Loading...
HomeMy WebLinkAboutAgenda Report - August 16, 2000 E-08CITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: Purchase of Padmount Transformers ($181,546.91) MEETING DATE: August 16, 2000 PREPARED BY: Electric Utility Director RECOMMENDED ACTION: That the City Council adopt the attached resolution awarding the bid for the purchase of 17 single-phase, and 17 three-phase padmount transformers to the bidders whose proposals and equipment meet City of Lodi specifications, and whose transformers are expected to yield the lowest overall life -cycle costs, Western States Electric, Portland, OR 6 ea 75KVA 240/120V 1 -phase $ 8,352.78 2 ea 150KVA 208Y/120V 3-phase $ 8,492.86 3 ea 500KVA 208YI120V $ 23,561.69 1 ea 1000KVA 208Y/120V $ 12,866.43 1 ea 300KVA 480YI277V $ 5,238.81 3 ea 500KVA 480YI277V $ 23,002.47 5 ea 1500KVA 480Y/277V $ 76,066.11 $157,581.15 Howard Industries, Laurel, MS 2 ea 225KVA 208Y/1 20V 3-phase $ 11,733.98 Ermco, Dyersburg, TN 11 ea 37.5KVA 240/120V 1 -phase $ 12,231.78 $181,546.91 BACKGROUND INFORMATION: On May 19, 1999, the City Council approved specifications and author- ized advertisement for bids for polemount and padmount transformers as necessary to meet the Department's needs through Fiscal Years 1999-2001. On July 26, 2000, bids for 32 padmount transformers were opened and total life -cycle costs were evaluated. (Life -cycle costs are the combined total of purchase price plus cost of operation based on estimated power loss during the projected life of the transformer. Proposals are also evaluated on the basis of compliance with equipment and bid specifications. Failure to comply with both may lead to disqualification of the bid). A summary of the bid evaluation is attached as Exhibit A. Subsequent to completion of the evaluation, the need for two additional 500KVA 480Y/277V transformers became known, increasing the 500KVA quantity requirement from one to three, and the total number of padmounts recommended for purchase from 32 to 34. These transformers will be used to serve new industrial, commercial, and residential loads, and to replenish the department's inventory. Some of the locations planned for installation are Guild Avenue and Victor Road, the Downtown Theater and Parking Garage, the Pac Bell building, the Grape Festival expansions, and various residential subdivisions in town. The two additional transformers will be used to serve new loads at Pluglt on Pine Street, and Valley Industries on South Stockton Street. FUNDING: Electric Utility Dept 2000-2001 FY Operating P an, Page E-25 Funding: Vicky McAthie, Finance Director Alan N. Vallow, Electric Utility Director Prepared by Joel Harris, Purchasing Officer APPROVED: H. Dixon Flynn -- ity Manager PAD M 8162000 08/08/00 Exhibit A Transformer Bid Evaluation Bid Opening: July 26, 2000 Page 1 Padmount Transformers Padmount Tax (factor): 1.0775 6 28 1.80 Vendor Unit Extended Price No Load Loss $!waft: 3.75 No Load Load Cost of Life Cycle Delivery Height Impedance July 27, 2000 