Loading...
HomeMy WebLinkAboutAgenda Report - February 17, 1999 E-04AGENDA TITLE: Purchase of Polemount and Padmount Transformers ($95,188.51) MEETING DATE: February 17, 1999 PREPARED BY: Electric Utility Director RECOMMENDED ACTION: That the City Council adopt the attached resolution awarding the bid for the purchase of 22 polemount transformers and 23 padmount transformers to the bidders whose proposals and equipment meet City of Lodi specifications, and whose transformers are expected to yield the lowest overall life -cycle costs, Cooper Power Systems, Waukesha, WI 8 ea 37.5KVA Polemounts $ 6,147.14 Kuhlman Industries, Versailles, KY 14 ea 50KVA Polemounts $ 14,451.43 Howard Industries, Laurel, MS 10 ea 50KVA 10 Padmounts $ 15,623.75 6 ea 75KVA 10 Padmounts 11,462.45 1 ea 150KVA 30 Padmount 5,197.86 4 ea 300KVA 30 Padmounts 28,695.98 1 ea 75KVA 30 Padmount 3,718.45 $ 64,698.49 G E Supply Co., Sacramento 1 ea 500KVA 30 Padmount $ 9,891.45 BACKGROUND INFORMATION: On November 19, 1997, the City Council approved specifications and authorized advertisement for bids for polemount and padmount transformers as necessary to meet the Department's needs through Fiscal Year 1998-99. On January 27, 1999, bids for 22 polemount and 23 padmount transformers were opened and total life -cycle costs were evaluated. Life -cycle costs are the combined total of purchase price plus cost of operation based on estimated power loss during the projected life of the transformer. Proposals are also evaluated on the basis of compliance with equipment and bid specifications. Failure to comply with both may lead to disqualification of the bid. A summary of the bid evaluation is attached as Exhibit A. These transformers will be used to serve new commercial loads at Kettleman Lane and Sylvan Drive, Vine Street and Guild Avenue, the lift station at Mills Avenue, and for downtown reconstruction. Transformers will also be used for residential loads at Sunwest and Lodi West, and to replenish the Department's inventory. FUNDING: Electric Utility Department 1998-99 Fiscal Year Operating Plan, Page E-22 TION. Vallow, Electric Utility Director Funding Approved: w^ Vicky McAthie, Fi ance Director Prepared by Joel Harris, Purchasing Officer APPROVED: H. Dixon Flynn — City Manager PAD CC2G 02/01/99 RESOLUTION NO. 99-24 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE BID FOR THE PURCHASE OF POLEMOUNT AND PADMOUNT TRANSFORMERS WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on January 27, 1999 at 11:00 a.m. for the purchase of 22 polemount transformers and 23 padmount transformers for the Electric Utility Department, described in the specifications therefore approved by the City Council on November 19, 1997; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as shown on Exhibit A attached; and WHEREAS, the City Manager recommends that award of the bid for the purchase of 22 polemount transformers and 23 padmount transformers for the Electric Utility