Loading...
HomeMy WebLinkAboutAgenda Report - September 4, 2019 C-09AGENDA ITEM c-q Crry or Lonr C ouNcrr C ovrMUNrcATroN AGENDA TITLE: MEETING DATE: September 4,2019 PREPARED BY: Electric Utility Director Adopt Resolution Authorizing City Manager to Execute Professional Services Agreement for Detailed Design Services for Mclane Substation Upgrade Project with Leidos of Hendersonville, Tenn. ($52,125), and Appropriating Funds ($52,125) RECOMMENDED ACTION Adopt a resolution authorizing the City Manager to execute a professional services agreement for detailed design services for the Mclane Substation Upgrade Project with Leidos of Hendersonville, Tenn., in an amount not-to-exceed $52,125, and appropriating funds in the amount of $52,125. BACKGROUND INFORMATION: The Mclane Substation circuit breakers and relay protection equipment are approximately 40 years old and prone to abrupt failure. On November 1, 2017, the City Council approved a contract with Leidos to provide conceptual design to upgrade the existing facilities at the Mclane Substation. The conceptual design was completed and Leidos provided bid documents which staff utilized to invite bids for construction. On July 17 , 2019 the City Council awarded the construction bid, authorized change orders and appropriate funds for a total project budget of $1.8 million. Lodi Electric Utility (LEU) staff is now proposing to enter into a professional services agreement with Leidos to provide "for construction" detailed design drawings for the project. These additional services, including the requested appropriation, will result in a revised project budget of $1,852,125. Pursuant to Lodi Municipal Code, Section 3.20.075, engineering service contracts are exempt from advertising and bidding requirements and shall be awarded on the basis of professional qualifications and experience, quality of service, past performance, and negotiated prices. Leidos has provided a high quality of service during the conceptual design phase and due to their familiarity with the project, they are the most qualified to provide the detailed design drawings. Leidos has extensive experience and a proven track record of providing such design services for similar projects with other electric utilities. This project is in accordance with LEU's Strategic Plan whereby LEU will design, operate, and maintain the distribution system to ensure reliable electric service. FISGAL IMPACT:Not to exceed 952,125. Additional $52,125 appropriation requested from LEU Fund Balance (Fund 500) to LEU Capital Fund 501 (Project No. EUCP-18148). FUNDING AVAILABLE: APPROVED Ste Manager Adopt Resolution Authorizing City Manager to Execute Professional Services Agreement for Detailed Design Services for Mclane Substation Upgrade Project with Leidos of Hendersonville, Tenn. ($52,125), and Appropriating Funds ($52,125) September4,2019 Page2 of 2 Andrew C. Keys Deputy City Manager/lnternal Services Director er Utility Director PREPARED BY: Hasan Shahriar, P.E., Senior Power Engineer RESOLUTTON NO. 2019-180 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE CITY MANAGER TO EXECUTE A PROFESSIONAL SERVICES AGREEMENT FOR DETAILED DESIGN SERVICES FOR MCLANE SUBSTATION UPGRADE PROJECT WITH LEIDOS, OF HENDERSONVILLE, TENNESSEE; AND FURTHER APPROPRIATING FUNDS WHEREAS, on November 1, 2017, the City Council approved a contract with Leidos to provide conceptual design to upgrade the existing facilities at the McLane Substation; and WHEREAS, the conceptual design was completed and Leidos provided bid documents which staff utilized to invite bids for construction; and WHEREAS, on July 17,2019, the City Council awarded the construction bid, authorized change orders, and appropriated funds for a total project budget of $1.g million for the Mclane Substation Upgrade Project; and WHEREAS, Lodi Electric Utility (LEU) staff recommends entering into a professional services agreement with Leidos to provide "for construction" detailed desigñ drawings; and WHEREAS, pursuant to Lodi Municipal Code, Section 3.20.075, engineering service contracts are exempt from advertising and bidding requirements and shall be awarded based on the basis of professional qualifications and experience, quality of service, past performance, and negotiated prices; and WHEREAS, Leidos has provided a high quality of service during the conceptual design phase and due to their familiarity with the project, they are the most qualified to'provide tñe detailed design drawings; and WHEREAS, staff also recommends the City Council appropriate funds in the amount of $52,125 from LEU fund balance (Fund 500) to LEU Capitat Fund 501 (project No. EUCp- 18148) for Fiscal Year 2019120 to be added to the existing $1.8 million bu-dget for project No. EUCP- 18148, for a total approved project budget of $1 ,9S2,1 25. NOW, THEREFORE, BE lT RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute a professional services agreement for detailed desigñ services for the Mclane Substation Upgrade Project with Leidos, of Henderdonville, Tennessãe in an amount not to exceed $52,125; and BE lT FURTHER RESOLVED that the Lodi City Council does hereby authorize an additional appropriation for the McLane Substation Upgrade Project, in the amoúnt of $52,125, as set forth above; and BE lT FURTHER RESOLVED that the Lodi City Council does hereby authorize the City Manager to continue budget authority up to the full project budget for this project from fiscal year to fiscal year until such point as the project is complete and is accepted' by Council. At such time, all unspent budget authority will return to the fund for re-appropriatión by the City Council. Dated: September4,2019 ___;:___ I hereby certify that Resolution No. 2019-180 was passed and adopted by the City Council of the City of Lodi in a regular meeting held September 4, 2019, by the following vote: AYES: COUNCIL MEMBERS - Johnson, Kuehne, Mounce, Nakanishi, and Mayor Chandler NOES COUNCIL MEMBERS - None ABSENT: COUNCIL MEMBERS - None ABSTAIN: COUNCIL MEMBERS - None NIFER FERRAIOLO City Clerk 201 9-1 80