Price $ Load Loss $/watt: 1.25 Loss (watts) Loss (watts) Loss value Loss value Losses $ Cost $ (weeks) (Inches) Bid Item 1: 37.5 kVA, 2401120 Volt, Single Phase Pad Western States (Cooper) 1,292.00 7,752.00 Number of units: 11 687 2,520.00 28 1.50 Vendor Unit Extended Price No Load Load No Load Load Cost of Life Cycle Delivery Height Impedance 8,197.50 Price $ Price $ witax $ Loss (watts) Loss (wafts) Loss value Loss value Losses $ Cost $ (weeks) (inches) % Enrico 1,032.00 11,352.00 12,231.78 77 308 3,176.25 4,235.00 7,411.25 19,643.03 12-14 28 1.60 GE Supply 985.00 10,835.00 11,674.71 79 365 3,258.75 5,018.75 8,277.50 19,952.21 10-12 30 1.88 western States (Cooper) 999.00 '10,989.00 11,840.65 88 334 3,630.00 4,592.50 8,222.50 20,063.15 10-12 24 1.52 Central Moloney 1,028.00 11,308.00 12,184.37 72 379 2,970.00 5,211.25 8,181.25 20,305.62 13 29 1.68 Wesco 1,110.00 12,210.00 13,156.28 77 297 3,176.25 4,083.75 7,260.00 20,416.28 12 32 1.68 Howard Industries (AC) 1,216.00 13,376.00 14,412.84 32 342 1,320.00 4,702.50 6,022.50 20,435.14 16-18 24 2.66 Kuhlman Electric Corp. 1,029.00 11,319.00 12,196.22 84 365 3,465.00 5,018.75 8,483.75 20,679.97 8 27 1.70 Howard Industries 1,039.00 11,428.00 12,314.75 83 367 3,423.75 5,046.25 8,470.00 20,784.75 16-18 24 1.75 Western States (Pauwels) No Bid No Load Load No Load Load Cost of Life Cycle Delivery Height Impedance Bid Item 2:75 kVA, 2401120 Volt, Single Phase Pad Number of units: 6 28 1.80 Vendor Unit Extended Price No Load Load No Load Load Cost of Life Cycle Delivery Height Impedance Price $ Price $ wAax $ Loss (watts) Loss (watts) Loss value Loss value Losses $ Cost $ (weeks) (Inches) % Western States (Cooper) 1,292.00 7,752.00 8,352.78 112 687 2,520.00 5,152.50 7,672.50 16,025.28 10-12 24 2.00 Emrco 1,237.00 7,422.00 7,997.21 129 706 2,902.50 5,295.00 8,197.50 16,194.71 12-14 28 1.90 Kuhlman Electric Corp. 1,365.00 8,190.00 8,824.73 126 623 2,835.00 4,672.50 7,507.50 16,332.23 8 27 1.60 Howard Industries (AC) 1,604.00 9,624.00 10,369.86 46 667 1,035.00 5,002.50 6,037.50 16,407.36 16-18 24 2.15 Howard Industries 1,388.00 8,328.00 8,973.42 135 631 3,037.50 4,732.50 7,770.00 16,743.42 16-18 24 2.13 Wesco 1,436.00 8,616.00 9,283.74 143 775 3,217.50 5,812.50 9,030.00 18,313.74 12 32 1.99 G E supply 1,188.00 7,128.00 7,680.42 143 636 3,217.50 4,770.00 7,987.50 15,687.92 6-10 30 1.48 ` Central Moloney 1,305.00 7,830.00 6,436.83 133 604 2,992.50 4,530.00 7,522.50 15,959.33 13 29 1.99 " Western States (Pauwels) No Bid Bid Item 3: 150 kVA, 208YI120 Volt, Three Phase Pad Number of units: 2 65 2.00 Vendor Unit Extended Price No Load Load No Load Load Cost of Life Cycle Delivery Height Impedance Price $ Price $ wAax $ Loss (watts) Loss (wafts) Loss value Loss value Losses $ Cost $ (weeks) (inches) % Western States (Pauwels) 3,941.00 7,882.00 8,492.86 277 1181 2,077.50 2,952.50 5,030.00 13,522.86 10-12 58 2.65 Howard Industries (AC) 4,340.00 8,680.00 9,352.70 123 1392 922.50 3,480.00 4,402.50 13,755.20 8-10 51 2.27 Western States (Cooper) 