Department, be made to the bidders whose proposals and equipment meet City of Lodi specifications, and whose transformers are expected to yield the lowest overall life -cycle costs, to wit: Cooper Power Systems, Waukesha, WI 8 ea. 37.5KVA Polemounts 6147.14 Kuhlman Industries, Versailles, KY 14 ea. 50KVA Polemounts $14,451.43 Howard Industries, Laurel, MS 10 ea. 50KVA 10 Padmounts $15,623.75 6 ea. 75KVA 10 Padmounts $11,462.45 1 ea. 150KVA 30 Padmount $ 5,197.86 4 ea. 300KVA 30 Padmount $28,695.98 1 ea. 75KVA 30 Padmount 3,718.45 $64,698.49 G E Supply Co., Sacramento 1 ea 500KVA 30 Padmount 9,891.45 Total Cost $95,188.51 NOW, THEREFORE, BE IT RESOLVED by the Lodi City Council that the award of the purchase of 22 polemount transformers and 23 padmount transformers for the Electric Utility Department, be and the same is hereby awarded to the above-described responsible bidders, in the total amount of $95,188.51. Dated: February 17, 1999 I hereby certify that Resolution No. 99-24 was passed and adopted by the City Council of the City of Lodi in a regular meeting held February 17, 1999, by the following vote: AYES: COUNCIL MEMBERS — Hitchcock, Mann, Nakanishi, Pennino and Land (Mayor) NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None Com, I t 1VF--J *AE . R MCHErk 99-24 Transformer Bid Evaluation Number of units: 7 Bid Opening: Jan_ 27, 1999 Exhibit A.1 Vendor Polemount Extended Ptke Tax (factor): 1.0775 No Load Load Cost of Life Cycle Delivery Height Weight Height Price S Ptke S wAax $ ass (watts ass (watts No Load Loss Shvatt: 6.00 (inches) (It-) Kuhlman 925.00 6,475.00 6,976.81 96 Jan. 29, 1999 4,M2.00 5,124.00 9,156.00 16,132.81 Load Loss Slvratt: 2.00 700 Central Moioney, Inc. 663.00 6,041.00 6,509,18 84 436 Bid Kam 1: 31.5 KYA, 277 VotL Single Phase Conventional 6,104.00 9,632.00 16,141.18 Number of units: 3 752 Cooper Power System 786.00 5,502.00 Vendor Unit Extended Price No Lead Load No Load Load Cost of Life Cycle Delivery Height Weight 93 Price $ Price $ wRax S ass (watts ass (watts Loss value Lass value Losses S Cost $ (weeks) (inches) (Ibs) Cooper Power Syste 650.00 1,950.00 2,101.13 64 311 1,512.00 1,866.00 3,378.00 5,479.13 14 39 536 Kuhlman 735.00 2,205.00 2,375.89 84 291 1,512.00 1,746.00 3,258.00 5,633.89 8 36 600 Wesco Distribution 689.00 2,067.00 2,227.19 82 327 1,476.00 1,962.00 3,438.00 5,665.19 7 36 486.79 Central Moloney. Inc. 733.00 2,199.00 2,369.42 85 299 1530.00 1,794.00 3,324.00 5,643.42 12 39 581 Howard Industries, Inc 746.00 2,238.00 2,411.45 72 333 1,296.00 1,998.00 3,294.00 5,705.45 10-12 36 563 G E Supply 625.00 1,875.00 2,020,31 83 .454 1,494.00 2,724.00 4,218.00 6,238.31 9-11 34.1 483 Jerry's Electric 753.50 2,260.50 2,435.69 97 663 1,746.00 3,978.00 5,724.00 8,159.69 10-12 46 542 Bid Karr 2: 60 KVA,,1201240 Volt, Single Phase Conventional Number of units: 7 S Vendor Unit Extended Ptke No Load Load No Load Load Cost of Life Cycle Delivery Height Weight Height Price S Ptke S