Loading...
HomeMy WebLinkAboutAgenda Report - June 5, 2019 C-09c-qAGENDA ITEM Crrv op Lonr Councrl CowrwruNrcATroN AGENDA TITLE:Adopt Resolution Authorizing City Manager to Execute Professional Services Agreement with Diede Construction, lnc., of Woodbridge, for Operations and Maintenance Services of the Central Plume PCE/TCE Remedial Sites ($257,155), and Appropriating Funds ($257, 1 55) MEET¡NG DATE: June 5, 2019 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution authorizing City Manager to execute Professional Services Agreement with Diede Construction, lnc., of Woodbridge, for operations and maintenance services of the Central Plume PCE/TCE remedial sites, in the amount of $257 ,155, and appropriating funds in the amount of $257,155. BACKGROUND INFORMATION: The City currently has two Central Plume TCE/PCE cleanup sites, located at211West Oak Street (Site No. 1) and 531 South Church Street (Site No. 2). Site No. t has the soil vapor and groundwater extraction and granular activated carbon (GAC) treatment units. Site No. 2 has the groundwater GAC treatment units. The Central Plume Source Area is bounded by Pine Street, Oak Street, Church Street, and Pleasant Avenue. Diede Construction, lnc., of Woodbridge, which was the contractorthat installed the Site No. 1 units, has been in contract with the City since 2011 to operate, perform maintenance, collect monthly samples to be analyzed, replace spent GAC in the treatment units, and perform other related duties as specified in the service agreement for Site No. 1. Site No. 2 was completed in 2018 and is also part of the current operation and maintenance service. The proposed Professional Service Agreement is necessary because the current Professional Services Agreement has expired and there has been a reduction in project scope associated with reduced sampling frequency. The proposed Professional Services Agreement also includes estimated labor and material costs for unforeseen repairs which are not part of the normal operation and maintenance of the units. Staff recommends authorizing City Manager to execute Professional Services Agreement with Diede Construction, lnc., of Woodbridge, for operations and maintenance services of the Central Plume PCE/TCE remedial sites, in the amount of $257,155, and appropriating funds in the amount of $257,155 FISCAL IMPACT:Capital and Operations funding for these facilities was anticipated in the current water rate. This pro¡ect does not impact the General Fund. APPROVED: TM K:\WP\PROJECTS\WATER\PCE,TCE\Cenhal\Monitoring PSA\C_Central Plume OM 2019 PSA.doc , City Manager 5t28t2019 Adopt Resolution Author¡zing City Manager to Execute Professional Services Agreement w¡th D¡ede Construction, lnc., of Woodbridge, for Operations and Maintenance Se¡vices of the Central Plume PCE/TCE Remedial Sites ($257,155), and Appropr¡ating Funds ($257,155) June 5, 2019 Page2 FUNDING AVAILABLE Requested Appropriation: Central Plume Settlement Funds (59099000.77020)$257,155 Andrew Keys Deputy City Manager/lnternal Services Director Charles E. Swimley, Jr Public Works Director Prepared by Lyman Chang, Deputy Public Works Director/City Engineer cES/LC/rdb Attachment cc: UtilitySuperintendent Public Works Management Analyst Diede Construction K:\WP\PROJECTS\WATER\PCE,TCE\Central\Monitoring PSA\C_Central Plume OM 2019 PSA.doc 512A12019 RESOLUTION NO. 2019-90 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE CITY MANAGER TO EXECUTE A PROFESSIONAL SERVICES AGREEMENT WITH DIEDE CONSTRUCTION, INC., OF WOODBRIDGE, FOR OPERATIONS AND MAINTENANCE SERVICES OF THE CENTRAL PLUME PCE/TCE REMEDIAL SITES; AND FURTHER APPROPRIATING FUNDS WHEREAS, the City currently has two Central Plume TCE/PCE cleanup sites, located at 211 West Oak Street (Site No. 1) and 531 South Church Street (Site No. 2); and WHEREAS, Diede Construction, lnc., installed the Site No. 1 treatment system and has been under contract with the City since 2011 lo operate, perform maintenance and monthly groundwater sampling, replace spent GAC in the treatment units, and perform other related duties as specified in the service agreement for Site No. 1; and WHEREAS, Site No. 2 was completed in 2Q18 and is also part of the current operation and maintenance service; and WHEREAS, staff recommends authorizing the City Manager to execute a Professional Services Agreement with Diede Construction, lnc., of Woodbridge, for operations and maintenance services of the Central Plume PCE/TCE Remedial Sites, in the amount of $257 ,155; and WHEREAS, staff also recommends that the City Council appropriate funds in the amount of $257,155, from the fund balance of Central Plume Settlement Funds (59099000.77020) for Fiscal Year 2018119. NOW, THEREFORE, BE lT RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute a Professional Services Agreement with Diede Construction, lnc., of Woodbridge, California, for operations and maintenance services of the Central Plume PCE/TCE Remedial Sites, in the amount of $257,155; and BE lT FURTHER RESOLVED that the Lodi City Council does hereby authorize an appropriation for the operations and maintenance services of the Central Plume PCE/TCE Remedial Sites, in the amount of $257 ,155, as set forth above. Dated: June 5,2019 I hereby certify that Resolution No.2019-90 was passed and adopted by the City Council of the City of Lodi in a regular meeting held June 5,2019 by the following vote: AYES: COUNCIL MEMBERS - Johnson, Kuehne, Mounce, and Mayor Chandler NOES: COUNCIL MEMBERS - None ABSENT: COUNCIL MEMBERS - Nakanishi ABSTAIN: COUNCIL MEMBERS - None ^Fn,ryt^*g NIFER M City Clerk 2019-90 ERRAIOLO