Loading...
HomeMy WebLinkAboutAgenda Report - June 5, 2019 C-10AGENDA ITEM Cmv or Lopr Couwcrr, Con¡uruNIcATIoN AGENDA TITLE:Adopt ResolutÍon Authorizing City Manager to Execute Amendment No. 2 for Task Order No. 40 with West Yost Associates, of Davis, for White Slough Water Pollution Control Facility Supervisory Control and Data Acquisition System Upgrade, Arc Flash lnvestigating and Training, and Preliminary Design of Odor Control, Electrical Building, and Ultraviolet Disinfection System Communication lmprovements ($1 1 0,000) MEETING DATE: June 5, 2019 PREPARED BY: Public Works Director RECOMTUIENDED AGTION: Adopt resolution authorizing City Manager to execute Amendment No. 2 to Task Order No. 40 with West Yost Associates, of Davis, for White Slough Water Pollution Control Facility supervisory control and data acquisition system upgrade, arc flash investigating and training, and preliminary design of odor control, electrical building, and ultraviolet disinfection system communication improvements, in the amount of $110,000. BAGKGROUND ¡NFORMATION: The City is currently in the process of conducting needed improvements at the White Slough Water Pollution Control Facility (WSWPCF). The improvements include corrosion repairs to exposed concrete process channels, installation of a coarse screen and septage receiving station, replacing the existing south electrical building, upgrading the existing supervisory control and data acquisition (SCADA) system, and other instrumentation and electrical related upgrades needed to bring this S0-year-old facility up to current standards. Due to the substantial cost and complexity of the overall project, and the impacts to the treatment process, the project is broken up into multiple phases. The initial phase included the assessment and repair of corrosion damage to the headworks influent channels, domestic and industrial pump discharge chambers, primary sedimentation basin influent channel, and other miscellaneous non-submerged concrete in the primary sedimentation basin area. This phase was accepted by Council on November '1, 2017. Task Order No. 40 (the next phase of work also nearing completion) includes engineering design, computer software and hardware, and training services related to the implementation of SCADA system improvements. These improvements are next in overall project priority and will replace the existing, obsolete SCADA software and hardware used to monitor and control plant operations at the facility. During the initial SCADA budget development, West Yost Associates made certain project budget assumptions about the existing SCADA system based on its experience with other facilities of similar age and configuration. The assumptions were necessary because the existing SCADA infrastructure is embedded in old conduit and electric motor control centers throughout the treatment facility and it was not practical to perform the complete infrastructure assessment prior to project budget development. As the work progressed, it was found that several elements of the system are obsolete and no longer C-ro ÏM APPROVED: K:\WP\COUNCIL\2019\CC amend 2 VVYA TO 40.doc er, City Manager 5t23t2019 Adopt Resolution Authoriz¡ng City Manager to Execute Amendment No. 2 for Task Order No. 40 with West Yost Associates, of Davis, for White Slough Water Pollut¡on Control Facility Supervisory Control and Data Acquisition System Upgrade, Arc Flash lnvestigat¡ng and Tra¡n¡ng, and Preliminary Design of Odor Control, Electrical Building, and Ultraviolet Disinfection System Communication lmprovements ($110,000) June 5, 2019 Page2 supported; hardware controlling the various plant functions do not use consistent programming language and naming conventions; Control Building wiring and facility infrastructure is in very poor condition, and there is little reliable programming documentation requiring significant reverse eng¡neering effort to ensure the new graphic interface is compatible with the existing system. Amendment No. 2 is necessary to address the items above and will not to exceed $1 10,000, increasing the total contract amount to $770,010. Staff recommends authorizing City Manager to execute Amendment No. 2 to Task Order No. 40 with West Yost Associates, of Davis, for White Slough Water Pollution Control Facility supervisory control and data acquisition system upgrade, arc flash investigating and training, and preliminary design of odor control, electrical building, and ultraviolet disinfection system communication improvements, in the amount of $110,000. FISCAL IMPAGT:This unplanned but necessary work is needed to complete the SCADA system upgrade element of this contract. This additional cost will not impact the General Fund. FUNDING AVAILABLE: Funding for Task Order No. 40 is budgeted in Fiscal Year 2018119 Wastewater Capital Outlay Fund (53099000.77020) - $t 10,000 Andrew Keys Deputy City Manager/lnternal Services Director Charles E. Swimley, Jr Public Works Director Prepared by Charles E. Swimley, Jr., PublicWorks Director cES/CES/tdb Attachment K:\WP\COUNClL\201g\Cc_amend 2 \ /YA TO 40.doc 5t23t2019 RESOLUTION NO. 2019-91 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE CITY MANAGER TO EXECUTE AMENDMENT NO. 2 TO TASK ORDER NO. 40 WITH WEST YOST ASSOCIATES, OF DAVIS, FOR WHITE SLOUGH WATER POLLUTION CONTROL FACILITY SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM UPGRADE; ARC FLASH INVESTIGATING AND TRAINING; AND PRELIMINARY DESIGN OF ODOR CONTROL, ELECTRICAL BUILDING, AND ULTRA VIOLET DI S I N FECTION SYSTEM COMMU N ICATION I M PROVEMENTS WHEREAS, in accordance with the Task Order Agreement between City of Lodi and West Yost Associates, dated January 13, 1999, West Yost Associates is authorized to complete the scope of work as defined in Task Order No. 40; and WHEREAS, Task Order No. 40 includes engineering design, computer software and hardware, and training services related to the implementation of SCADA system improvements. These improvements are intended to replace the existing, obsolete SCADA software and hardware used to monitor and control plant operations at the facility; and WHEREAS, Task Order No. 40 also includes the preliminary design and construction cost estimates for the coarse screening and septage receiving facility, a new south electrical building, and necessary improvements to enhance communications between the ultra violet disinfection system and the SCADA system. Preliminary design of odor control improvements will be conducted as part of this task order because their location must integrate with the other facilities mentioned above; and WHEREAS, additionally, West Yost Associates will conduct an arc flash investigation of the existing electrical distribution system; and WHEREAS, staff recommends authorizing the City Manager to execute Amendment No. 2 to Task Order No. 40 with West Yost Associates, of Davis, for White Slough Water Pollution Control Facility supervisory control and data acquisition system upgrade; arc flash investigating and training; and preliminary design of odor control, electrical building, and ultraviolet disinfection system communication improvements, in the amount of $1 10,000. NOW, THEREFORE, BE lT RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute Amendment No. 2 to Task Order No. 40 with West Yost Associates, of Davis, California, for White Slough Water Pollution Control Facility supervisory control and data acquisition system upgrade; arc flash investigating and training; and preliminary design of odor control, electrical building, and ultraviolet disinfection system communication improvements, in the amount of $1 10,000. 3:::1===i:::=ti3i:=============================================--======== I hereby certify that Resolution No. 2019-91 was passed and adopted by the City Council of the City of Lodi in a regular meeting held June 5,2019, by the following vote: AYES: COUNCIL MEMBERS - Johnson, Kuehne, Mounce, and Mayor Chandler NOES: COUNCIL MEMBERS - None ABSENT: COUNCIL MEMBERS - Nakanishi ABSTAIN: COUNCIL MEMBERS - No c 2019-91 NIFER Clerk RRAIOLO