wAax $ ass (watts ass (watts Loss value loss value Losses 3 Cost S (weeks) (inches) (It-) Kuhlman 925.00 6,475.00 6,976.81 96 366 4,M2.00 5,124.00 9,156.00 16,132.81 8 36 700 Central Moioney, Inc. 663.00 6,041.00 6,509,18 84 436 3,528.00 6,104.00 9,632.00 16,141.18 12 40 752 Cooper Power System 786.00 5,502.00 5,928.41 106 425 4,452.00 5,950.00 10,402.00 16,330.41 14 39, 640 Howard Industries, Inc 962.00 6,734.00 7,255.89 93 376 3.906.00 5,264.00 9,170.00 16,425.89 8.10 36 661 Wesco Distribution 1,110.00 7,770.00 8,372.18 as 356 3,570.00 4,984.00 8,554.00 16,926.18 7 38 002.67 G E Supply 931.00 6,517.00 7,022.07 111 424 4,562.00 5,936.00 10,598.00 17,620.07 9.11 37.8 715 Jerry's Ekctric 604.10 5,628.70 6,09492 148 596 6,216,00 6,372.00 14,566.00 20,652.92 10-12 46 652 B,Id Kan 3: 37.5 KVA, 120840 Volt, Single Phase Circuit Protected Number a1 units: S Vendor Unit Extended Price No Load Load No Load Load Cost of Life Cycle Delivery Height Weight Price S Price 5 witax S ass (watts ass (watts Loss value Loss value Losses 3 Cost 3 (weeks) (inches) (itis) Cooper Power Syste 751.00 3,755.00 4,046.01 89 340 2,670.00 3,400.00 6,070.00 10,116.01 12 43 586 Kuhlman 744.00 3,720.00 4,008.30 87 352 2,610.00 3520.00 5,130.00 10,138.30 8 39 565 Howard Industries, Inc 829,00 4,145.00 4,466.24 75 350 2,250.00 3,500.00 5,750.00 10,216.24 8-10 36 556 Central Moloney, Inc. 86S.00 4,325.00 4,660.19 89 327 2,570.00 3,270.00 5.960.00 10,600.19 12 39 581 Wesco Distribution 1,024.00 5,129.00 5,516.80 77 290 2,310.00 2,900.00 5.210.00 10,726.80 7 40 695.41 G E Supply 942.00 4,710.00 5,075.03 85 399 2,550.00 3 990.00 5,540.00 11,615.03 9-11 42.9 740 Jerry's Electric 828.50 4,142.50 4,463.54 95 709 2.850.00 7,090.00 9.940.00 14,403.54 10-12 46 539 Bid Item 4: 50 KVA, 1201`240 Volt, Single Phase Circuit Protected Number of units: 7 Vendor Unit Extended Price No Load Load No Load Load Cost of Life Cycle Delivery Height Weight Price S Price 3 wttax 5 ass (watts ass (watts Loss value Lass value Losses S Cost S (weeks) (inches) (lbs) Kuhiman 991.00 6,937.00 7,474.62 96 415 4.032.00 5,810.00 9.842.00 17,316.61 8 42 760 Howard Industries, Inc 1,011.00 7,077.00 7,625.47 89 444 3,738.00 6216.00 9.954.00 17,579.47 8.10 37 665 Central Maloney, Inc. 1,012.00 7,084.00 7,633.01 84 476 3,523.00 fi 56-3.00 10,192.00 17,825.01 12 40 752 Cooper Power System 795.00 5,565.00 5,996.29 106 545 4,452.00 7,630.00 12.082.00 18,078,29 12 45 641 Wesco Distribution 1,340.00 9,380.00 10,106.95 98 346 4,116.00 4,844.00 8,950.00 19,066.95 7 -. 