HomeMy WebLinkAboutAgenda Report - November 20, 2019 C-11AGENDA ITEM C-l
Crrv or Lonr
Couxcn CovTMUNICATIoN
AGENDA TITLE:
MEETING DATE:
PREPARED BY:
Accept lmprovements Under Contract for Citywide Bike Lane lmprovement
Project
l¡
Npvember 20,2019
Public Works Director
RECOMMENDED AGTION: Accept improvements under contract for Citywide Bike Lane
lmprovement Project.
BACKGROUND ¡NFORMATION: This project installed nearly four miles of new Class ll bike lanes
and identified nearly five miles of Class lll bike routes on Guild
Avenue, Pine Street, Holly Drive, Mills Avenue, Loma Drive,
California Street, Elm Street, Lockeford Street, Aspen Grove Drive, Vineyard Drive, and Banyan
Drive. These locations were identified on the City's Bike Master Plan and are shown on Exhibit A.
The contract was awarded to Centerline Striping Company, lnc., of Elk Grove, in the amount of
$59,573 on June 19,2019. The contract has been completed in substantial conformance with the
plans and specifications approved by City Council.
The contract completion date was October 30, 2019 and the actual contract completion date was
October 29,2019. The final cost of the project was $59.687. The difference between the original
contract amount and final contract amount was due to the actual quantity of material being slightly
higher than what the City had estimated in the specifications. Photos of the completed work are
shown in Exhibit B.
Following acceptance by the City Council, as required by law, the City Engineer will file a Notice of
Completion with the County Recorder's office. The notice serves to notify vendors and subcontractors
that the project is complete and begins their 30-day period to file a stop notice requiring the City to
withhold payments from the prime contractor in the event of a payment dispute.
FISCAL IMPACT: There will be a slight increase in future maintenance cost to maintain the
new bicycle street striping and signs.
FUNDING AVAILABLE: This project was funded by Fiscal Year 2019/20 Measure K
(3039e000 .77020).
Charles E ey, Jr
Public Works Director
Prepared by Sean Nathan, Senior Civil Engineer
cES/SN/tdb
Attachments
cc: UtilitySuperintendent
APPROVED
K:\WP\PROJECTS\STREETS\Citywide Bicycle Enhancement Project\CAccept.doc
City Manager
111412019
Hwy 99Lodi Av.Ham Ln.Elm St.
Turner Rd.
Pine St.Stockton St.Harney Ln.Hutchins St.Vine St.Cherokee Ln.Guild Av.Church St.Mills Av.Locust St.Lower Sacramento Rd.99Lee Av.Century Blvd.
K e t t l e m a n L n / H w y 12
Holly Dr.Cluff Av.Lockeford St.Wells Ln.Tokay St.School St.Central Av.Pleasant Av.Louie Av.Crescent Av.Main St.Beckman Rd.Daisy Ave.California St.Oak St.Sacramento St.Cardinal St.
E d e n S t .UP RRFairmont Av.Rose St.Orange Av.F l o r a S t .
P o p l a r S t .Rutledge Dr.Loma Dr.Tienda Dr.Cross St.Walnut St.
H i l b o r n S t .Garfield St.Virginia Av.A l m o n d D r .
Kettleman Ln.
Corbin Ln.
Palm Av.Pacific Av.Lakeshore Dr.Sylvan Wy.Corinth Av.Park St.Sunset Dr.M a p l e S t .
Yosemite Dr.
Cochran Rd.Scarborough Dr.Industrial Wy.
Thurman St.
Eureka Av.
Olive Ct.Washington St.Cabrillo Cir.
Lexington Dr.
M i s s i o n S t .
Iris Dr.
Br and y w in e D r .
Auto Center Dr.
Windsor Dr.
Sylvia Dr.
Victor Rd. (Hwy. 12)Woodrow St.Lincoln Av.T e jo n S t.First St.Blackbird Pl.Bluejay Wy.Fo rr e s t A v .Vienna Dr.Wimbledon Dr.
Va l l e y A v .
Vista Dr.
Eilers Ln.
L e b a r o n B l v d .
E l g i n A v .
Edgewood Dr.
Jerry Ln.Lloyd St.Camphor Wy.Burgundy Dr.Kelly St.Oxford Wy
A c a c i a S t .
Henri Ln.Woodhaven Ln.St. Anton Dr.West LnPio neer Dr.
Lake Home Dr.
Pinot Noir Dr.
C h e r r y S t .Benson Dr.Columbia Dr.
Railroad Av.Heavenly Wy.Murray St.Camino Real Dr.Millbrook Dr.
Mariposa Wy.
Rocky LnCanal DrAlpine Dr.Zinfandel Dr.Rainier Dr.Interlaken Dr.Willow Glen Dr.
Olson DrAllen Dr.Ivory LnDowning Dr.Sunwest Dr.
Magic Ln.Tudor St.Sturla St.
Sc h a f f e r D r .Starling Wy.Commerce St.Isabella Dr.
M e a d o w l a r k W y .Madera Dr.Raphael Wy.Ackerman Dr.Culb er ts on D r .
Rio Vista Dr.
Connie St.Atherton Dr.Mokelumne River Dr.Nevins Dr.Calaveras St.Y o k u t s D r .Charleston Wy.Fairchild Dr.Victoria Dr.
Falls Av.Devine Dr.Fi n c h R u n
Giannoni Wy
Kirkwood Dr.
Village St.
Newbury Cir.Winchester Dr.Maggio Cir.Hansen Dr.Sw ai n D r .
De Force Av.Academy St.Aacdemy St
Bel Air Ct.Northwood Dr.Rivergate Dr.Houston Ln.Chablis Dr.Squire Wy.M e n d o c i n o D r .Shattuck Tract Rd.B a r r in g t o n W y .Rockingham Cir.A d o b e C t .
Norfolk Dr.Hurd Rd.Peach St.Evert Ct.Gateway Cir.Citadel Wy.
L o w e S t .Whitney St.Grand Fir Dr.L a m b e r t C t .
Vintage Oaks Ct
Royal Oaks Ct.
Spruce St.Cedar Ct.Daisy Ave.
Ol iv e Ct.99To k a y S t .Pleasant Av.Oxford W y
Mills Av.Crescent Av.Garfield St.Pleasant Av.Vine St.Pacific Av.99Garfield St.99V i n e S t .Main St.Harney Ln.
Oa k S t .School St.Central Av.Rose St.Sunset Dr.Fairmont Av.Lockeford St.
Louie Av.Sacramento St.Park St.Lee Av.Legend
Bike Lane Type
Class II
Class III
E X H I B IT ACitywide B i k e L a n e I m p rovement Project
Path: K:\WP\PROJECTS\STREETS\C itywide Bicycle Enhancement Project\Project Loc Map.mxd
µ0 0.50.25
Miles
CACCEPT_EXHIBIT B.DOC
EXHIBIT B
Class II Bike Lane
Class III Bike Route (Share the Road Marking)