Loading...
HomeMy WebLinkAboutAgenda Report - April 17, 2019 C-03CITY OF LODI COUNCIL COMMUNICATION AGENDA ITEM C-3 TM AGENDA TITLE: Approve Specifications and Authorize Advertisement for Bids for 2019 Pavement Resurfacing Project MEETING DATE: April 17, 2019 PREPARED BY: Public Works Director RECOMMENDED ACTION Approve specifications and authorize advertisement for bids for 2019 Pavement Resurfacing Project. BACKGROUND INFORMATION: On April 18, 2018 Council adopted a resolution approving this project as the recipient of the Road Repair and Accountability Act of 2017, Senate Bill 1 (SBI) funding for the 2018/2019 Fiscal Year. This pavement resurfacing includes the application of rubberized asphalt cape seal and fiberized slurry seal. The project limits will include various streets in the Park West subdivision, Sunwest I and II, and the alley south of Oak Street (Pleasant Avenue to Church Street), as shown on Exhibit A. The rubberized asphalt cape seal is a two -layer system of a rubberized chip seal on the bottom with a fiberized slurry seal (slurry seal with strands of glass fiber added) on top. The rubberized cape seal will be applied to streets with more surface defects, while only one layer of fiberized slurry seal will be applied to those streets with fewer surface defects. The specifications are on file in the Public Works Department. The planned bid opening date is May 15, 2015. The contract estimate is $1,000,000. Project award is anticipated to be June 5, 2019. FISCAL IMPACT: By investing in the recommended maintenance project, significant capital dollars will be saved by extending the useful life of the pavement and foregoing more costly pavement reconstruction. FUNDING AVAILABLE: Funding will be identified at project award. A portion of the project funding will come from SBI. Prepared by Sean Nathan, Senior Civil Engineer CES/SN/tdb Attachment cc: Utility Manager APPROVED: Charles E. wi nley, Jr. Public Works Director efelb 014 fa,„ Stephen Schwa K:\WP\PROJECTS\STREETS\2019 Pavement Resurfacing\CSA.doc City Manager 4/1/2019 Legend EXHIBIT A 2019 PAVEMENT RESURFACING PROJECT 2019 Locations 111111-7 PP ,.111111/A jiir.tlrr. ..li►r U� 111111111: f� 1 11111 M M Gaul 111\-J�11 =:011:1 s 0 0.25 0.5 Miles Mir e° U liil�� , I 1111111111111, UMW Itit?r++�tititi, AMA Uulu . ■ ..l dmllm Turner Rd. 1111111 IlIllllllIllllIl •• �\':i'il.� 114:1 mml 1■■Innl.o Yiiii:Y��il01 _ 114M t i\ 1111! ,,. 41.III j` + I�� 111, C 2 :rum 11111111' I ^�-11�I 111111111rill,+, :1IIIIIII ___ _ i�+•A 1 111 1111: 1.11.1_1":lii.�Lockeford St.' x'111i :1.11111... ENNUI .■■1■ 11119 1111111111 111!1.1' Ilollll'n !MIN iillilllli 1111111:: 1111111111 1111111111 :11111111 :1111111: "_11111= ill Mill _IM UI •ii; :IIP 11111• m1. 1:� � 1111 ll l llll '14 _ 9111 .L....44,„ ■11iibteni ira `II IF NIB !miming :IIIIIi 1lin: MIN MIEN C 1 ®Q 110M1��1titil 11 i PARA:�' I I �� 1 awl..■ i l i i ��� ..ri .i■1 L1 :11111....1:x... 01,•I• �� nm ■■ '1�� • ........ •■ . = 111 1 111111111 "Ill 111111umnln11111111 :111111 :111111 11111111111111111 nom MEN MEM um