HomeMy WebLinkAboutAgenda Report - May 15, 2019 C-03AGENDA ITE]I'I c-5 Crry or Lour Coulcrr CouMUNrcATroN 1M AGENDA TITLE: MEETING DATE: PREPARED BY: Approve Plans and Specifications and Authorize Advertisement for Bids for Water Meter Program Phase 8 May 15,2019 Public Works Director RECOMMENDED ACTION Approve plans and specifications and authorize advertisement for bids for Water Meter Program Phase 8. BACKGROUND INFORMATION: At the May 2,2007 City Council meeting, the Water Meter Retrofit Policy was adopted. The primary objectives of the Water Meter Retrofit Policy were to accelerate the installation of residential water meters before the State's 2025 deadline and limit the time period during which some customers would be paying for water on flat rate and others on a usage basis. At the October 20,2010 City Council meeting, a seven-year construction phasing was approved and the property owner meter payment was capped at $300 per parcel. The first of seven construction projects was awarded by Council in March 2011 and included the installation of 3,698 meters and the replacement of 4,220 feet (0.80 miles) of water main. The second construction project was awarded in March 2012 and included the installation of 2,111 meters and the replacement of 26,350 feet (five miles) of water main. The third construction project was awarded in March 2013 and included the installation of 1,465 meters and the replacement of 20,310 feet (3.8 miles) of water main. The fourth construction project was awarded in March 2014 and included the installation of 1,334 meters and the replacement of approximately 24,000 feet (4.5 miles) of water main. The fifth construction project was awarded in Marcn ZOIS and included the installation of 905 meters and the replacement of approximately 16,630 feet (3.1 miles) of water main. The sixth construction project was awarded in March 2016 and included the installation of 938 meters and the replacement of approximately 27,090 feet (5.1 miles) of water main. Due to the complexity and the large area of last phase of the Water Meter Program, it was decided to divide Phase 7 into two phases. Phase 7 was completed and accepted on July 18, 2018 and included installation of 910 meters and replacement of 13,200 feet (2.5 miles) of water main. The project area for Phase I (final phase) is presented in Exhibit A and includes the installation of 876 meters and the replacement of approximately 18,490 feet (3.5 miles) of water main. The estimated construction cost of $7.4 million includes the cost of the water meter assemblies, construction administration, inspection, and contingencies. Construction is expected to begin in August 2019 and conclude in July 2020. Plans and specifications for the project are on file in the Public Works Department. The planned bid opening date is July 17 ,2019. APPROVED: Stephen K:\WP\PROJECTS\WATERWeters\Water Meter Program Phase 8\CPSA_.doc uer, City Manager 51212019 Approve Plans and Specifications and Authorize Advertisement for Bids for Water Meter Program Phase I May 15, 2019 Page 2 FISCAL IMPACT:Water main leak and service repairs will be reduced. No additional costs will be incurred for reading of the meters as they are automatically read concurrent with the reading of the electric meters. FUNDING AVAILABLE: Funding will be identified at project award. Charles E. Swimley, Jr Public Works Director cEs/cES/tdb Attachment cc:Utility Manager Deputy Public Works Direc'tor/City Engíneer Tony Valdivia, RMC Water and Environment K:\WP\PROJECTS\WATER\Meters\Water Meter Program Phase 8\CPSA_.doc s1212019 UV99 UV12 UV12 Lodi Av. Elm St.Ham Ln.Turner Rd.Stockton St.H a r n e y L n . Vine St. Pine St.99Hutchins St.Cherokee Ln.Church St.Mills Av.Lower Sacramento Rd.Century Blvd. Lockeford St.BECKMAN RDINDIANA ST UP RRORANGESTWINERY RD Woodhaven Ln.TAYLOR RD UNNAMED RD HILDE LNHARNEY LNHARNEY LN Church St.99L o c k e f o r d S t . C e n t u r y B l v d .99Mills Av.V i n e S t .99Century Blvd. HARNEY LN EXHIBIT AWater Meter Project BoundaryPhase 8User: lchangPath: K:\WP\PROJECTS\WATER\Meters\Water Meter Program Phase 6\Proj_Bdy.mxd /Legend WMP Phase 8