Loading...
HomeMy WebLinkAboutAgenda Report - January 15, 2020 C-04AGENDA ITEM CITY OF LODI COUNCIL COMMUNICATION TM C,,-4 AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for Citywide Bicycle Facilities Detection Improvement Project and Adopt Resolution Authorizing City Manager to Execute Agreements with State of California for Funding Allocation MEETING DATE: PREPARED BY: January 15, 2020 Public Works Director RECOMMENDED ACTION: Approve plans and specifications and authorize advertisement for bids for Citywide Bicycle Facilities Detection Improvement Project and adopt resolution authorizing City Manager to execute agreements with State of California for funding allocation. BACKGROUND INFORMATION: The City received Active Transportation Program (ATP) Cycle 3 state grant, in the amount of $447,000, for various bicycle and pedestrian safety improvements. This project consists of installing 13 bike/traffic video detection systems on existing traffic signals, painting 20,300 square feet of green bike lanes, and other incidental and related work, as described in the specifications for the project. The project will enhance bicycle detection at the 13 traffic signal locations on Lower Sacramento Road, portions of Lodi Avenue, and Hutchins Street, as shown on Exhibit A. The project will also pilot some green bike lane striping on Lower Sacramento Road. Staff will monitor the performance and effectiveness of the green bike striping on Lower Sacramento Road. The California Transportation Commission (CTC) approved the funding allocation request at the December 5, 2019 CTC meeting. CTC requires the City to enter into a Master Agreement/Program Supplement Agreement with the State for the funding allocation commitment. The specifications are on file in the Public Works Department. The planned bid opening date is February 19, 2020. The project estimate is $515,000. Local funds will be used to account for the difference between the grant amount and the project estimate. Staff recommends approving plans and specifications and authorizing advertisement for bids for Citywide Bicycle Facilities Detection Improvement Project and authorizing City Manager to execute agreements with State of California for funding allocation. FISCAL IMPACT: There will be an increase in future maintenance cost to maintain the new green bicycle striping. APPROVED: Manager K UPTROJECT&STREET&Citywide Bike Detection \C_PSA.doc 01/06/2020 Approve Plans and Specifications and Authorize Advertisement for Bids for Citywide Bicycle Facilities Detection Improvement Project and Adopt Resolution Authorizing City Manager to Execute Agreements with State of California for Funding Allocation January 15, 2020 Page 2 FUNDING AVAILABLE: Funding will be identified at project award- a_ ward. a - -Q L -L), Charles E. Swimley, Jr, Public Works Director Prepared by Lyman Chang, City/Engineer/Deputy Public Works Director CES/LC/tdb Attachment ccSenior Civil Engineer, Nathan Engineering Technician, Mangrich Public Works Management Analyst K:\WP\PROJECTS\STREETS\Citywide Bike Detection\C_PSA.doc 01/06/2020 N • Traffic Signals UpGrade Location(13) W � E S EXHIBIT A CITYWIDE BICYCLE FACILITIES DETECTION IMPROVEMENT PROJECT LOCATION MAP t�d =MEN i � -� 7 ME l�J ���■■■r.■ate=Iazaa■s�� oilIN EN an a�a�milli r9mr iii --- Taylor -j .won Rd. L `— ■■■ �.� Hogan N • Traffic Signals UpGrade Location(13) W � E S EXHIBIT A CITYWIDE BICYCLE FACILITIES DETECTION IMPROVEMENT PROJECT LOCATION MAP RESOLUTION NO. 2020-01 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE CITY MANAGER TO EXECUTE AGREEMENTS WITH STATE OF CALIFORNIA FOR FUNDING ALLOCATION WHEREAS, the City received Active Transportation Program (ATP) Cycle 3 state grant, in the amount of $447,000, for various bicycle and pedestrian safety improvements; and WHEREAS, the California Transportation Commission (CTC) approved the funding allocation request at their December 5, 2019 meeting; and WHEREAS, staff recommends authorizing the City Manager to execute agreements with State of California for funding allocation. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute agreements with the State of California for funding allocation for various bicycle and pedestrian safety improvements; and BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (adopted 11/6/19, Resolution No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above -referenced document(s) that do not alter the compensation or term, and to make clerical corrections as necessary. Dated: January 15, 2020 I hereby certify that Resolution No. 2020-01 was passed and adopted by the City Council of the City of Lodi in a regular meeting held January 15, 2020, by the following vote: AYES: COUNCIL MEMBERS — Chandler, Johnson, Nakanishi, and Mayor Kuehne NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Mounce ABSTAIN. COUNCIL MEMBERS — None PAMELA M. FARRIS Assistant City Clerk 2020-01