HomeMy WebLinkAboutAgenda Report - August 2, 2000 H-04yOF� 1COUNCIL • • F0 AGENDA AGENDA TITLE: Award Contract for Beckman Road Reconstruction and Bike Lane Striping, 1,000 Feet South of Vine Street to 700 Feet North of Pine Street (approx. $635,000) MEETING DATE: August 2, 2000 PREPARED BY: Public Works Director The bid opening for the above project is July 26, 2000, the day after the Council Communications are due to the City Clerk. Assuming there are no problems with the bids, an award recommendation will be presented at the Council meeting. Richard C. Prima, JH Public Works Director RCP/lm cc: City Attorney Purchasing Officer Associate Civil Engineer Lindseth APPROVED: H. Dixon Flynn -- Ci y Manager CAWARD 07/21/00 CITY OF LODI COUNCIL • • �4t1FOP�`P AGENDA TITLE: Award Contract for Beckman Road Reconstruction and Bike Lane Striping, 1,000 Feet South of Vine Street to 700 Feet North of Pine Street ($915,000) MEETING DATE: August 2, 2000 PREPARED BY: Public Works Director RECOMMENDED ACTION: That the City Council adopt the attached resolution awarding the contract for the above project to Granite Construction, of Stockton, in the amount of $915,287.40; and appropriate funds in accordance with the recommendation shown below. BACKGROUND INFORMATION: This project consists of reconstructing approximately 160,000 square feet of asphalt concrete pavement, installing 5,900 square feet of curb, gutter or sidewalk, miscellaneous drainage facilities, traffic striping, including bike lanes, and other incidental and related work as shown on the plans and specifications for the project. Plans and specifications for this project were approved on June 7, 2000. The bid items for this project also included seven optional items of work for the installation of 1,800 linear feet of missing sidewalk at several locations along Beckman Road and the space between the west curb and the freeway/ditch, plus an option to deliver the old asphalt pavement grinding to the White Slough Water Pollution Control Facility (WSWPCF) to be used as road base for dirt roads at the Facility. Given recent Council direction to begin installing sidewalk at locations where it is missing, it is our recommendation to approve the construction of all seven optional work items along with the Beckman Road Reconstruction Project. Funding is available through Transportation Development Act (TDA) to cover the optional sidewalk construction costs. However, some of these locations front partially on undeveloped property from which the City could seek reimbursement. Transporting the asphalt grindings to the WSWPCF will be funded by the Facility's road maintenance account. The bid price is much higher than our estimate for a number of reasons. Typically, on a road reconstruction project of this size, only a few larger contractors would bid, and many are very busy this year. The bid prices also reflect the year's rise in oil prices and the associated rise in asphalt prices. Our cost estimate was completed last year with the application for Federal and State funds and, therefore, did not include these higher prices. The City received the following two bids for this project: Bidder Location Base Bid Optional Bid Items Total Engineer's Estimate $633,749.50 $131,520.00 $765,269.50 *Granite Construction Company Stockton $713,420.00 $201,867.40 $915,287.40 A. M. Stephens Construction Lodi $812,474.50 $130,763.00 $943,237.50 APPROVED: Dixon Flynn !! City Manager CAWARD2 10I:I14Y711I97 Award Contract for Beckman Road Reconstruction and Bike Lane Striping, 1,000 Feet South of Vine Street to 700 Feet North of Pine Street ($915,000) August 2, 2000 Page 2 *This project had a Disadvantaged Business Enterprise (DBE) goal of 11 %. This contractor has listed only 0.4% of the contract work being done by a certified DBE subcontractor. The contractor made a good -faith effort to get DBE bidders; however, other than the one DBE listed, they received no response from the DBE's contacted. Their contact with DBE's included advertising in four trade publications and telephone/fax solicitations. Staff feels that the contractor's efforts to recruit DBE's for this project meet the guidelines of the DBE program. We also note that the second bidder had 0% DBE participation. FUNDING: Requested Appropriation: Federal Funds (STIP) $408,670.00 State Funds (STP) 374,000.00 TDA 125,897.40 White Slough Road Maintenance 6.720.00 SUBTOTAL $ 915,287.40 Testing and Contingencies @ 5% (TAA) 