil, Inc. Madera $152,069.94 $105,988.14 WHEREAS, staff recommends that the City Council award the contract for the 2019 Pavement Crack Sealing Project to Graham Contractors, Inc., of San Jose, in the amount of $46,082. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the contract for the 2019 Pavement Crack Sealing Project to Graham Contractors, Inc., of San Jose, California, in the amount of $46,082; and BE IT FURTHER RESOLVED that the City Manager is hereby authorized to execute the contract; and BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (adopted 11/6/19, Resolution No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above -referenced document(s) that do not alter the compensation or term, and to make clerical corrections as necessary. Dated: January 15, 2020 I hereby certify that Resolution No. 2020-03 was passed and adopted by the City Council of the City of Lodi in a regular meeting held January 15, 2020 by the following vote: AYES: COUNCIL MEMBERS — NOES: COUNCIL MEMBERS — ABSENT: COUNCIL MEMBERS — Chandler, Johnson, Nakanishi, and Mayor Kuehne None Mounce ABSTAIN: COUNCIL MEMBERS — None r PAMELA M. FARRIS Assistant City Clerk 2020-03