HomeMy WebLinkAboutAgenda Report - March 6, 2019 C-08CITY OF LODI
COUNCIL COMMUNICATION
AGENDA ITEM
C -8
TM
AGENDA TITLE: Adopt Resolution Awarding Contract for Blakely Park - Shade Structures
to Stratus Construction Company, Inc., of Stockton ($48,000)
MEETING DATE: March 6, 2019
PREPARED BY: Public Works Director
RECOMMENDED ACTION:
BACKGROUND INFORMATION:
Adopt resolution awarding contract for Blakely Park — Shade
Structures to Stratus Construction Company, Inc., of Stockton, in
the amount of $48,000.
This project consists of installing two 10 -foot by 24 -foot shade
structures near the Blakely Park North Pool, along with other
miscellaneous improvements to facilitate the shade structures
installations.
Currently, spectators and swimmers do not have shade cover in the area west of the concrete deck for
the Blakely North Pool. This project will install two shade structures in this location to provide respite
from the elements for swimming events and other miscellaneous park use.
The shade structures will utilize two offset steel columns and heavy duty, professional grade fabric that is
fire rated. The fabric canopies are attached by mechanical tensioners which allow for easy fabric
removal at the onset of winter and installation in spring. Improvements will include concrete footings,
furnishing and installing the two steel and fabric shade structures, assembling the shade structures, and
repairing landscape damaged by the installation.
The plans and specifications for this project were approved for on December 19, 2018. The City received
the following eight bids for this project on January 23, 2019:
Bidder Location
Engineer's Estimate
Stratus Construction Company
JB Electric and Construction, Inc.
R.E. Schultz Construction, Inc.
Diede Construction, Inc.
HA Construction
NR Development
Hobbs Construction, Inc.
GoodLand Landscape Const., Inc.
Stockton
Fairfield
Orange
Woodbridge
Fair Oaks
Downey
Friant
Tracy
Bid
$40,000.00
$48,000.00
$49,750.00**
$53,615.00
$66,000.00
$70,000.00*
$70,500.00
$71,292.00*
$77,815.00
* Deemed Non -Responsive as bid did not include Receipt of Addendum No. 1
**Deemed Non -Responsive as bid misstated unit price constitutes a material error
APPROVED:
ephen S
K:\WP\PROJECTS\PARKS\Blakely Park\Shade Structures\CAward.doc
Above/(Below)
Engineer's Estimate
$8,000.00
$9,750.00
$13,615.00
$26,000.00
$30,000.00
$30,500.00
$31,292.00
$37,815.00
hw. ► . uer, City Manager
2/26/2019
Adopt Resolution Awarding Contract for Blakely Park - Shade Structures to Stratus Construction Company, Inc., of Stockton ($48,000)
March 6, 2019
Page 2
Bidder JB Electric and Construction, Inc. ($49,750) was deemed "Non -Responsive" as its bid contained a
misstated unit price. Bidder HA Construction ($70,000) and Bidder Hobbs Construction, Inc. ($71,292)
were deemed "Non -Responsive" as neither of the bid submittals included Receipt of Addendum No. 1.
Staff recommends awarding contract for Blakely Park — Shade Structure to Stratus Construction
Company, Inc. of Stockton, in the amount of $48,000.
FISCAL IMPACT: The project will have a minimal impact on annual maintenance costs. This
project does not impact the General Fund.
FUNDING AVAILABLE: This project will be funded by 2018-19 Community Development Block
Grant funds (CDD-CDBG_FY18-19_BLAKELYSWM) - $48,000
Cac,
Andrew Keys
Deputy City Manager/Internal Services Director
Charles E. Swimley, Jr.
Public Works Director
Prepared by Jimi Billigmeier, Associate Civil Engineer
CES/JB/tdb
Attachment
cc: CDBG Program Specialist
Parks Director
K:\WP\PROJECTS\PARKS\Blakely Park\Shade Structures\CAward.doc 2/26/2019
BLAKELY PARK — SHADE STRUCTURES
1050 S. Stockton Street CONTRACT
CITY OF LODI, CALIFORNIA
THIS CONTRACT made by and between the CITY OF LODI, State of California, herein
referred to as the "City," and RANDOLPH PIERSON, a sole proprietor, DBA Stratus
Construction Co., herein referred to as the "Contractor."
WITNESSETH:
That the parties hereto have mutually covenanted and agreed, and by these presents do
covenant and agree with each other, as follows:
The complete Contract consists of the following documents which are incorporated
herein by this reference, to -wit:
Notice Inviting Bids
Information to Bidders
General Provisions
Special Provisions
Bid Proposal
Contract
Contract Bonds
Plans
The July 1992 Edition,
Standard Specifications,
State of California,
Business and Transportation Agency,
Department of Transportation
Federal Labor Standards Provisions
All of the above documents, sometimes hereinafter referred to as the "Contract
Documents," are intended to cooperate so that any work called for in one and not
mentioned in the other is to be executed the same as if mentioned in all said
documents.
ARTICLE I - That for and in consideration of the payments and agreements hereinafter
mentioned, to be made and performed by the City and under the condition expressed in
the two bonds bearing even date with these presents and hereunto annexed, the
Contractor agrees with the City, at Contractor's cost and expense, to do all the work and
furnish all the materials except such as are mentioned in the specifications to be
furnished by the City, necessary to construct and complete in a good workmanlike and
substantial manner and to the satisfaction of the City the proposed improvements as
shown and described in the Contract Documents which are hereby made a part of the
Contract.
ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and
does hereby employ, the Contractor to provide all materials and services not supplied by
the City and to do the work according to the terms and conditions for the price herein,
and hereby contracts to pay the same as set forth in Section 5.600, "Measurement,
Acceptance and Payment," of the General Provisions, in the manner and upon the
conditions above set forth; and the said parties for themselves, their heirs, executors,
administrators, successors and assigns, do hereby agree to the full performance of the
covenants herein contained.
ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7,
Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the
4.1 02/05/19
K,+WP'PROJECTSTARKS\Blakely Park'',Shade StructuresVCONTRACT.dh
general prevailing wage rate and other employer payments for health and welfare,
pension, vacation, travel time, and subsistence pay, apprenticeship or other training
programs. The responsibility for compliance with these Labor Code requirements is on
the prime contractor.
ARTICLE IV - And the Contractor agrees to receive and accept the following prices as
full compensation for furnishing all materials and for doing all the work contemplated
and embraced in this agreement; also for all loss or damage arising out of the nature of
the work aforesaid or from the action of the elements, or from any unforeseen difficulties
or obstructions which may arise or be encountered in the prosecution of the work until
its acceptance by the City, and for all risks of every description connected with the work;
also for all expenses incurred by or in consequence of the suspension or discontinuance
of work and for well and faithfully completing the work, and the whole thereof, in the
manner and according to the Plans and Contract Documents and the requirements of
the Engineer under them, to -wit:
Perform the work necessary to furnish and install two steel and fabric shade structures
at the Blakely Park northern pool. Installation shall include constructing footings,
assembling the shade structures per manufacturer recommendations, repairing
damaged landscape and other incidental and related work, all as shown on the plans
and specifications for the project.
See Section 6-07 "Description of Bid Items" and Attachments A and B for additional
information.
Item
Description
1
CONTRACT ITEMS
Qty Unit 1 Unit Price
Furnish and Install Two Steel
and Fabric Shade Structures
1 LS $ 48,000.00
Total
$ 48,000.00
ARTICLE V - By my signature hereunder, as Contractor, 1 certify that I am aware of the
provisions of Section 3700 of the Labor Code, which requires every employer to be
insured against liability for workers' compensation or to undertake self-insurance in
accordance with the provisions of that code, and I will comply with such provisions
before commencing the performance of the work of this contract.
ARTICLE VI - It is further expressly agreed by and between the parties hereto that,
should there be any conflict between the terms of this instrument and the Bid Proposal
of the Contractor, then this instrument shall control and nothing herein shall be
considered as an acceptance of the said terms of said proposal conflicting herewith.
ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to
establish lines and grades for the work as specified under the Special Provisions. All
labor or materials not mentioned specifically as being done by the City will be supplied
by the Contractor to accomplish the work as outlined in the specifications.
ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract
after the City Manager has executed the contract, to begin work within 15 calendar
days of receiving the shade structure and components and to finish work within
21 calendar days thereafter.
4.2
KANP',PROJECTSPARKS\Blakely Park\Shade StrucLures\CONTRACT.doc
02/05/19
ARTICLE IX - State of California Senate Bill 854 requires the following:
• No contractor or subcontractor may be listed on a bid proposal for a public works
project unless registered with the Department of Industrial Relations pursuant to
Labor Code section 1725.5 [with limited exceptions from this requirement for bid
purposes only under Labor Code section 1771.1(a)].
• No contractor or subcontractor may be awarded a contract for public work on a
public works project unless registered with the Department of Industrial Relations
pursuant to Labor Code section 1725.5.
• This project is subject to compliance monitoring and enforcement by the
Department of Industrial Relations.
WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME
OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE
CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET
FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR
AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE
CONTRACTOR UNDER THE CONTRACT.
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands
the year and date written below.
CONTRACTOR: CITY OF LODI, a municipal corporation
By:
STEPHEN SCHWABAUER
City Manager
By: Date:
Attest:
Title
JENNIFER M. FERRAIOLO
City Clerk
(CORPORATE SEAL) Approved As To Form:
JANICE D. MAGDICH
City Attorney
4.3
K \SVP\\PROJECTS'•.PARKS\Blakely Park\Shade Structures \CONJ RACT doc
02/05/19
RESOLUTION NO. 2019-25
A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE
CONTRACT FOR BLAKELY PARK - SHADE STRUCTURES TO
STRATUS CONSTRUCTION COMPANY, INC., OF STOCKTON
WHEREAS, in answer to notice duly published in accordance with law and the order of
this City Council, sealed bids were received and publicly opened on January 23, 2019, at
11:00 a.m., for the Blakely Park — Shade Structures, described in the plans and specifications
therefore approved by the City Council on December 19, 2018; and
WHEREAS, said bids have been checked and tabulated and a report thereof filed with
the City Manager as follows:
Bidder
Above/(Below)
Bid Engineer's Estimate
Stratus Construction Company $48,000 $8,000
JB Electric and Construction, Inc. $49,750 $9,750
R.E. Schultz Construction, Inc. $53,615 $13,615
Diede Construction, Inc. $66,000 $26,000
HA Construction $70,000 $30,000
NR Development $70,500 $30,500
Hobbs Construction, Inc. $71,292 $31,292
Goodland Landscape Construction, Inc. $77,815 $37,815
WHEREAS, staff recommends that the City Council award the contract for Blakely Park
— Shade Structure to Stratus Construction Company, Inc., of Stockton, in the amount of
$48,000.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award
the contract for Blakely Park — Shade Structure to the low bidder, Stratus Construction
Company, Inc., of Stockton, California, in the amount of $48,000; and
BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize the
City Manager to execute the contract on behalf of the City of Lodi.
Dated: March 6, 2019
I hereby certify that Resolution No. 2019-25 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held March 6, 2019 by the following vote:
AYES: COUNCIL MEMBERS — Johnson, Kuehne, Mounce, Nakanishi, and
Mayor Chandler
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
CYY\ ,-(AA4Lara
NNIFERFERRAIOLO
City Clerk
2019-25