Loading...
HomeMy WebLinkAboutAgenda Report - August 21, 2019 C-08AGENDA ITEM c-g Crrv or Lour CouNcrr, ConnMUNICATION TM AGENDA TITLE: IUIEETING DATE: PREPARED BY: Accept lmprovements Under Contract for Alley lmprovement Project - Phase 7 August 21,2019 Public Works Director RECOMMENDED ACTION Accept improvements under contract for Alley lmprovement Project - Phase 7. BACKGROUND INFORMATION: This project reconstructed the alley north of Elm Street, between Lee Avenue and Pleasant Avenue, the alley north of Walnut Street between, Lee Avenue and Pleasant Avenue, and the alley north of Elm Street, between Main Street and Stockton Street, as shown on Exhibit A. The project included approximately 14,000 square feet of pavement removal and replacement, 2,200 square feet of concrete removal and replacement with 900 square feet of new alley approach, 500 square feet of sidewalk, installation of 400 feet of concrete valley gutter, installation of storm drain system improvements, and other incidental and related work, all as shown on the plans and specifications for the above project. The project was awarded to Tom Mayo Construction, lnc., of Stockton, on March 6,2019, in the amount of $292,798. The contract has been completed in substantial conformance with the specifications approved by City Council. The final cost of the contract was $299,461.71. The difference between the original contract amount and final contract was due to one change order totaling $6,663.71, which is 2.22 percent of the original contract amount. Change Order No. 1 included the additional work requested by the City including removal of an additional 10 lineal feet of concrete curb and gutter in the alley north of Walnut Street, concrete removal in the planter/parkway, replacing a side inlet catch basin with a drop inlet catchbasin to avoid a conflict with existing underground utilities, and minor adjustment of various bid item quantities authorized by City staff ($6,663.71). The contract was completed within the original contract schedule. Photos of completed work are shown in Exhibit B. Following acceptance by the City Council, as required by law, the City Engineer will file a Notice of Completion with the County Recorder's office. The notice serves to notify vendors and subcontractors that the project is complete and begins their 30-day period to file a stop notice requiring the City to withhold payments from the prime contractor in the event of a payment dispute. FISCAL IMPAGT: The project will reduce maintenance costs in the reconstructed alleys. APPROVED: hen KIWP\PROJECTS\STREETS\AIley lmprovements Phase 7(201g)\CAccept.doc , City Manager atal2019 Accept lmprovements Under Contract for Alley lmprovement Project - Phase 7 August21,2019 Page2 FUNDING AVAILABLE This project was funded by 2018119 Community Development Block Grant funds. Charles E. Swi Jr Public Works Director Prepared by Jimi Billigmeier, Associate Civil Engineer cEs/sN/tdb Attachments cc:CDBG Program Specialist Tom Mayo Construction K:\WP\PROJECTS\STREETS\AIley lmprovements Phase 7(2019)\CAccept.doc 8t8t2019 Sperling Wy. De Force Av.CMain St.Pleasant Av.Oak St. Walnut St.Lee Av.Sacramento St.School St.Lockeford St.Hutchins St.Stockton St.Church St.Elm St. Locust St. Pine St. Alley Improvement Project - Phase 7Exhibit A Legend Project Locations µ400 0 400200 Feet EXHIBIT B Alley Improvement Project – Phase 7 BEFORE AFTER North of Elm Between Main Street and Stockton Street    North of Elm Between Lee Avenue and Pleasant Avenue      EXHIBIT B Alley Improvement Project – Phase 7 BEFORE AFTER North of Walnut Street Between Lee Avenue and Pleasant Avenue