Loading...
HomeMy WebLinkAboutAgenda Report - August 21, 2019 C-06AGENDA ITEM c-b Crrv or Lour Couxcrr, CovTMUNICATIoN ÏM AGENDA TITLE: MEETING DATE: PREPARED BY: Adopt Resolution Authorizing City Manager to Execute Agreements with the Following Entities for the Water Meter Program Phase 8: A. DSS Company dba Knife River Construction, of Stockton, for Construction ($4,441,635), and Authorize City Manager to Execute Change Orders (924,365) B. RMC Water and Environment, of Walnut Creek, for Engineering Services ($40,000) C. Terracon, of Lodi, for Construction Testing and Inspection Services ($3oo,ooo) D. Henderson Brothers Company, of Lodi, for On-Call Residential Plumbing Services ($1 50,000) August 21,2019 Public Works Director RECOMMENDED ACTION: Adopt resolution authorizing City Manager to execute agreements with the following entities for the Water Meter Program Phase 8: A. DSS Company dba Knife River Construction, of Stockton, for construction, in the amount of 54,441,635, and authorize City Manager to execute change orders, in an amount not to exceed $924,365 B. RMC Water and Environment, of Walnut Creek, for Engineering Services, in the amount of $40,000 C. Terracon, of Lodi, for construction testing and inspection services, in the amount of $300,000 D. Henderson Brothers Company, of Lodi, for on-call residential plumbing services, in the amount of $150,000 BACKGROUND INFORMATION: At the May 2,2007 City Council meeting, the Water Meter Retrofit Policy was adopted. The primary objectives of the Water Meter Retrofit Policy were to accelerate the installation of residential water meters and shorten the time period during which customers would be paying for water on a flat rate versus usage. A. Water Meter Program Phase I Construction Contract At the October 20,2010 City Council meeting, a seven-year construction phasing was approved and the property owner meter payment was capped at $300 per parcel. The project area for Phase 8 is presented in Exhibit A and includes the installation of 876 meters and the replacement/relocation of 18,490 feet (3.5 miles) of undersized water main primarily located in backyard easements. While Phase I is not the largest phase of the water meter program, over 570 of the 876 meter installations are type "E" meter installations. Type "E" meter installations consist of installing a new water meter service (and meter assembly) from a new water main that has been relocated from the backyard to the street. Based on experienced gained from prior water meter phases, these installations encounter unforeseen conditions (especially in older, more established neighborhoods) and often require plumbing modifications to the residence to accommodate the new service location. APPROVED Stephen K:\WP\PROJECTS\WATER\Meters\Water Meter Program Phase 8\CAward WMPPS.doc , City Manager ala2019 Adopt Resolut¡on Authorizing City Manager to Execute Agreements with the Following Ent¡ties for the Water Meter Program Phase 8:A. DSS Company dba Knife River Construction, of Stockton, for Construct¡on ($4,44f ,æ5), and Author¡ze City Manager to Execute Change Orders (e24,365)B. RMC Water and Environment, of Walnut Creek, for Engineering Services ($40,000)C. Terracon, of Lodi, for Construction Test¡ng and lnspection Serv¡ces ($300,000)D. Henderson Brothers Company, of Lodi, for On-Call Residential Plumbing Services ($150,000) August 21, 201 I Page 2 Plans and specifications for this project were approved on May 15, 2019. The City received four bids for the project on July 25,2019: Above/(Below)Bidder Location B¡d Estimate Engineer's Estimate $5,200,000.00 Knife River Construction Stockton $4,441,635.00 ($758,365.00) Teichert Construction Davis $4,843,240.00 ($356,760.00) California Trenchless Hayward $7,158,210.00 $1,958,210.00 McGuire and Hester Sacramento $8,071,601.00 $2,871,601.00 B. Engineering Services during construction for Water Meter Program Phase I Staff recommends RMC Water and Environment, of Walnut Creek, perform engineering services during construction. As the design engineer for this project, RMC Water and Environment is ideally suited to perform these duties for the Water Meter Program Phase 8. This is Task Order No. 10 to the Master Professional Services Agreement and is a time-and-materials contract with a not-to-exceed maximum of $40,000. C. Construction Testing and lnspection Services for Water Meter Program Phase I Staff recommends Terracon, of Lodi, to perform construction testing and inspection services for Water Meter Program Phase L Terracon will provide a minimum of two inspectors who will work under the direction and supervision of the City Construction Project Manager to provide quality control inspection and documentation of the daily work activities to insure compliance with contract requirements. ïhe number of inspectors may need to be adjusted, dependent on the contractor's work schedule. The total contract amount is based on time and materials with a not-to-exceed maximum of $300,000. D. On-Call Residential Plumbing Services for Water Meter Program Phase I Staff recommends Henderson Brothers Company, of Lodi, to perform on-call residential plumbing services related to the cleaning, adjustment, modification, or re-configuration of privately-owned plumbing fixtures and lines to mitigate changes in pressure and delivery associated with the relocation of the point of service for City water from the rear to the front of the residence. Past meter phases have used similar services that resulted in timely, complete, and cost-effective corrective measures for our customers. The total contract amount is based on time and materials with a not-to-exceed maximum of $150,000. Budset ltem Amount Construction Contract $4,441,635 RMC Water and Environment $40,000 Terracon $300,000 Henderson Bros. Companv, lnc.