3,875.00 7,750.00 8,350.63 304 1326 2,280.00 3,315.00 5.595.00 13,945.63 10-12 50 3.57 Howard Industries 3,872.00 7,744.00 0,3".16 265 1455 1,987.50 3,637.50 5,625.00 13,969.16 8-10 51 2.12 Wesco 3,526.00 7,052.00 7,598.53 292 1793 2,190.00 4,482.50 0,672.50 14,271.03 11 42.5 3.65 GE Supply 5,154.00 10,308.00 11,106.87 106 1086 795.00 2,715.00 3,510.00 14,616.87 14 61 3.79 Emrco 4,751.00 9,502.00 10,238.41 271 1320 2,032.50 3,300.00 5.332.50 15,570.91 14-18 49 3.50 Central Moloney No Bid Kuhlman Electric Corp. No Bid Transformer Eval 072700 pads.xls 1 Bid Item 5: 500 kVA, 20OW12O Voll, Three Phase Pad Number of units: 3 75 4.00 Vendor Unit Extended Price Exhibit A Load No Load Load Cost of Life Cycle Delivery Height Impedance Price $ Price $ wttax $ Loss (watts) Loss (watts) Page 2 Loss value Losses $ Cost S (weeks) (inches) % Western States(Pauwels) 7,289.00 21,867.00 23,561.69 592 3657 6,660.00 Padmount Transformers Bid Item 4: 225 kVA, 208YN20 Volt, Three Phase Pad 10-12 66.75 Number of units: 2 6,730.00 20,190.00 21,754.73 65 3.50 Vendor Unit Extended Price No Load Load No Load Load Cost of Life Cycle Delivery Height Impedance 13,005.00 16,481.25 Price $ Price $ wRax $ Loss (watts) Loss (watts) Loss value Loss value Losses $ Cost S (weeks) (inches) % Howard Industries (AC) 5,445.00 10,890.00 11,733.98 177 1683 1,327.50 4,207.50 5,535.00 17,268.98 8-10 57 3.71 Western States (Pauwels) 4,693.00 9,386.00 10,113.42 367 1783 2,752.50 4,457.50 7,210.00 17,323.42 10-12 58 3.74 Howard Industries 4,817.00 9,634.00 10,380.64 402 1647 3,015.00 4,117.50 7,132.50 17,513.14 8-10 51 3.93 Western States (Cooper) 4,179.00 8,358.00 9,005.75 502 1939 3,765.00 4,847.50 8,612.50 17,618.25 10-12 50 3.80 Wesco 4,200.00 8,400.00 9,051.00 401 2343 3,007.50 5,857.50 8,865.00 17,916.00 11 42.5 4.00 G E Supply 4,777.00 9,554.00 10,294.44 392 2184 2,940.00 5,460.00 8,400.00 18,694.44 14 61 4.15 Emrco 5,910.00 11,820.00 12,736.05 337 1844 2,527.50 4,610.00 7,137.50 19,873.55 14-18 49 3.70 Central Moloney No Bid Kuhlman Electric Corp. No Bid Bid Item 5: 500 kVA, 20OW12O Voll, Three Phase Pad Number of units: 3 75 4.00 Vendor Unit Extended Price No Load Load No Load Load Cost of Life Cycle Delivery Height Impedance Price $ Price $ wttax $ Loss (watts) Loss (watts) Loss value Loss value Losses $ Cost S (weeks) (inches) % Western States(Pauwels) 7,289.00 21,867.00 23,561.69 592 3657 6,660.00 13,713.75 20,373.75 43,935.44 10-12 66.75 4.21 Western States (Cooper) 6,730.00 20,190.00 21,754.73 743 3769 8,358.75 14,133.75 22,492.50 44,247.23 10-12 50 4.31 Howard Industries (AC) 9,059.00 27,177.00 29,283.22 309 3468 3,476.25 13,005.00 16,481.25 45,764.47 8-10 69 4.36 Wesco 6,595.00 19,785.00 21,318.34 662 4661 7,447.50 17,478.75 24,926,25 46,244.59 11 50.5 5.35 Howard Industries 7,467.00 22,401.00 24,137.08 812 3492 9,135.00 13,095.00 22,230.00 46,387.08 8-10 63 4.20 G E Supply 9,655.00 28,965.00 31,209.79 254 3361 2,857.50 12,603.75 15,461.25 48,671-04 14 65 4.69 Emco 7,890.00 23,670.00 25,504.43 