Loading...
HomeMy WebLinkAboutAgenda Report - June 19, 2019 C-09AGENDA ITEM c-q Crrv or Lonr CouNcrr, ConnMUNrcATIoN AGENDA TITLE:Adopt Resolution Awarding Contract for Candy Cane Park - 2019 lmprovements to A. M. Stephens Construction Co., lnc., of Lodi ($347,600), Authorizing City Manager to Execute Change Orders ($102,400), and Appropriating Funds ($322,000) MEETING DATE: June 19, 2019 PREPARED BY: Public Works Director RECOIUIMENDED AGTION: Adopt resolution awarding contract for Candy Cane Park - 2019 lmprovements to A. M. Stephens Construction Co., lnc., of Lodi, in the amount of $347,600, authorizing City Manager to execute change orders in an amount not-to-exceed $102,400, and appropriating funds in the amount of $322,000 BACKGROUND INFORIUIATION: Candy Cane Park (also known as Kandy Kane Park) was originally built in the late 1950's through contributions from Soroptimist lnternational, of Lodi. The same group provided donations in 199111992 to purchase a replacement play structure for the park. The playground had minor American's with Disabilities (ADA) improvements completed in 1997; however, the play structure has since deteriorated and was ultimately removed for code-compliance and safety reasons. The existing park site improvements no longer comply with current accessibility and building code requirements. This project will consist of removing the remaining equipment (swings, footings, benches, etc.) and installing ADA-accessible playground, benches, picnic tables, swings, a drinking fountain, fencing, new accessible concrete sidewalks, and a new stone park sign. Photos of the existing park are shown in Exhibit A. A site plan/playground rendering is shown in Exhibit B. The plans and specifications for this project were approved on March 6,2019. The City received the following five bids for this project on May 22,2019: Above/(Below)Bidder Location B¡d Engineer's Estimate Engineer's Estimate $298,279.00 A.M. Stephens Const. Co Lodi $347,600.00 $49,321.00 T. Amaral Done Right Constr. Brentwood $394,001.00* $95,722.00 McNabb Construction, lnc. Lafayette $397,397.00 $99,1 18.00 United Pavement Maint. Hughson $431,442.00 $133,163.00 Diede Construction, Inc. Woodbridge $539,901.00 5241,622.00 *Corrected Amount Since bid prices came in higher than anticipated, staff will evaluate options to reduce construction costs, as appropriate, to be more consistent with the engineer's estimate. Staff recommends awarding contract for Candy Cane Park - 2019lmprovements to A. M. Stephens Construction Co., lnc., of Lodi, in the amount of $347,600, authorizing City Manager to execute change APPROVED: TM K:\WP\PROJECTS\PARKS\Candy Cane Parkuol I Park n , City Manager 611212019 AdoptResolutionAwardingContractforCandyCanePark-20l9lmprovements toA.M.StephensConstructionCo., lnc.,of Lodi ($347,600),AuthorizingCity Manager to Execute Change Orders ($1 02,400), and Appropr¡ating Funds ($322,000) June 19,2019 Page2 orders in an amount not-to-exceed $102,400, and appropriating funds in the amount of $322,000. FISCAL IMPACT:Nominal increase in Parks maintenance expense, fewer PRCS funds available for emergency repairs and deferred maintenance. Project also reduces City liability with improved accessibility. FUNDING AVAILABLE:Staff requests to transfer $278,000 from PRCS fund balance and appropriating in Parks Capital. PRCS fund balance includes a $2,500 donation from a resident to be used for this project. Fiscal Year 2019120 Budget: Storm (PKCAP-0046. Const. Storm Dr) Measure L (103 Fund) Req uested appropriation : Streets (PKCAP-0046. Const. SF) : PRCS Parks Capital (PKCAP-0046.Const) TOTAL Keys Deputy City Manager/lnternal Services Director $28,000 $100,000 $35,937 $286.063 $450,000 øe cñaÉ;VSwimiey, ¡r Public Works Director Prepared by Jimi Billigmeier, Associate Civil Engineer CES/JB/tdb Attachments cc: PRCS Director K:\WP\PROJECTS\PARKS\Candy Cane Park\201 I Park lmprovements\CAward.doc 6112120'.19 EXHIBIT A Existing-Candy Cane Park RESOLUTTON NO. 2019-1 12 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE CONTRACT FOR CANDY CANE PARK - 2019 IMPROVEMENTS TO A. M. STEPHENS CONSTRUCTION COMPANY, INC., OF LODI; AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDERS; AND FURTHER APPROPRIATING FUNDS WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on May 22, 2019, at '11:00a.m., for Candy Cane Park - 2019 lmprovements, described in the plans and specifications therefore approved by the City Council on March 6,2019; and WHEREAS, said bids have been checked and tabulated and a report thereof filed with the City Manager as follows: Bidder A.M. Stephens Construction Company T. Amaral Done Right Construction McNabb Construction, lnc. United Pavement Maintenance Diede Construction, lnc. .Corrected Amount B¡d $347,600.00 $394,001.00. $397,397.00 $431,442.00 $539,901.00 Above/(Below) Engineer's Estimate $49,321.00 $95,722.00 $99,1 18.00 $133,163.00 $241,622.00 WHEREAS, staff recommends that the City Council award the contract for Candy Cane Park - 2019 lmprovements to A. M. Stephens Construction Company, lnc., of Lodi, in the amount of $347,600; and WHEREAS, staff also recommends that the City Council authorize the City Manager to execute change orders in an amount not to exceed $102,400; and WHERAS, staff also recommends the City Council appropriate funds in the amounts of $35,937, from the fund balance of Streets (PKCAP-0046.Const.SF) for Fiscal Year 2Q18l19 and $286,063 from the fund balance of PRCS Parks Capital (PKCAP-0046.Const) for Fiscal Year 2018t19. NOW, THEREFORE, BE lT RESOLVED that the Lodi City Council does hereby award the contract for Candy Cane Park - 2019 lmprovements to the low bidder, A. M. Stephens Construction Company, lnc., of Lodi, California, in the amount of $347,600; and BE lT FURTHER RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute the contract on behalf of the City and to execute change orders in an amount not to exceed $102,400; and BE lT FURTHER RESOLVED that the Lodi City Council does hereby authorize an appropriation for the Candy Cane Park - 2019 lmprovements, in the amount of $322,000, as set forth above; and BE lT FURTHER RESOLVED that the Lodi City Council does hereby authorize the City Manager to continue budget authority up to the full project budget for this project from fiscal year to fiscal year until such point as the project is complete and is accepted by Council. At such time, all unspent budget authority will return to the fund for re-appropriation by the City Council; and BE lT FURTHER RESOLVED that the Lodi City Council does hereby authorize transferring $278,000 from PRCS fund balance (200.32205) and appropriating in Parks Capital (43299000 .77020). Dated: June 19,2019 lhereby certify that Resolution No. 2019-112 was passed and adopted by the City Council of the City of Lodi in a regular meeting held June 19,2019 by the following vote: AYES: COUNCIL MEMBERS - Johnson, Kuehne, Mounce, and Nakanishi NOES: COUNCIL MEMBERS - None ABSENT: COUNCIL MEMBERS - Mayor Chandler ABSTAIN: COUNCIL MEMBERS - None NIFER Clerk FERRAIOLO 2019-112