44 G E Supply 1,141.00 7,987.00 8,605.99 124 409 5 208.09 5,726.00 10.934.00 19,539.99 9-11 73.5 819 Jerry's Electric 940.50 6,583.50 7,093.72 148 534 6,216.00 8,876.00 15,092.00 72,18S.72 10.12 46 652 TransfortnerBid Evaluation Bid Opening: Jan- 27, 1999 Exhibit A.2 Padmount Tax (factor): 1.0775 No Load Load No Load Load Cast of Lite Cycle Delivery Height Weight Price S Price S witax S No Load Loss S/watt: 6.00 (inches) (lbs) Howard Industries, Inc. A 5.558.00 26,632.00 28,695.98 190 1983 4,560.00 15,664.00 20 424 00 49,119.98 Jan. 30, 1999 Load Loss Smatt 2.00 5,930.00 27,720.00 29,868.30 188 1892 4,512.00 15,136.00 19,548.00 49,516.30 19-21 55 81d from 1: 50 KVA, 2401120 Volt, Single Phase Pad 5,729.00 22.915.00 24,691.99 402 Number of units: l0 24.25 -67 Wesco Distribution, Inc. Vendor Unit Extended . Price No Load Load No Load Load Cost of Lite Cycle Delivery Height Weight 30 Price S Price S witax S ass (watts ass (watts Loss value Loss value Losses 5 Cost S (weeks) (inches) (lbs) Howard Industries, Inc. A 1,450.00 14,500.00 15,623.75 42 347 2,520.00 6,940.00 9,460.00 25,083.75 13-15 28 Kuhlman Howard Industries, Inc 1,158.00 11,580.00 12,477.46 83 407 4,980.00 8,140.00 13,120.00 25,597.45 1214 26 Kuhlman 1,153.00 11,630.00 12,531.33 105 354 6,300.00 7,080.00 13,380.00 25,911.33 10 24 Cooper Power Systems 990.00 9,900.00 10,667.25 100 477 6,000.00 9,540.00 15,540.00 26,207.25 22 24 Central Moloney, Inc. 1,289.00 12,690.00 13,888.98 117 280 7,020.00 5.500.00 12.520.00 26,508.98 19 28 G E Supply 1,066.00 10,660.00 11,486.16 118 S10 7,080.00 10,200.00 17,250.00 28,766.15 15-18 25.8 Wesco Distribution, Inc. 1,103.00 11,030.00 11,884.83 85 808 5,100.00 12,160.00 17,250.00 29,144.83 10-12 NA Jerry's Electric, Inc. 1,394.80 13,948.00 15,028.97 132 468 7,920.00 9,360.00 17,290.00 32,308.97 10-12 24 81d Item 2: 75 KVA, 2401120 Volt, Single Phase Pad Number of units: 6 Vendor Unit Extended Price No Load Load No Load Load Cast of Life Cycle Delivery Height Weight Price 5 Price S wrtax S oss (watts ass (watts Loss value Loss value Losses S Cost S (weeks) (inches) (Ibs) Howard Industries, Inc. A 1,773.00 10,598.00 11,462.45 55 485 1,980.00 5,820.00 7,800.00 19,262.45 13-15 28 Howard industries, Inc 1,415.00 8,490.00 9,147.98 125 523 4,500.00 6,276.00 10.776.00 19,92398 12-14 28 Kuhirman 1,531.00 9,186.00 9,897.92 129 462 4,644.00 5,544.00 10,168.00 20,08552 10 24 Cooper Power Systems 1,229.00 7,374.00 7,945.49 ISO 564 5,400.00 6.768.00 12,168.00 20,113.49 22 24 Central Moloney, Inc. 1,510.00 9,060.00 9,762.15 207 313 7,452.00 3,756.00 11,208.00 20,970.15 19 26 Wesca Distribution. Inc. 1,473.00 8,838.00 9,522.95 138 549 4,968.00 6,586.00 11,S56.00 21,078.95 10-12 NA G E Supply 1,312.00 7,872.00 8,482.08 152 688 5,832.00 8,256.00 14,058.00 22,570.08 15-18 25.8 Jeny's Electric. Inc. 1,798.50 10,791.00 11,627.30 145 750 5.220.00 9,000.00 14,220.00 25,847.30 10-12 26 Bid Mem 3: 150 KVA, 208YI120 Volt, Three Phase Pad Number of units: 1 Vendor Unit Extended Price No Load Load No Load Load Cost of Life Cycle Delivery Height Weight Price 5 Price S wnax 5 ass (watts ass (watts loss value Loss value Loses $ Cost S (weeks) (inches) (lbs) Howard Industries, Inc. A 4,824.00 4,824.00 5,197.86 134 912 804.00 1,824.00 2,528.00 7,825.86 24-25 51 Howard industries, Inc 4,030.00 4,030.00 4,342.33 255 1074 1,590.00 2.148.00 3.738.00 8,060.33 24.25 51 G E Supply 5,255.00 