HomeMy WebLinkAboutAgenda Report - October 2, 2019 C-04AGENDA ITEM Crrv or Lonr CouNcIT, CoUMUNICATION AGENDA TITLE:Approve Plans and Specifications for Church Street Bike and Pedestrian lmprovement Project, Authorize Advertisement for Bids, and Adopt Resolution Authorizing City Manager to Procure Project Signal Equipment ($250,000) MEETING DATE: October 2,2019 PREPARED BY: Public Works Director RECOMMENDED AGTION: Approve plans and specifications for the Church Street Bike and Pedestrian lmprovement Project, authorize advertisement for bids, and adopt resolution authorizing City Manager to procure project signal equipment, in an amount not to exceed $250,000. BACKGROUND INFORMATION: On March 6,2019, Council authorized the City Manager to enter into a cooperative agreement with the San Joaquin Council of Governments (SJCOG) to utilize Bicycle, Pedestrian and Safe Routes to School Competitive Measure K funding for this project. A public meeting was held at the Lodi Chamber of Commerce on February 27,2019 and a project presentation was given at a shirtsleeve meeting on April 30, 2019. The project is located on Church Street, from LodiAvenue to Lockeford Street. The project includes resurfacing the roadway, reducing the existing four travel lanes to two travel lanes, installing a two-way leftturn lane, installing Class 2 bike lanes, modifying the signal equipment to provide bike detection at intersections, and installing other pedestrian accessibility enhancements. The specifications are on file in the Public Works Department. The planned bid opening date is October 30,2019 and project award is anticipated to be on November 20,2019. Staff is working to have the project completed prior to the Street Fair in May 2020. ln order to accommodate this timeline, staff is recommending that Council authorize the City Manager to procure the signal equipment prior to, and separately from, the contract award. While generally procured by the contractor, the signal equipment often requires a five- to six-month lead time. By starting the signal equipment procurement at project advertisement, the signal equipment will arrive approximately two months earlier. The signal equipment to be procured by the City is estimated not to exceed $250,000. The total project, including staff time and contingencies, is estimated to cost $1,700,000. Staff recommends plans and specifications for the Church Street Bike and Pedestrian lmprovement Project, authorize advertisement for bids, and adopt resolution authorizing City Manager to procure project signal equipment, in an amount not to exceed $250,000. FISCAL IMPACT:There will be a slight increase in traffic signal and striping maintenance costs and a minimal long-term cost-savings related to the pavement resurfacing and pedestrian improvements. This project will not impact the General Fund. APPROVE n c-4 TM K:\WP\PROJECTS\STREETS\Church St Road Diet\CPSA.com uer, City Manager 9t24t2019 Approve Plans and Specifications for Church Street Bike and Pedestrian lmprovement Project, Authorize Advertisement for Bids, and Adopt Resolution Authorizing C¡ty Manager to Procure Project Signal Equipment ($250,000) October 2, 2019 Page2 FUNDING AVAILABLE:Complete project funding will be identified at the project award Fiscal Year 2019/20 Budget: Measure K (30399000.77 020) - $250,000 Andrew Keys Deputy City Manager/l nternal Services Di rector E. Swimley Jr Public Works Director Prepared by Sean Nathan, Senior Civil Engineer cES/SN/tdb cc:. Traffic Engineer, Vohra K:\WP\PROJECTS\STREETS\Church St Road Diet\CPSA.com 9t23t2019