HomeMy WebLinkAboutAgenda Report - July 17, 2019 C-17AGENDA ITEM c.17
Crrv or Lonr
Couucrl Con¡urunrcATroN
TM
AGENDA TITLE:
I,IEETING DATE:
PREPARED BY:
Adopt Resolution Authorizing City Manager to Execute lmprovement Deferral
Agreement for 927 I ndustrial Way
July 17,2019
Public Works Director
RECOMMENDED AGTION: Adopt resolution authorizing City Manager to execute lmprovement
Deferral Agreement for 927 lndustrial Way.
BACKGROUND INFORMATION: The owner of the property located at927 lndustrial Way has applied for
a tenant improvement building permit in an existing building. ln
accordance with Title 15, Chapter 15.44 of the Lodi Municipal Code, the
City may require the repairs/installation of public improvements if the value of the building improvements
exceeds $52,900. The owner is required to repair/install public improvements, consisting of removal and
replacement of the two driveways that do not comply with the Americans with Disabilities Act (ADA), as a
condition of Building Permit No. 20180816 issuance.
The property owner has agreed to complete the removal and replacement of the easternmost non-ADA
compliant driveway fronting lndustrial Way by December 31,2020, but requests to defer the removal and
replacement of the westerly driveway that is shared with the adjacent property (923 lndustrial Way) due to the
financial impact to their business.
The owner has signed the lmprovement DeferralAgreement and paid the necessary document preparation
and recording fees. The lmprovement Deferral Agreement requires the owner to pay for the design and
installation of the easternmost driveway no later than December 31 , 2020; and defers the westerly shared
driveway until improvements lor 923lndustrial Way have been requested or as determined by the Public
Works Director or City Council. The estimated cost of the deferred improvements is $70,000.
Considering the financial impact on his business at this time and the owner's cooperation to complete a
portion of the frontage improvements within one year, Staff recommends authorizing the City Manager to
execute the lmprovement Deferral Agreementfor 927 lndustrial Way.
FISCAL IMPACT:Not applicable.
Not applicable.
Charles E. Swimley, Jr
Public Works Director
Prepared by Denise Wiman, Sr. Engineering Technician
CES/DWtdb
Attachment
cc:City Attorney
Deputy Public Works Director/City Engineer
APPROVE
FUNDING
¡l a
KIWP\DEV_SER\ Deferral Agreements\Cc_g27 lndustr¡al.doc
, City Manager
7t8t2019
RESOLUTTON NO. 2019-133
A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING
THE CITY MANAGER TO EXECUTE AN IMPROVEMENT
DEFERRAL AGREEMENT FOR 927 INDUSTRIAL WAY
WHEREAS, the owner of the property located at 927 lndustrial Way has applied for a
tenant improvement building permit in an existing building; and
WHEREAS, the property owner is required to repair/install public improvements,
consisting of removal and replacement of the two driveways that do not comply with the
Americans with Disabilities Act (ADA), as a condition of Building Permit No. 20180816 issuance,
as set forth Lodi Municipal Code Chapter 15.44; and
WHEREAS, the property owner has agreed to complete the removal and replacement of
the easternmost non-ADA compliant driveway fronting lndustrial Way by December 31,2020;
however, requests to defer the removal and replacement of the westerly driveway that is shared
with the adjacent property (923 lndustrial Way) due to the financial impact to their business at
this time; and
WHEREAS, the property owner has signed the Agreement and paid the necessary
document preparation and recording fees; and
WHEREAS, the lmprovement Deferral Agreement requires the owner to pay for the
design and installation of the easternmost driveway no later than December 31 , 2020; and
defers the westerly shared driveway until improvements for 923 lndustrial Way have been
requested or as determined by the Public Works Director or City Council; and
WHEREAS, staff recommends authorizing the City Manager to execute the
lmprovement Deferral Agreement for 927 lndustrial Way.
NOW, THEREFORE, BE lT RESOLVED that the Lodi City Council does hereby
authorize the City Manager to execute the lmprovement Deferral Agreement for
927 lndustrialWay.
Dated: July 17 , 2019
I hereby certify that Resolution No. 2019-133 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held July 17, 2019 by the following vote:
AYES: COUNCIL MEMBERS - Johnson, Kuehne, Mounce, Nakanishi, and
Mayor Chandler
NOES: COUNCIL MEMBERS - None
ABSENT: COUNCIL MEMBERS - None
ABSTAIN: COUNCIL MEMBERS - None
NI
2019-133
Clerk
F