5,255.00 5,662.26 106 1086 636.00 2,172.00 2.808.00 8470.26 19.21 61 Wesco Distribution, Inc. 4.211.00 4,211.00 4,537.35 271 1313 1,625.00 2,525.00 4,252.00 9,789.35 14-16 46.5 Cooper Power Systems 4,920.00 4,920.00 5,301.30 350 1024 2,100.00 2.048.00 4,148.00 9,149.30 30 so Central Moloney, Inc. No Bid Jerry's Electric, Inc. No Bid Kuhlman No Bid Bid hem a: 300 KVA, 208Y/120 Volt, Three Phase Pad Number of units: 4 Vendor Unit Extended Price No Load Load No Load Load Cast of Lite Cycle Delivery Height Weight Price S Price S witax S ass (watts ass (watts Loss value Lass value Losses $ Cost 5 (weeks) (inches) (lbs) Howard Industries, Inc. A 5.558.00 26,632.00 28,695.98 190 1983 4,560.00 15,664.00 20 424 00 49,119.98 24.25 57 G E Supply 5,930.00 27,720.00 29,868.30 188 1892 4,512.00 15,136.00 19,548.00 49,516.30 19-21 55 Howard Industries, Inc 5,729.00 22.915.00 24,691.99 402 2055 9.548.00 15.440.00 25.068.00 50,779.99 24.25 -67 Wesco Distribution, Inc. 4,747.00 18,988.00 20,459.57 459 2423 11,016.00 19,334.00 30.400.00 $0,859.57 14-16 46.5 Cooper Power Systems 6,215.00 24,860.00 26,786.65 559 1997 13,416.00 15,975.00 29,392.00 56,178.65 30 50 Cental Moloney, Inc. No Bid . Jerry's Electric, Inc. No Bid Kuhlman No Bid Exhibit A.3 Bid Hem 5: 75 KVA, 400YI277 Volt, Three Phase Pad Number of units: Vendor Unit Extended Price No Load Load No Load Load Cost of Life Cycle Delivery Height Weight Price 3 Price S wrtax $ oss (watts oss (watts Loss value Loss value Losses 3 Cost 3 - (weeks) (inches) (Ibs) Howard industries, Inc. A 3,451.00 3,451.00 3,718.45 80 551 480.00 1,122.00 1,502.00 5,320.45 2425 51 Howard industries, Inc 3,150.00 3,160.00 3,404,90 160 666 960.00 1,332.00 2.292.00 5,696.90 24-26 51 G E Supply 4,630.00 4,630.00 4,988.83 80 458 480.00 916.00 1,396.00 6,384.83 19.21 61 Wesco Distribution, Inc. 3,750.00 3,760.00 4,051.40 208 623 1,248.00 1,246.00 2,494.00 6,545.40 14.16 46.5 Cooper Power Systems 4,079.00 4,079,00 4,395.12 195 592 1,170.00 1,184.00 2,354.00 6,749.12 30 50 Central Moloney, Inc. No Bid Jerry's Electric, Inc, No Bid Kuhlman No Bid Bid Item 6: $00 KVA, 480Y1277 Volt, Three Phase Pad Number of units: 1 Vendor Unit Extended Price No Load Load No Load Load Cost of Life Cycle Delivery Height Weight Price $ Price 3 wRax 3 oss (watts ass (watts Loss value Lass value Losses S Cost 3 (weeks) (inches) Ps) GESupply 9,180.00 9,180.00 9,891.45 250 2,814 1,560.00 5,528.00 7,188.00 17,079.45 19-21 77 Howard Industries, Inc. AC 8,891,00 8,891.00 9,580.05 275 3,009 1,650.00 6,018.00 7,668.00 17,248.05 24.26 75 Wesco Distribution, Inc. 6,568.00 6,568.00 7,077.02 520 3,409 3,720.00 6,818.00 10,538.00 17,615.02 1416 50.5 Howard Indust7ks, Inc 7,832.00 7,832.00 8,438.98 609 2,859 3.654.00 5,718.00 9,372.00 17,810.98 24-26 69 Cooper Power Systems 8,725.00 8,726.00 9,402.27 815 2,551 4,890.00 5,302.00 10,192.00 19,594.27 30 50 Central Moloney, Inc. No Sid Jerry's Electric, Inc. No Bid Kuhlman No Bid 13099 Trans Pad Eval.xls 3