773 4274 8,698.25 16,027.50 24,723.75 50,228.18 14.18 49 4.60 Central Moloney No Bid Kuhman Electric Corp. No Bid Bid Item 8: 1000 kVA, 206Y1120 Volt, Three Phase Pad Number of units: 1 90 5.30 Vendor Unit Extended Price No Load Load No Load Load Cost of Life Cycle Delivery Height Impedance Price $ Price $ whax $ Loss (watts) Loss (watts) Loss value Loss value Losses $ Cost $ (weeks) (inches) % Western States(Pauwels) 11,941.00 11,941.00 12,866.43 989 7562 3,708.75 9,452.50 13,161.25 26,027.68 12-14 72 5.75 Wesco 11,180.00 11,180.00 12,046.45 1056 8121 3,960.00 10,151.25 14,111.25 26,157.70 11 70,5 5.76 G E Supply 15,059.00 15,059.00 16,226.07 434 6872 1,627.50 8,590.00 10,217.50 26,443.57 14 77 5.73 Western States (Cooper) 11,079.00 11,079.00 11,937.62 1606 7299 6,022.50 9,123.75 15,146.25 27,083.87 10-12 64 5.74 Howard Industries 12,209.00 12,209.00 13,155.20 1102 7896 4,132.50 9,870.00 14,002.50 27,157.70 8-10 63 5.75 Central Moloney No Bid Emrco No Bid Howard Industries (AC) No Bid Kuhlman Electric Corp. No Bid Transformer Eval 072700 pads.xis 2 - Number of units: 5 Number of units: 1 5.30 Vendor 75 4.00 Vendor Unit Extended Exhibit A No Load Load No Load Load Cost of Life Cycle Delivery Height Impedance % Price $ Price $ Page 3 Loss (watts) Loss (watts) Loss value Loss value Losses $ Cost $ (weeks) (inches) %, Western States (Pauwels) 7,116.00 7,116.00 7,687.49 Padmount Transformers Bid Item 7: 300 kVA, 480Y/277 Volt, Three Phase Pad 2,501.25 3,760.00 Number of units: 1 10-12 61.5 65 3.50 Vendor Unit Extended Price No Load Load No Load Load Cost of Life Cycle Delivery Height Impedance 8,466.00 Price $ Price $ w/tax $ Loss (watts) Loss (watts) Loss value Loss value Losses $ Cost $ (weeks) (inches) 4.71 Western States (Cooper) 4,862.00 4,852.00 5,238.81 532 1868 1,995.00 2,335.00 4,330.00 9,568.81 10-12 50 4.32 Western States (Pauwels) 5,532.00 5,532.00 5,960.73 433 1956 1,623.75 2,445.00 4,068.75 10,029.48 10-12 58 3.64 Howard Industries (AC) 6,277.00 6,277.00 6,783.47 203 2178 761.25 2,722.50 3,483.75 10,247.22 8-10 57 4.24 Howard Industries 5,436.00 5,436.00 5,857.29 528 2034 1,980.00 2,542.50 4,522.50 10,379.79 8-10 51 4.21 G E Supply 8,020.00 6,020.00 6,486.55 137 2752 513.75 3,440.00 3,953.75 10,440.30 14 65 4.40 Wesco 5,252.00 5,252.110 5,659.03 455 2517 1,706.25 3,148.25 4,852.50 10,511.53 11 42.5 3.86 Ermco 6,218.00 6,218.00 6,699.90 381 2033 1,428.75 2,541.25 3,970.00 10,669.90 14-18 49 4.70 Central Moloney No Bid Kuhlman Electric Corp. No Bid Bid Item 0: 500 kVA, 4BOY1277 Volt, Throe Phase Pad Number of units: 5 Number of units: 1 5.30 Vendor 75 4.00 Vendor Unit Extended Price No Load Load No Load Load Cost of Life Cycle Delivery Height Impedance % Price $ Price $ witax $ Loss (watts) Loss (watts) Loss value Loss value Losses $ Cost $ (weeks) (inches) %, Western States (Pauwels) 7,116.00 7,116.00 7,687.49 667 3008 2,501.25 3,760.00 6,261.25 13,928.74 10-12 61.5 4.08 Western States (Cooper) 6,520.00 6,520.00 7,025.30 652 3681 2,445.00 4,601.25 7,046.25 