Loading...
HomeMy WebLinkAboutAgenda Report - May 15, 2019 C-06AGENDA ITEM C-lo Crrv or Lour CouNcIr, CovTMUNICATToN TM AGENDA TITLE: IUIEETING DATE: PREPARED BY: Accept lmprovements Under Contract for 2018 Pavement Crack Sealing May 1 5,2019 Public Works Director RECOMMENDED AGTION Accept improvements under contract for 2018 Pavement Crack Sealing. BACKGROUND INFORMATION: The primary cause of asphalt failure is water infiltration into the street subgrade. Crack sealing is one of the most basic, and important, preventive street maintenance practices. This contract supplements work performed by Street Division crews to maximize the street area sealed each year. This project consisted of thoroughly cleaning and sealing the existing transverse and longitudinal cracks in pavement surfaces and included other incidental and related work as described in the specifications. The contract was awarded to Pavement Coatings, Co., of Woodland, in the amount of $38,870, on November 7,2018. The contract has been completed in substantial conformance with the specifications approved by City Council on September 19, 2018. Locations are shown on Exhibit A. Photos of the completed work are shown on Exhibit B. The final contract price was $65,483.98. The difference between the original and final contract price is due to one change order that resulted in an additional amount of $26,614, modifying the scope to crack seal Beckman Road, from Pine Street to Kettleman Lane. Change Order No. 1 was approved by City Council on April 17, 2019. The location of which is also shown on Exhibit A with photos of the completed work on Exhibit B. It is recommended that crack sealing occur when the pavement is dry and moderately warm. Due to the extended wet and cold season, construction was significantly delayed. Although delayed, the contract was completed within the original schedule and amount specified in the contract and change order. Following acceptance by the City Council, as required by law, the City Engineer will file a Notice of Completion with the County Recorder's office. The notice serves to notify vendors and subcontractors that the project is complete and begins their 30-day period to file a stop notice requiring the City to withhold payments from the prime contractor in the event of a payment dispute. FISCAL IMPACT By increasing the crack sealing effort, the useful life of the City streets will be extended. APPROVED K:\WP\PROJECTS\STREETSUol I Crack Seal\CAccept.doc , City Manager 511119 Accept lmprovements Under Contract for 2018 Pavement Crack Sealing May 15,2019 Page2 FUNDING AVAILABLE: This project was funded by Transit Development Act. Charles E. Swi ,Jr Public Works Director Prepared by Jimi Billigmeier, Associate Civil Engineer CES/JB/tdb Attachments cc: Pavement Coatings, Co. Utility Superintendent Engineering Tech. ll Pizzo K:\WP\PROJECTS\STREETS\201 8 Crack Seal\CAccept.doc 5t1t2019 Guild Ave.Lockeford St. Elm St. Lodi Ave. VictorRd.(HWY12) Kettleman Ln. CenturyBlvd.Guild Ave.Lodi Ave.Hutchins St.Cherokee Ln.Stockton St.C h e r o k e e L n .Mills Ave.Vine St.Mills Ave.Hwy. 99Hwy. 99Church St.StocktonSt.Pine St.PineSt. Lockeford St.Church St.Lower Sacramento Rd. ElmSt.Ham Ln.Elm St. VineSt.Lower Sacramento Rd.Turner Rd.Turner Rd. Pine St WestgateDr.Century Blvd. HWY 12 W. Turner Rd.Cluff Av.E. T u r n e r R d . µ 0 0.5 10.25 Miles2018 Crack Seal Contract Locations Change Order 1 Exhibit A2018 Crack Seal Locations Change Order 1 K:\WP\PROJECTS\STREETS\2018 Crack Seal\Exhibit B.mxd Beckman Rd Exhibit B 2018 Crack Sealing Project BEFORE AFTER