$150,000 Proiect Manasement (City Staff) -720 hours $74,000 City Provided Parts, Materials and Services $50,000 Su btotal Construction Proiect $5,055,635 1 5% Proiect Continoencv $758,346 Total Gonstruction Proiect $5,813,981 The total project cost is $5,813,981 and includes the contracts described above, Public Works Engineering staff costs, and contingency. KlWP\PROJECTS\WATER\Meters\Water Meter Program Phase 8\CAward l/VMPPS.doc 8t8t2019 Adopt Resolution Authoriz¡ng City Manager to Execute Agreements with the Following Entities for the Water Meter Program Phase 8:A. DSS Company dba Knife River Construct¡on, of Stockton, for Construction ($4,441,635), and Author¡ze City Manager to Execute Change Orders (924,365)B. RMC Water and Env¡ronment, of Walnut Creek, for Engineering Services ($40,000)C. Tenacon, ofLodi, forConstruction Test¡ng and lnspection Services ($300,000)D. Henderson Brolhers Company, of Lodi, for On-Call Residential Plumbing Serv¡ces ($150,000) August2l,2019 Page 3 FISCAL IMPAGT:Water main leak and service repairs will be reduced. Costs for reading the meters will be reduced, as they will be automatically read by the fixed network. FUNDING AVAILABLE Fiscal Year 2019/20 Budget: Water Capital Fund (56199000.77020): $5,980,000 Andrew Keys Deputy City Manager/lnternal Services Director Swimley, Public Works Director cEs/cES/tdb Attachments cc:Lance Roberts, Utilities Manager Gary Wiman, Construction Project Manager DDS Company dba Knife River Construction RMC Water and Environment Terracon Henderson Brothers Company K:\WP\PROJECTS\WATERUvleters\Water Meter Program Phase 8\CAward WMPPS.doc 81812019 UV99 UV12 UV12 Lodi Av. Elm St.Ham Ln.Turner Rd.Stockton St.H a r n e y L n . Vine St. Pine St.99Hutchins St.Cherokee Ln.Church St.Mills Av.Lower Sacramento Rd.Century Blvd. Lockeford St.BECKMAN RDINDIANA ST UP RRORANGESTWINERY RD Woodhaven Ln.TAYLOR RD UNNAMED RD HILDE LNHARNEY LNHARNEY LN Church St.99L o c k e f o r d S t . C e n t u r y B l v d .99Mills Av.V i n e S t .99Century Blvd. HARNEY LN EXHIBIT AWater Meter Project BoundaryPhase 8User: lchangPath: K:\WP\PROJECTS\WATER\Meters\Water Meter Program Phase 6\Proj_Bdy.mxd /Legend WMP Phase 8 RESOLUTTON NO. 2019-168 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE CONTRACT AND AUTHORIZING THE CITY MANAGER TO EXECUTE THE AGREEMENTS FOR THE WATER METER PROGRAM PHASE 8 PROJECT; AND FURTHER AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDERS WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on July 25, 2019, at 11:00a.m., for Water Meter Program Phase 8, described in the plans and specifications therefore approved by the City Council on May 15,2019; and WHEREAS, said bids have been checked and tabulated and a report thereof filed with the City Manager as follows: Bidder Knife River Construction Teichert Construction California Trenchless McGuire and Hester B¡d $4,441,635 $4,843,240 $7,158,210 $8,071,601 Above/(Below) Estimate ($758,365) ($356,760) $1,958,210 $2,871,601 WHEREAS, staff recommends awarding the contract for Water Meter Program Phase I construction to the low bidder, DSS Company dba Knife River Construction, of Stockton, in the amount of $4,441,635; and WHEREAS, staff recommends authorizing the City Manager to execute change orders to the construction contract with DSS Company dba Knife River Construction, of Stockton, in an amount not to exceed $924,365 WHEREAS, staff recommends RMC Water and Environment, of Walnut Creek, perform engineering services during construction, in an amount not to exceed $40,000; and WHEREAS, staff recommends Terracon, of Lodi, perform construction testing and inspection services for this project, in an amount not to exceed $300,000; and WHEREAS, staff recommends Henderson Brothers Company, of Lodi, perform on-call residential plumbing services for this project, in an amount not to exceed $150,000. NOW, THEREFORE, BE lT RESOLVED that the Lodi City Council does hereby award the contract for Water Meter Program Phase I to the low bidder, DSS Company dba Knife River Construction, of Stockton, California, in the amount of $4,441,635; and BE lT FURTHER RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute the contract and to execute change orders to the construction contract with DSS Company dba Knife River Construction, in an amount not to exceed $924,365; and BE lT FURTHER RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute Task Order No. 10 to the Master Professional Services Agreement for engineering services with RMC Water and Environment, of Walnut Creek, California, in an amount not to exceed $40,000; and BE lT FURTHER RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute the Professional Services .Agreement for construction testing and inspection services with Terracon, of Lodi, California, in an amount not to exceed $300,000; and BE lT FURTHER RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute the Professional Services Agreement for on-call residential plumbing services with Henderson Brothers Company, of Lodi, California, in an amount not to exceed $150,000. Dated: August 21,2019 I hereby certify that Resolution No. 2019-168 was passed and adopted by the City Council of the City of Lodi in a regular meeting held August21,2019, by the following vote: AYES COUNCIL MEMBERS - Johnson, Kuehne, Mounce, Nakanishi, and Mayor Chandler NOES COUNCIL MEMBERS - None ABSENT: COUNCIL MEMBERS - None ABSTAIN: COUNCIL MEMBERS - None NIFER RRAIOLO City Clerk 2019-168