14,071.55 10-12 5o 4.77 Howard Industries (AC) 8,466.00 8,466.00 9,122.12 302 3273 1,132.50 4,091.25 5,223.75 14,345.87 8-10 63 4.71 G E Supply 9,220.00 9,220.00 9,934.55 260 2814 975.00 3,517.50 4,492.50 14,427.05 14 65 4.28 Wesco 6,390.00 6,390.00 6,885.23 598 4459 2,242.50 5,573.75 7,816.25 14,701.48 11 46.5 5.12 Howard Industries 7,692.00 7,692.00 8,288.13 781 2808 2,928.75 3,510.00 6,438.75 14,726.88 8-10 63 4.29 Ensco 7,466.00 7,466.00 8,044.62 754 3425 2,827.50 4,281.25 7,108.75 15,153.37 14-18 49 4.7 Central Moloney No Bid Kuhlman Electric Corp. No Bid Bid Item 9: 1500 kVA, 480Y127T Volt, Three Phase Pad Number of units: 5 90 5.30 Vendor Unit Extended Price No Load Load No Load Load Cost of Life Cycle Delivery Height Impedance Price $ Price $ wRax $ Loss (watts) Loss (watts) Loss value Loss value Losses $ Cost $ (weeks) (inches) % Western States (Pauwels) 14,119.00 70,595.00 76,066.11 1346 8328 25,237.50 52,050.00 77,287.50 153,353.61 12-14 72 5.78 G E Supply 17,285.00 86,325.00 93,015.19 554 8623 10,387.50 53,893.75 64,281.25 157,296.44 14 77 5.78 Wesco 12,710.00 63,550.00 88,475.13 1609 9704 30,168.75 60,650.00 90,818.75 159,293.88 11 66.5 5.76 Western States (Cooper) 14,766.00 73,830.00 79,551.83 1811 7873 33,956.25 49,206.25 83,162.50 162,714.33 12-14 72 5.75 Howard Industries 15,074.00 75,370.00 81,211.18 1683 8727 31,556.25 54,543.75 86,100.00 167,311.18 8-10 63 5.75 Central Moloney No Bid Ermco No Bid Howard Industries (AC) No Bid Kuhlman Electric Corp. No Bid (AC) : Amorphous Core • Does not meet specifications (Height and Impedance) •` Does not meet specifications (Height) Transformer Eval 072700 pads.xls 3 RESOLUTION NO. 2000-144 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE BID FOR THE PURCHASE OF PADMOUNT TRANSFORMERS WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on July 26, 2000 at 11:00 a.m. for the purchase of 17 single-phase, and 17 three-phase padmount transformers for the Electric Utility Department, described in the specifications therefore approved by the City Council on May 19, 1999; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as shown on Exhibit A attached; and WHEREAS, the City Manager recommends that award of the bid for the purchase of 17 single-phase, and 17 three-phase padmount transformers for the Electric Utility Department, be made to the bidders whose propgsals and equipment meet City of Lodi specifications, and whose transformers are expected to yield the lowest overall life -cycle costs, to wit: Western States Electric, Portland, OR Howard Industries, Laurel, MS Ermco, Dyersburg, TN 6 ea 75KVA 240/120V 1 -phase $ 8,352.78 2 ea 150KVA 208Y/120V 3-phase $ 8,492.86 3 ea 500KVA 208Y/120V $ 23,561.69 1 ea 1000KVA 208Y11 20V $ 12,866.43 1 ea 300KVA 480YI277V $ 5,238.81 3 ea 500KVA 480Y/277V $ 23,002.47 5 ea 1500KVA 480Y/277V $ 76.066.11 $157,581.15 2 ea 225KVA 208YI120V 3-phase $ 11,733.98 11 ea 37.5KVA 240/120V 1 -phase $ 12,231.78 $181,546.91 NOW, THEREFORE, BE IT RESOLVED by the Lodi City Council that