45.000.00 TOTAL $ 960,287.40 Project Estimate: $783,000.00 Bid Opening Date: July 26, 2000 Funding Available: Vicky McAt ie, Finance Director 604;4 Richard C. Prima, Jr. Public Works Director Prepared by Mark J. Lindseth, Associate Civil Engineer RCP/MJUIm Attachment cc: Randy Hays, City Attorney Joel Harris, Purchasing Officer Mark Lindseth, Associate Civil Engineer George Bradley, Street Superintendent Carlos Tobar, Transportation Manager CAWARD2 08/02/00 RESOLUTION NO. 2000-139 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE CONTRACT FOR BECKMAN ROAD RECONSTRUCTION AND BIKE LANE STRIPING, 1,000 FEET SOUTH OF VINE STREET TO 700 FEET NORTH OF PINE STREET WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council sealed bids were received and publicly opened on July 26, 2000, at 11:00 a.m. for Beckman Road Reconstruction and Bike Lane Striping, 1,000 Feet South of Vine Street to 700 Feet North of Pine Street, described in the specifications therefore approved by the City Council on June 7, 2000; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as follows: Bidder Location Base Bid Optional Bid Items Total Engineer's Estimate $633,749.50 $131,520.00 $765,269.50 *Granite Construction Company Stockton $713,420.00 $201,867.40 $915,287.40 A. M. Stephens Construction Lodi $812,474.50 $130,763.00 $943,237.50 'This project had a Disadvantaged Business Enterprise (DBE) goal of 11%. This contractor has listed only 0.4% of the contract work being done by a certified DBE subcontractor. The contractor made a good -faith effort to get DBE bidders; however, other than the one DBE listed, they received no response from the DBE's contacted. Their contact with DBE's included advertising in four trade publications and telephonelfax solicitations. Staff feels that the contractor's efforts to recruit DBE's for this project meet the guidelines of the DBE program. We also note that the second bidder had 0% DBE participation. WHEREAS, this project is being funded with State and Federal funds which require that the contractor meet certain Disadvantaged Business Enterprise (DBE) program goals; and WHEREAS, the program goal of this project was 11% for disadvantaged -business participation, and if these goals are not met, the contractor must show that a good -faith effort was made to meet the goal; and WHEREAS, Granite Construction has listed only 0.4% of the contract work being done by a certified DBE subcontractor. The contractor made a good -faith effort to get DBE bidders; however, other than the one DBE listed, they received no response from the DBE's contacted. Their contact with DBE's included advertising in four trade publications and telephone/fax solicitations; and WHEREAS, staff recommends award of the contract for Beckman Road Reconstruction and Bike Lane Striping, 1,000 Feet South of Vine Street to 700 Feet North of Pine Street to Granite Construction, of Stockton, California; and WHEREAS, staff further recommends that the City Council make a finding that the contractor's efforts to recruit DBE's for this project meet the guidelines of the DBE program. We also note that the second bidder had 0% DBE participation. NOW, THEREFORE, BE IT RESOLVED by the Lodi City Council that the award of the contract for Beckman Road Reconstruction and Bike Lane Striping, 1,000 Feet South of Vine Street to 700 Feet North of Pine Street be and the same is awarded to Granite Construction of Stockton, California in the amount of $915,287.40; and BE IT FURTHER RESOLVED, that the Lodi City Council hereby makes the finding that the contractor, Granite Construction of Stockton, California has provided proof that a good -faith effort was made to meet the DBE goal; and BE IT FURTHER RESOLVED, that funds be appropriated as follows: Federal Funds (STIP) $408,670.00 State Funds (STP) 374,000.00 TDA 125,897.40 White Slough Road Maintenance 6.720.00 SUBTOTAL $915,287.40 Testing and Contingencies @ 5% (TDA) 45.000.00 TOTAL $960,287.40 Dated: August 2, 2000 -------------------------------------------------------- ------------------------------------------------------- I hereby certify that Resolution No. 2000-139 was passed and adopted by the City Council of the City of Lodi in a regular meeting held August 2, 2000, by the following vote: AYES: COUNCIL MEMBERS - Hitchcock, Land, Nakanishi, Pennino and Mann (Mayor) NOES: COUNCIL MEMBERS - None ABSENT: COUNCIL MEMBERS - None ABSTAIN: COUNCIL MEMBERS - None AN J�BLAC STON City Clerk - 2000-139