Loading...
HomeMy WebLinkAboutResolutions - No. 91-91RESOLUTION NO. 91-91 A RESOLUTION OF THE LODI CITY COUNCIL AMENDING THE CITY'S ENGINEERING FEES AND RELATED PROCEDURES, AND RESCINDING RESOLUTION NO. 4236 PERTAINING THERETO WHEREAS, the Lodi City Council in 1976 adopted Resolution No. 4236 - Establishing A Subdivision and Development Engineering Fee - and which fee, excluding administrative costs, was established as 3% of the cost of installing public improvements; and WHEREAS, the City is now experiencing different types of development within the City than was existent when Resolution No. 4236 was adopted; and WHEREAS, the cost of providing said engineering, inspection and testing services, including administrative costs far exceeds the 3`0 adopted in Resolution No. 4236; and WHEREAS, it is deemed prudent and in the City's best interest to establish a new method of collecting plan check fees; NOW, THEREFORE, BE IT RESOLVED, by the Lodi City Council that the following engineering fee charges and amended procedures shall apply on new subdivisions and developments: 1. A sliding scale fee shall be charged for reviewing and processing improvement plans. The fee shall be 4.5% of the engineer's estimate for the first $50,000 of off-site improvements, 2.5% of the engineer's estimate for the next 8200,000 of off-site improvements, and 1.5% of the engineer's estimate for the cost of all off-site improvements above $250,000. 2. An improvement plan check fee shall be collected with the first submittal of a set of improvement plans. This non-refundable, initial plan check fee shall be $750 per sheet, or the engineer may submit a preliminary cost estimate with a submittal fee based on that estimate and the above fee schedule. The plan check submittal deposit shall be credited toward the engineering fee collected prior to signing the improvement plans, provided this takes place within one year of submittal, or provided there are no substantial revisions to the plans. Plans submitted 12 months after the initial plan submittal shall be required to pay another initial plan check fee. 3. A $200 fee shall be charged for processing subdivision final maps. This non-refundable fee would be due upon map submittal. RES9191/TXTA.02J Resolution No. 91-91 May 15, 1991 4. A fee of $250 plus $10 per lot shall .be charged for checking and processing parcel maps. This non-refundable fee shall be due upon map submittal. 5. An inspection fee of 2.5°0 of the engineer's estimate for orf -site improvements shall be collected. AND BE IT FURTHER RESOLVED, in the adoption of :hese new engineering fees and amended procedures, reference is hereby riade to Lodi Municipal Code Sections 12.04.150 - Encroachment Permit, Fees, 15.44.090 - Off -Site Improvements and Dedications, Fees, and 16.20.020 - Map Fees - Final and parcel maps; and FURTHER RESOLVED, that this Resolution shall be in force and take effect 60 days from and after its final adopti.on. Resolution No. 4236 is rescinded upon the adoption of this Resolution. Dated: May 15, 1991 I hereby certify that Resolution No. 91-91 was passed and adopted by the Lodi City Council in a regular meeting held May 15, 1991 by the following vote: Ayes: Council Members - Pennino, Pinkerton, Sieglock, Snider and Hinchman (Mayor) Noes: Council Members - None Absent: Council Members - None 2urniit' f e rt , M. Perrin Deputy City Clerk for Alice M. Reimche City Clerk 91-91 RES9191/TXTA.02J