the award of the purchase of 17 single-phase, and 17 three-phase padmount transformers for the Electric Utility Department, be and the same is hereby awarded to the above-described responsible bidders, in the total amount of $181,546.91. Dated: August 16, 2000 I hereby certify that Resolution No. 2000-144 was passed and adopted by the City Council of the City of Lodi in a regular meeting held August 16, 2000, by the following vote: AYES: COUNCIL MEMBERS — Hitchcock, Land, Nakanishi, Pennino and Mann (Mayor) NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None SUSAN J. BL�TON City Clerk 2000-144 D Transformer Old Evaluatlon Dld OPOnl119: July 26, 2000 Padmount Tax (laclur): 1.0715 No Load Loss Wall: 3.75 July 27, 2000 Load Loss Wall: 1.25 Exhibit A Page ] Padmount Transformers Did flons 1: 31.6 Wk. 2401120 Voll, Single Phase Pad • Number otunils: 11 28 1.50 Vendor Unit Extended Price No Load load No Load Load Cost of Lila Cycle Delivery Height Inipadance Price Price $ Price Il wllax $ Loss (waits) Loss (wails) Loss value Loss value Losses 5 Cost S (weeks) (Inches) x Fresco 1,032.00 11,352.00 12,231.18 77 308 3,178.25 4,235.00 7,411.25 19,843.03 12-14 28 1,60 GE Supply 985.00 10,635.00 11,614.11 79 365 3,258.75 5,018.75 8,277.50 19.932.21 10.12 30 1.88 western states (Cooper) 999.00'10,989.00 Mamas B8 334 3,630.00 4.592.50 8.222.50 20,063.15 10.12 24 1.52 Central Moloney 1,028.00 11,308.00 12,184.31. 72 379 2.970.00 5.211.25 8,161.25 20.385.62 4 13 29 1.68 Wesco 1.110.00 12,210.00 13,158.26 77 297 3.176.25 4,083.75 7.260.00 20,416.26 12 32 1.68 "award Industries (AC) 1.216.00 13,378.00 14,412.64 32 342 1,320.00 4.702.50 8,022.50 20.435.14 18.18 24 2.68 Kuhlman Electric Corp, 1,029.00 11.319.00 12,108.22 84 305 3.465.00 5,018.75 8.483.75 20.679.97 a 27 1.70 Huward industries 1,039.00 11.429.00 12,314.75 83 361 3,423.75 5,046.25 8.470.00 ' 20,164.75 16-10 24 1.75 Western Slates (Pauwels) No Did 14.18 49 3.50 Central Moloney No Bid flld Item 2: 75 kVA, 2401120 Volt. Single Plisse Psd Number of unils: 0 Kul dinan Electric Corp. - 28 1.80 Vendor Unit Extended Price No Load Load No Load Load Cost of Ula Cycle Delivery Helgld Ingsedance PALO f Price S witax 3 Loss (waits) Loss (waits) Loss value Loss value Losses $ Cost S (weeks► (kwisas) % Western Stiles (Cooper) 1,292.00 1.152.00 6,352.78 112 691 2.520.00 5.152.50 7,672.50 16,025.26 10.12 24 2.00 Efmco 1,237.131 1,422.00 7,007.21 129 706 2.902.50 5,205.00 a, 197.50 18.194.11 12.14 28 1.90 KuNman Electric Corp. 1,365.00 8.100.00 6,824.13 126 623 2,835.00 4.672.50 7.507.50 16.132.23 a 27 1.60 Itoward Industrles (AC) 1.604.00 9,824.00 10,369.66 40 667 1.035.00 5,002.50 6,037.50 16,407.36 16.18 24 2.15 )toward Industries 1,388.00 8,328.00 6,013.42 135 031 3,037.50 4,732.50 7,770.00 18,743.42 116 -la 24 2.13 Wesco 1,436.00 8,618.00 9,283.74 143 775 3,217.50 5,812.50 0,030.00 16,313.14 12 32 1.99 G E Supply I,t8800 7.128.00 7,660.42 143 036 3.217.50 4,710.00 7,087.50 15,661.62 8.10 30 1.40 Control Mulunuy 1,305.00 7.630.00 