Loading...
HomeMy WebLinkAboutResolutions - No. 2020-70RESOLUTION NO. 2O2O-70 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE CITY MANAGER TO EXECUTE PROFESSIONAL SERVICES AGREEMENT WITH CAROLLO ENGINEERS, INC., OF WALNUT CREEK, FOR PROGRESSIVE DESIGN BUILD CONSTRUCTION DOCUMENTS FOR WHITE SLOUGH WATER POLLUTION CONTROL FACILITY SOLIDS HANDLING EQUIPMENT PROCUREMENT AND INSTALLATION PROJECT; AND FURTHER APPROPRIATING FUNDS WHEREAS, biosolids are anaerobically digested and then directed to a concrete-lined sludge stabilization lagoon at the City's White Slough Water Pollution Control Facility (WSWPCF) and dewatered to a solids content of about 12 percent and stockpiled in an enclosed facility then applied to approximately 700 acres of the City's agricultural fields; and WHEREAS, recently, applied biosolids occasionally exceeded the vector attraction reduction rate because the volatile solids reduction requirement was not achieved in the anaerobic digestion process, primarily resulting from operational challenges associated with the current biosolids dewatering system which translates into a downstream lack of digester capacity to adequately treat solids loading from the treatment plant processes; and WHEREAS, the proposed Solids Handling Equipment Procurement and lnstallation Project is intended to improve solids treatment processes; and WHEREAS, staff recommends authorizing the City Manager to execute a Professional Services Agreement with Carollo Engineers, lnc., of Walnut Creek, for progressive design build construction documents for White Slough Water Pollution Control Facility Solids Handling Equipment Procurement and lnstallation Project, in the amount of $162,500; and WHEREAS, staff also recommends the City Council appropriate funds in the amount of $162,500, from the fund balance of Wastewater Capital (53199000.77020) for Fiscal Year 2019t20. NOW, THEREFORE, BE lT RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute a Professional Services Agreement with Carollo Engineers, lnc., of Walnut Creek, California, for progressive design build construction documents for White Slough Water Pollution Control Facility Solids Handling Equipment Procurement and lnstallation Project, in the amount of $162,500; and BE lT FURTHER RESOLVED that the Lodi City Council does hereby authorize an appropriation for the project, in the amount of $162,500, as set forth above; and BE lT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (Res. No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above-referenced document(s) that do not alter the compensation or term, and to make clerical corrections as necessary. 3::"=1===fj]ji=393:===================================================== I hereby certify that Resolution No. 2020-70 was passed and adopted by the City Council of the City of Lodi in a regular meeting held April 15, 2020, by the following vote: AYES: COUNCIL MEMBERS - Chandler, Mounce, Nakanishi, and Mayor Kuehne NOES: ABSENÏ: ABSTAIN COUNCIL MEMBERS - None COUNCIL MEMBERS - None COUNCIL MEMBERS - None A-r."/øW|trñ'''1/¿t' PAMELA M. FARRIS Assistant City Clerk 2020-70