6.436.03 133 004 2,092.50 4.530.00 7.522.50 15,950.31 13 20 1.09 Western Status (Pauwels) Nu Did Bld hem 3: 150 kVA, 206YI120 Voll, Three Phase Pad Number of units: 2 05 2.00 Vendor Unit Extended Price No Load Load No Load Load Cost of LIN Cycle Delivery Helghl Impedance Price $ Price S wAnx S Loss (walls) Loss (walls) Loss value Loss value Losses S Cost S (weeks) (inches) % Western Slates (Pauwels) 3,041.00 7,882.00 6,492.00 277 1181 2,071.50 2,952.50 5,030.00 13,522.88 10-12 58 2.55 [toward Industries (AC) 4,340.00 6,880.00 9,352.70 123 1302 922.50 3,480.00 4,402.50 13,155.20 a- to 51 2.21 weslemrStates (Cooper) 3,675.00 7,750.00 0,350.63 704 1326 2,280.00 3,315.00 5.595.00 13,945.63 10.12 5o 3.57 Howard Industries 3,872.00 7,744.00 6,344.10 265 1455 1,967.50 3,837.50 5,625.00 13,909.10 8.10 51 2.12 Wesco 3,526.00 7,052.00 7,59a.53 292 1793 2,100.00 4,402.50 8,872.50 14,271.83 11 42.5 3.85 GE Supply S. 154.00 10.308.00 11,108.11 100 1066 105.00 2.115.00 3,510.00 14,618.01 14 at 3.70 Enrico 4.751.00 0,502.00 10,238.41 271 1320 2,032.50 3,300.00 5,332.50 15,570.91 14.18 49 3.50 Central Moloney No Bid Kul dinan Electric Corp. No Did Tianslontset Cva1012100 padlAs N i 4J i O N O 2S i Q � 4-1 41 C r. N Q O 4) c Lua-C. a4 ax sirieiri�.'ri Y� c pp O N r � f os novo v ]A~ a A n^ w 1 n U n N P a e�N e P O ^ r w N r r N S0�1SSOrtf N p N ^ O n N h U J roi pw �<eo is .- O Sim NAS O p p O - J 7 p p p p 70 � 1fl �f'! S O S O Ifs O > Nhwl.� s w J rn�+on e e < n T o« J w M J N �O=Ov et n O ; = O J O N E wI O f N w Of Oa.Of 0 m ^n a •+mow e Y n �.�ti eow1� w a p o omveo 'o w ui C o m m o 0 p 0 ^ P M O O O O S O O s 0 f coO O CON A Q O O O Q e<< 4<< h Z Z 0 n « Y Q J O w O L O U _ C, U o NA N y fU C ? C 2 a 3 a '3 °33ou7uY S p � qY� vi•i wi�vs 9 H a rn e n� Q �z m 9- � 3 N f M O O O O N ti N n O N V nvv+oe�o L♦ J N N m N N� ry ^ M1 O ^ O ^ O Z O O O nN. 7 � OI H M1 1f1 ri � a3 e;=ST;oSo 7 Z 9 � O rN.rti OStHv pj vi Id i i..O N T< n r q O m Z p oe Cl 1�PNe J N H e m O g O T O ; J N O J n n H^n.00 Nei. J ; O '^ 2 O J P^ N f e p N e N n 0 1r N^ e e w P T w Q w d M O S S S O S S w o •• gis M J vi o ui 4. NNN Q-NHN �" M OOS 00 S 03:2 Y 1 q O a O H O 0 0 0 H O d 8� CL > o e ? u w S c m yj ' w O� j a O Gul X41 C � sS OW "J 7 j fi 3 c a u n N N z_ s °101,uunc " 1. T n H Y �+e. r. iei � � ri ei � ri ai a J J A ti3 os w Oa > o O ; O V A N e A rte+ w:w nnw O V eeo�.w J N N N N N M N N O M p w N_ N�1 N10 N mIV O O J a O O O p pi m O O J 7 p o = 7 O O b h n N J� OCnIV CI 2 e riri�o f J e 3 O J w O J a O s = O O ; - J O Z O J ^ = n a O M O N O O O w N � • e T ^ n 7 C# N r O'+ w - � CL O pp w 9 w o S 0 0 0 b $ Y 0 o o n Y V - - � • - - t � 0000 p S:P 7 7 O - u T O1ii � pm OCa - nzzzz T 0 N d 3 n v d 0 fA q 7 O ? �u sy3a _, ZZ c 5:C7�SUW.Y N hansfolm87 EYSI 072700 pads.xii 3 i _ n Exhibit n Page 3 Padmount Transformers Old lien 7: 300 kVA, 4SOY1277 Voll, Three Phase Pad Number of unit S: 1 65 3.50 Vendor Unit Extended Price No Load Load No Load Load Cost of Lite Cycle Delivery Height Impedance Price S Price 5 wnax S Loss (waits) Loss (walls► Loss value Loss value Losses S Cost $ (weeks) (Inches) % Western slates (Cooper► 4,662.00 4,802.00 6,231.61 532 sees 1,995.00 2,335.00 4.330.00 9,566.91 10.12 s0 4.32 Western Stales (Peuwels) 5,532.00 5,532.00 5,960.73 413 1050 1,023.75 2,44500 4.008.75 10,029,46 10.12 56 3.84 Howard Industries (AC) 8,277.00 0,277.00 6,761.41 203 2118 781.25 s 2,722.50 3,483.75 10,247.22 B-10 57 4.24 Howard Indusldes 5,430.00 5,436.00 5,651.20 529 2034 1,980.00 2,542.50 4,522.50 10,379.19 B-10 51 4.21 G E Supply 8,020.00 6.020.00 6,466.S5 131 2752 511.75 3,440.00 3,953.75 10,440.30 14 65 4.40 Wesco 5,252.00 5,252.Oq 5,656.03 455 2517 1,706.25 3,145.25 4.852.50 10,511.51 11 42.5 3.86 Ernlco 8,218.00 6,2t6.00 6,699.90 381 2033 1,4211.75 2,541.25 3,070.00 10,0169.10 14.18 49 4.70 Central Moloney No Old • Kuldnnan Electric Culp, No Did Did lion, 8: $oo kVA, 4a0Y/277 Volt, Tluee Phase Pad Nunnbur of U1111 1: 1 4 75 4.00 Vendor Unit Extended Mice No Load Load No Load Laid Cost of Llle Cycle Delivery Haight Impedance Price S Price S wnax $ LOS& (walls) Loss (walls) Loss value Loss value Losses S Cost $ (weeks) (Inches) % Western States(Pauwels) 7,1(6.00 7,119.00 7,081.49 067 JOD8 2,501.25 3,760.00 0,201.25 13,926.14 10-12 61.5 4.09 Westurn States (Couper) 8.520.00 8,520.00 1,025.30 652 3081 2,445.00 . 4,801.25 7,040.25 14,011.55 10.12 50 4.77 lluwardInduslrles(AC) 8.460Ao 8,486.00 0,122.12 302 3273 1,132.50 4,091.25 5,223.75 14,345.61 9-10 63 4.71 G E Supply 9,220.00 9,220.00 9,934,55 260 2614 975.00 3,517.50 4,492.50 14,421.05 14 65 4.26 Wesco 8,390,00 0,390.00 6,865.23 594 4459 2,242.50 5,573.75 7,810.25 14,701.48 11 46.5 5.12 Itoward lrklUSUIUS 7692.00 1,892.00 0,266,13 lei 2608 2,928.75 3,510.00 0.436.75 14,126.86 11.10 03 4.29 Ennca 7,46000 7,46800 1,044.62 75.1 3425 2,1127.50 4,281.25 7,109.75 15,153.37 14.18 49 4.7 Cenlrat Mulorwy 140 old Kulanan Eleddc Corp. Nu okl Dldhem9: 1$00 kVA. 440YI211Volt. ThreePllnaPad Number Ofunits: 5 110 5.30 V endur Unit Exlen ded Pdce No Load Load No Load Load Cost of Life Cycle Dullvery 1 ieloht Impedance Price S Price S wnax S Lost (wails) Lass (walls) Loss value Loss value Losses $ Cost S (weeks) (inelses) % Western Slates (11auwels) t4,110.00 70,595.00 76,0116.11 13.10 0328 25,?31.50 52,050.00 77,267,50 153,351,61 12.14 12 5.18 G 1: Supply 17,205.00 80.325.00 63,011.19 554 8023 18,361.50 57,693.75 64,261.25 157,290.44 14 17 5.76 WL'1C0 12,710.00 63,550.00 ee,41s.13 1609 0704 30,168.75 60,650.00 90,018.75 159,297.88 11 08.5 5.76 WeslamStales (Cooper) 14,768.00 73,830.00 71,551.83 telt 1873 33,958.25 49,206.25 83,102,50 162,714.33 12.14 72 5.75 tluwaldlnduSilies 15,074,00 75,370,00 111,211.111 1683 8727 31,558.25 54,543.75 86,100.00 157,311.18 8.10 63 5.75 Central Mol000y No Oki [1111co No Old llowaid Industries (AC) No Bid Ku)dman Elepile Corp, No Bid (AC) : Amorphous Core Does not noel Specifications (lielihl and Impedance) Does not 111861 specifications 111819111) hansfolm87 EYSI 072700 pads.xii 3